Health and Family Welfare Government Departments Closing in 0 days TDR #36200845

Tender For Supply Of Modular Operation Theatres And Recovery Room With Turn Key Project /2022-23

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
29.93 Crore
Estimated cost
Bid Submission
20 Mar 2023
0 days left
EMD
3.25 Lakhs
Bank guarantee accepted
Document Fee
32500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of Modular Operation Theatres And Recovery Room With Turn Key Project / 2022-23 , Name Of The Item : , Part 1: Modular Construction Wall & Ceiling System In Operation Theatre & Trauma Unit Complex , Part 1: Modular Construction Flooring , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Laminar Air Flow ( Laf ) Ceiling , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Air Exhaust Shaft / Box As Per Technical Specificationsas Per Technical Specifications And Boq , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Over Flow Port As Per Technical Specifications And Boq. , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Illumination Lights In Each Area Of The Ots , Part 1: Modular Construction Hospital Doors , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of 15” Touch Screen Ot Control Panel , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Built-In Storage Cabinet System Integrated In The Wall, , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of X- Ray Viewer Led Or Equivalent , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Providing Magnetic Writing Board In Each Operating Theatre. Ecifications And Boq. , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Scrub Sink Two Bay Wash Basin , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Orthopaedic Electrohydraulic Ot Table , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Surgical Booms A ) Supply, Installation, Testing & Commissioning Of Double Arm Anaesthesia Pendant- , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Surgical Booms B ) Supply, Installation, Testing & Commissioning Of Double Arm Surgeon Pendent , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Digital Integration Solution In Operation Theatre , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Double Dome Ot Light With Full Hd Camera And Third Arm For Monitor , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Digital Pacs Viewing Station 32” For Operation Theatres , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Interactive Collaboration Display , Part 3: Electrical, Hvac, Mgps Supply, Installation, Testing & Commissioning Of Electrical Work Inside Operation Theatre , Recovery Unit , Corridor & Auxiliary Rooms- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Supply, Installation, Testing & Commissioning Of Ups :10Kva On Line 30 Min Back Up- Complete As Per Enclosed Technical Specifications And Boq , Part 3: Electrical, Hvac, Mgps Hvac A ) Supply, Installation, Testing & Commissioning Of Ahu With Air Cooled Package Chiller / Condensing Units For Operation Theatre- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Hvac B ) Supply, Installation, Testing & Commissioning Of Ductwork And Accessories- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Hvac C ) Supply, Installation, Testing & Commissioning Of Split Ac 2 Ton- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline A ) Supply, Installation, Testing & Commissioning Of Medical Gas Piping Inside All Ot’S - Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline B ) Supply, Installation, Testing & Commissioning Of Isolation Valve- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline C ) Supply, Installation, Testing & Commissioning Of Zonal Isolation Valve Boxes- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline D ) Supply, Installation, Testing & Commissioning Of Medical Gas Lcd Digital Area Alarm- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline E ) Supply, Installation, Testing & Commissioning Bed Head Panel- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline F ) Supply, Installation, Testing & Commissioning Of Agss- Complete As Per Enclosed Technical Specifications And Boq , Part 3: Electrical, Hvac, Mgps Demolishing, Reconstructing, Water Proofing, Plumbing, Repainting And Replacement , Part 3: Electrical, Hvac, Mgps Hospital Nurse Call, Intelligent Addressable Fully Redundant Fire Alarm Detectionsystem For Recovery Room- Complete As Per Enclosed Technical Specifications And Boq

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 28-Feb-2023 Sale Period Corrigendum Date 20-Mar-2023
2 02-Mar-2023 Corrigendum regarding payment Other 20-Mar-2023

BOQ

Name of Tender:
Sl. No. Item Description
1Name of the Item :
2Part 1: Modular ConstructionWall & Ceiling system in Operation Theatre & Trauma unit complex
3Part 1: Modular ConstructionFlooring
4Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Laminar Air Flow (LAF) Ceiling
5Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Air Exhaust shaft / box as per technical specificationsas per technical specifications and BOQ
6Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Over Flow Port as per technical specifications and BOQ.
7Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of illumination lights in each area of the OTs
8Part 1: Modular ConstructionHospital Doors
9Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of 15” Touch Screen OT Control panel
10Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of built-in Storage cabinet system integrated in the wall,
11Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of X- Ray viewer LED or equivalent
12Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Providing Magnetic Writing Board in each operating theatre. ecifications and BOQ.
13Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Scrub Sink Two bay wash basin
14Part 1: Modular ConstructionSupply, Installation, Testing & Commissioning of Orthopaedic Electrohydraulic OT Table
15Part 2: Surgical Booms, LED OT Lights & Digital Integration Surgical Boomsa)Supply, Installation, Testing & Commissioning of Double Arm Anaesthesia pendant-
16Part 2: Surgical Booms, LED OT Lights & Digital IntegrationSurgical Boomsb)Supply, Installation, Testing & Commissioning of Double Arm Surgeon Pendent
17Part 2: Surgical Booms, LED OT Lights & Digital IntegrationSupply, Installation, Testing & Commissioning Digital integration solution in Operation Theatre
18Part 2: Surgical Booms, LED OT Lights & Digital IntegrationSupply, Installation, Testing & Commissioning of Double Dome OT Light with Full HD Camera and third arm for monitor
19Part 2: Surgical Booms, LED OT Lights & Digital IntegrationSupply, Installation, Testing & Commissioning of Digital PACS Viewing Station 32” for Operation Theatres
20Part 2: Surgical Booms, LED OT Lights & Digital IntegrationSupply, Installation, Testing & Commissioning of Interactive Collaboration Display
21Part 3: Electrical, HVAC, MGPSSupply, Installation, Testing & Commissioning of Electrical work inside Operation Theatre , Recovery unit ,Corridor & auxiliary rooms- complete as per enclosed technical specifications and BOQ.
22Part 3: Electrical, HVAC, MGPSSupply, Installation, Testing & Commissioning of UPS :10KVA ON Line 30 Min Back up- complete as per enclosed technical specifications and BOQ
23Part 3: Electrical, HVAC, MGPSHVACa)Supply, Installation, Testing & Commissioning of AHU with Air Cooled Package Chiller / Condensing Units for Operation Theatre- complete as per enclosed technical specifications and BOQ.
24Part 3: Electrical, HVAC, MGPSHVACb)Supply, Installation, Testing & Commissioning of Ductwork and accessories- complete as per enclosed technical specifications and BOQ.
25Part 3: Electrical, HVAC, MGPSHVACc)Supply, Installation, Testing & Commissioning of Split AC 2 Ton- complete as per enclosed technical specifications and BOQ.
26Part 3: Electrical, HVAC, MGPSMedical Gas pipelinea)Supply, Installation, Testing & Commissioning of Medical Gas piping inside all OT’s - complete as per enclosed technical specifications and BOQ.
27Part 3: Electrical, HVAC, MGPSMedical Gas pipelineb)Supply, Installation, Testing & Commissioning of Isolation valve- complete as per enclosed technical specifications and BOQ.
28Part 3: Electrical, HVAC, MGPSMedical Gas pipelinec)Supply, Installation, Testing & Commissioning of Zonal Isolation Valve Boxes- complete as per enclosed technical specifications and BOQ.
29Part 3: Electrical, HVAC, MGPSMedical Gas pipelined)Supply, Installation, Testing & Commissioning of Medical Gas LCD Digital Area Alarm- complete as per enclosed technical specifications and BOQ.
30Part 3: Electrical, HVAC, MGPSMedical Gas pipelinee)Supply, Installation, Testing & Commissioning Bed head panel- complete as per enclosed technical specifications and BOQ.
31Part 3: Electrical, HVAC, MGPSMedical Gas pipelinef)Supply, Installation, Testing & Commissioning of AGSS- complete as per enclosed technical specifications and BOQ
32Part 3: Electrical, HVAC, MGPSDemolishing, Reconstructing, Water Proofing, Plumbing, Repainting and Replacement
33Part 3: Electrical, HVAC, MGPSHospital Nurse Call, Intelligent Addressable Fully Redundant Fire alarm detectionsystem for recovery room- complete as per enclosed technical specifications and BOQ

AI Tender Summary

OUR REF NO 36200845
AUTHORITY Government Departments
TENDER VALUE 29.93 Crore
LAST DATE 20-03-2023
Authority
Authority Name Haffkine Bio Pharmaceutical Corporation Limited
Work Description Supply Of Modular Operation Theatres And Recovery Room With Turn Key Project / 2022-23 , Name Of The Item : , Part 1: Modular Construction Wall & Ceiling System In Operation Theatre & Trauma Unit Complex , Part 1: Modular Construction Flooring , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Laminar Air Flow ( Laf ) Ceiling , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Air Exhaust Shaft / Box As Per Technical Specificationsas Per Technical Specifications And Boq , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Over Flow Port As Per Technical Specifications And Boq. , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Illumination Lights In Each Area Of The Ots , Part 1: Modular Construction Hospital Doors , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of 15” Touch Screen Ot Control Panel , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Built-In Storage Cabinet System Integrated In The Wall, , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of X- Ray Viewer Led Or Equivalent , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Providing Magnetic Writing Board In Each Operating Theatre. Ecifications And Boq. , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Scrub Sink Two Bay Wash Basin , Part 1: Modular Construction Supply, Installation, Testing & Commissioning Of Orthopaedic Electrohydraulic Ot Table , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Surgical Booms A ) Supply, Installation, Testing & Commissioning Of Double Arm Anaesthesia Pendant- , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Surgical Booms B ) Supply, Installation, Testing & Commissioning Of Double Arm Surgeon Pendent , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Digital Integration Solution In Operation Theatre , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Double Dome Ot Light With Full Hd Camera And Third Arm For Monitor , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Digital Pacs Viewing Station 32” For Operation Theatres , Part 2: Surgical Booms, Led Ot Lights & Digital Integration Supply, Installation, Testing & Commissioning Of Interactive Collaboration Display , Part 3: Electrical, Hvac, Mgps Supply, Installation, Testing & Commissioning Of Electrical Work Inside Operation Theatre , Recovery Unit , Corridor & Auxiliary Rooms- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Supply, Installation, Testing & Commissioning Of Ups :10Kva On Line 30 Min Back Up- Complete As Per Enclosed Technical Specifications And Boq , Part 3: Electrical, Hvac, Mgps Hvac A ) Supply, Installation, Testing & Commissioning Of Ahu With Air Cooled Package Chiller / Condensing Units For Operation Theatre- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Hvac B ) Supply, Installation, Testing & Commissioning Of Ductwork And Accessories- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Hvac C ) Supply, Installation, Testing & Commissioning Of Split Ac 2 Ton- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline A ) Supply, Installation, Testing & Commissioning Of Medical Gas Piping Inside All Ot’S - Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline B ) Supply, Installation, Testing & Commissioning Of Isolation Valve- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline C ) Supply, Installation, Testing & Commissioning Of Zonal Isolation Valve Boxes- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline D ) Supply, Installation, Testing & Commissioning Of Medical Gas Lcd Digital Area Alarm- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline E ) Supply, Installation, Testing & Commissioning Bed Head Panel- Complete As Per Enclosed Technical Specifications And Boq. , Part 3: Electrical, Hvac, Mgps Medical Gas Pipeline F ) Supply, Installation, Testing & Commissioning Of Agss- Complete As Per Enclosed Technical Specifications And Boq , Part 3: Electrical, Hvac, Mgps Demolishing, Reconstructing, Water Proofing, Plumbing, Repainting And Replacement , Part 3: Electrical, Hvac, Mgps Hospital Nurse Call, Intelligent Addressable Fully Redundant Fire Alarm Detectionsystem For Recovery Room- Complete As Per Enclosed Technical Specifications And Boq
Basic Detail
Tender No E-5002HBPCL/PC/EQU/ Modular Operation Theatres and
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 02 Mar 2023
Submission Date 20 Mar 2023
Open Date 01 Mar 2023
Finance
Tender Value 29.93 Crore
Tender Fee 32500
EMD 3.25 Lakhs
Exemption Not Available
Document List
c5a75825-d96e-4c34-99a5-960c1990d299.html
BOQ_1517437.xls
E5002TenderDocument.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 02, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 20, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 01, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

c5a75825-d96e-4c34-99a5-960c1990d299.html

xls

BOQ_1517437.xls

pdf

E5002TenderDocument.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders