| 1 | Cutting road and making good the same including supply of extra=quantities of materials i.e. aggregate, moorum screening, red bajri and labour required including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 2 | Bituminous portion |
| 3 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.On W.B.M / W.M.M. @ 0.4 kg/ sqm including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 4 | 2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively, per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt with paving machine & latest technology machineries of road surfacing works including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 5 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road roller all complete including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 6 | Providing and laying hot applied thermoplastic compound 2.5mm thick i/c reflectoring glass bads @ 250 gms per Sqm area thickness of 2.5mm is excluding of surface applied glass beads as per IRC: 35. The finished surface to be level uniform and free from steaks and holes entire carriage of material up to all leads,lifts and cost of all other incidentals including white strips, Zebra Crossing , Speed Limit Sign, No Horn Signs, Cat Eyes as required at different places including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a any lead in thecampus. |
| 8 | All Kind of Soil |
| 9 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level including entire carriage of materials in all leads, lifts, height and cost of all other incidentals. |
| 10 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 11 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 12 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |