Tender For Control Valve And On Off Valve
Tender Overview
Project Description
Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing At Manufacturers Works, Packing, Supply Of Control Valve And On-Off Valve , Control Valves& On-Off Valve (Ball) , Control Valvesas Per Doc. No. 081757C001-701-Sr-1541-003A , Tag Nos-701-Pv-1204N , Mandatory Spares Fortag No-701-Pv-1204N , Trim Set Consisting Of Seat, Seat Ring/Seal Ring, Ball/Disc With Stem. , Diaphragm , Air Filter Regulator , Bonnet Gaskets/Gland Packing , Special Accessories Like Solenoid Valve, Volume Boosters, Position Transmitters (Wherever Applicable), Proximity Switches, I/P Converters, O-Rings Of Piston Actuators Etc. , Smart Positioner With Linkages , On-Off Valve (Ball) As Per Doc. No. 081757C001-701-Sp-1541-003B , Tag Nos-701-Sdv-4501N , Mandatory Spares Fortag No-701-Sdv-4501N , Trim Set Consisting Of Seat, Seat Ring/Seal Ring, Ball/Disc With Stem. , Proximity Switches , Solenoid Valves , Air Filter Regulator , Bonnet Gaskets/Gland Packing , Special Accessories Like Quick Exhaust Valve, Volume Boosters, Temperature Dependent Fuses O-Rings Actuators Etc. , Pressure Gauge And Manual Valve (Manual Testing) , Supervision Of Erection And Commissioning (As Applicable) Of Items Specified Above , Unit Rate Forsupervision Of Erection And Commissioning For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Of Erection And Commissioning Of Items For Quoted Item As Per Enclosed Instructions To Vendor Overtime Rate Per Hour (Beyond Normal 8 Hours On Normal Working Days). ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate Forsupervision Of Erection And Commissioning For Quoted Itemsas Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). ( Bidders To Quote Over Timerate Per Hour ) => Limited
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Mar-2023 | Corrigendum 1 | Date | 22-Mar-2023 |
| 2 | 23-Mar-2023 | Corrigendum 2 | Date | 03-Apr-2023 |
| 3 | 04-Apr-2023 | Corrigendum-3 | Date | 17-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Control Valves& On-Off Valve (Ball) |
| 2 | Control Valvesas per Doc. No. 081757C001-701-SR-1541-003A , Tag Nos-701-PV-1204N |
| 3 | Mandatory Spares forTag no-701-PV-1204N |
| 4 | Trim set consisting of Seat, Seat ring/Seal ring, Ball/Disc with Stem. |
| 5 | Diaphragm |
| 6 | Air Filter Regulator |
| 7 | Bonnet Gaskets/Gland packing |
| 8 | Special Accessories like Solenoid valve, Volume Boosters, Position transmitters (wherever applicable), proximity switches, I/P converters, O-rings of piston actuators etc. |
| 9 | Smart Positioner with linkages |
| 10 | On-Off Valve (Ball) as per Doc. No. 081757C001-701-SP-1541-003B , Tag Nos-701-SDV-4501N |
| 11 | Mandatory Spares forTag no-701-SDV-4501N |
| 12 | Trim set consisting of Seat, Seat ring/Seal ring, Ball/Disc with Stem. |
| 13 | Proximity Switches |
| 14 | Solenoid Valves |
| 15 | Air Filter Regulator |
| 16 | Bonnet Gaskets/Gland packing |
| 17 | Special Accessories like Quick exhaust valve, Volume Boosters, Temperature dependent fuses O-rings actuators etc. |
| 18 | Pressure gauge and Manual valve (Manual testing) |
| 19 | Supervision of erection and commissioning (as applicable) ofitems specified above |
| 20 | Unit rate forSupervision of erection and commissioning for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days.( BIDDERS TO QUOTEUNIT RATE FOR DIEM CHARGES ) |
| 21 | Unit rate forSupervision of erection and commissioning of items for Quoted item as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days).( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
| 22 | Unit rate forSupervision of erection and commissioning for quoted itemsas per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site).( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender