Tender For Recapitalization Of Drr 636 W, rajouri-Jammu And Kashmir

Public Works Department-PWD has published Tender For Recapitalization Of Drr 636 W. Submission Date for this Tender is 17-02-2023. Road Work Tenders in rajouri Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

36189175
Tender For Recapitalization Of Drr 636 W
Open Tender
Indian
Jammu And Kashmir
rajouri
17-02-2023

Tender Details

Tender For Recapitalization Of Drr 636 W-1 Complete Overhauling Of The Engine By Way Of Removing The Engine Foundation Bolts And Extracting The Engine By Crane. Dismantling The Engine And Removing The Damaged / Worn Out Parts. P / F Of Cylinder Lining-4Nos., Piston Assembly Along With Piston Rings-4Nos. P / F Of Big End And Small End Bearings To The Connecting Rod, Gudgeon Pin-4Nos., Connecting Rod Bolts Along With Nut 8Nos. P / F Of Crank Bearing, Head Gasket Along With Complete Gasket Set. P / F Of Timing Gear Set Along With Oil Seal. P / F Of Inlet And Outlet Valves Along With Valve Guide 08Nos. P / F Of Circlip-1Set, Exhaust Valve 4Nos. Along With Springs. P / F Of Camshaft Bush And Cam Shaft Bearing, Rocker Arm. P / F Of Fly Wheel Ring, Complete Water Body Assembly . The Job Also Includes Grinding Of Crank Shaft To The Required Size, Fitment Of New Cylinder Liner, Setting Of Crank Shaft For Free Rotation , Line Boring Of Cylinder Block& Fitting Of Cylinder Lining, Grinding Of Cam Shaft Bush , Fitment Of Cam Shaft, Grinding Of Valve & Valve Seat To Match Each Other, Fitment Of Valve Guides , Facing Of Cylinder Head, Fitment Of Small End Bush To Connecting Rod, P / F Of Oil Filter-1 No., Fuel Filter Set-1No., High Pressure Injector Pipe-4 Nos., Fuel Pipe Main ( Fuel Tank To Feed Pump ) -01No., Fuel Pipe Main ( Feed Pump To Filter ) -01No., Fuel Pipe ( Filter To Fip Pump ) -01No., Fuel Pipe Return ( Fip To Fuel Tank ) -01No., Pipe Oil Pressure-01No., Oil Pressure Gauge -01No., Water Temp. Gauge-1 No., Fan Belt-1 No. Complete Assembling Of The Engine With New Parts, Testing It And Mounting On The Machine. P / F Of Engine Sump Studs-12Nos.The Job Includes Cost Of Material And Labour Charges. ( M.Oil-18 Ltrs To Be Provided By The Department ) 2 Complete Repair / Calibration Off.I.P By Way Ofremoval Of Defective F.I.P From Engine, Cleaning With Petrol And Removing The Damaged Partsp / F Plunger Head-1No., Plungers-4Nos., Delivery Valves, With Elements, Fip Coupling Along With Cross With Spacer, Governor Shaft, Nozzles, Calibration Of Nozzle Injector With Pump. P / F Of Pump Cam Shaft, Adapter Fuel Injection Pump, Gear, Non-Return Valve, Feed Pump Set -01No, Calibration & Tuning Offip, Job Includes Cost Of Material And Labour Charges & Calibration And Tuning Of Fip With Engine 3 Repair To Radiator By Removing The Radiator From The Machine. Removing By Way Of Heating The Solders Of Upper And Lower Reservoirs. Removing By Way Of Gas Cutter 4No. Of Blocked Tube And Replacing With New Tubes By Way Of Soldering. Plugging The Leakage At 4 Points On The Core Of Radiator. Cleaning The Core By Way Of Using Of Caustic Soda And Flushing Out With Water. Soldering The Upper And Lower Reservoirs And Fitting On The Machine. P / F Of New Upper & Lower Hose Pipes With Clamps. P / F Of Radiator Foundation Bolts And Radiator Cap Complete Job. 4 Repair To Self Starter By Dismantling It Completely, Cleaning With Petrol, Inspection Of Parts And Then Replacement Of Damaged / Worn Out Parts By P / F Of Set Of Field Coil, Carbon Brush Set-01No., New Armature, Solenoid Switch With Bendex Drive-01No., P / F Of Bearing Along With Long Bolts, P / F Of Carbon Bush Moving Plate Assembling And Testing. The Job Includes Cost Of Material, Labour Charges And Taxes. 5 Complete Overhauling Of The Gear Box And Speed Shaft. Removing The Damaged / Worn Out Parts. P / F Of Coupling Shaft-1No.Along With Ball Bearing, Bearing Housing And Reverse Bevel Pinion Along With Ball Bearing. P / F Of 2Nd Speed Pinion, Speed Wheel ( Slow ) -1No. And Speed Wheel ( Fast ) -1No. P / F Of Bushes, Speed Pin, Washer, End Washer. Providing Of Bushes 2No.By Way Of Grinding And Fitting To Size. P / F Of Gasket Set. Complete Job Including Cost Of Material And Labour Charges. 6 Repair To Steering Gear Assembly By Dismantling It Completely , Cleaning, Inspection Of Parts And Replacement Of Damaged / Worn Out Parts By P / F Of Shaft Fork -01No., Bracket For Quadrant -01No., Bearing -01No., Key -02Nos., Worm Wheel -01No., Bevel Wheel -01No., Bevel Pinion -01No., Bush -01No., Bush-01No., Bush -01No., Stud -6Nos., Thrust Bearing -1No., Grease Tube -03Nos Bolt -12Nos., Nuts -12Nos., Gasket Set-01No., Universal Ball Jointand Testing .The Job Includes Cost Of Material &Labour Charges And Taxes. 7 Repair To The Differential Shaft Of The Machine By Way Of Dismantling From The Machine Cleaning With Diesel And Then P / F Of Damaged Parts Like Bushes -4Nos. By Way Of Turning And Fitting, Bevel Wheel-1No., Bevel Wheel With Holes-1 No., Shaft-1No., Bearing Housing-1No., Bolt-12Nos., Castle Nut-8Nos., Union-2Nos., Assembling And Testing. The Job Includes Cost Of Material And Labour Charges. 8 Repair To Clutch ( Forward And Reverse ) Of The Machine By Dismantling The System And Removing The Damaged / Worn Out Parts. P / F Of Clutch Plate Driven ( In 3 Segments ) 1No. Each ( Forward And Reverse ) . P / F Of Plate Hub & Back Assy. 01No., Cotter Pin, Link Lever-10Nos., P / F Of Pin For Lever Adjusting-2Nos.The Job Includes Cost Of Material , Labour Charges And Taxes 9 Repair To Front Rolls And Axle By Dismantling From The Machinecompletely , Checking Of Parts Removing Of Damaged / Worn Out Parts And Then P / F Of Front Axle Along With Bushes-04Nos., Mud Ring -01No., Cover Plate-2Nos., Grease Nipple-2Nos., P / F Of Bolts 12 Nos. Complete Job. The Job Includes Cost Of Material And , Labour Charges 10 Repair To Rear Rolls By Dismantling From The Machine Completely Checking Of Parts , Removing Of Damaged / Worn Out Parts Then P / F Of Bush Inner -02 Nos., Bush Outer -02Nos., Peg -01No., Dust Cover -02Nos., Gear Driven 1No., Thrust Washer -02Nos., Pin Dowel -04Nos., Lock Plate -02Nos., Mc Bolt-10Nos., Nut -10Nos., Cover -02 Nos . , Gasket -02Nos., Grease Nipple -02 Nos., Pacer Washer -12Nos. In Place Of Damaged / Worn Out Parts After Re-Metaling Of The Axle And Turning It To The Required Size & Shape. The Job Includes Cost Of Material , Labour Charges And Taxes 11 Repair To Electric System Of The Machine, Removing The Damaged Wiring And Replacement With New. P / F Of Battery Leads-2Nos., Along With Thimbles, P / F Of Wiring Extending To Self Starter And Dynamo, P / F Of Ampere Meter, Oil Pressure Meter. The Job Includes Cost Of Material And Labour Charges. 12 Painting Of Roller By Way Of Removing Of Perished Paint, Removing The Old Paints By Scratching And Making The Surface Even By Applying Putty And Spacer, Providing Of Primer Paintof Red Oxide , Applying Two Coats Of Paint To Machine With Dept. Colour And Letter Writing. Complete Servicing Of Road Roller And Greasing, Job Includes Cost Of Material And Labour Charges. 13 Repair Operator Seat By Way Removing The Damaged Parts With Gas Cutting And Perished Material, Strengthening Of Seat By Welding Of Angle Iron, P / F Of Nuts & Bolts , Raxine Cushion, And Seat Cover, Job Includes Cost Of Material And Labour Charges. Complete Job Including Allied Works, 14 Repair To Chasis By Way Of Welding And Strengthening The Cracked Portion, Removing The Dents From Bonnet And Doors. P / F Of New Door Hinges-04 Nos And Bonnet Clips. Strengthening The Foot Rest By Welding. Complete Job. 15 Gear Oil

Key Value

Document Fees
INR 500 /-
EMD
Refer document
Tender Value
INR 2.70 Lakhs /-

BOQ Items

Name of Work:Recapitalization of DRR-636 W
Sl. No. Item Description
1Complete overhauling of the engine by way of removing the Engine foundation bolts and extracting the engine by crane. Dismantling the engine and removing the damaged/ worn out parts. P/f of cylinder lining-4Nos., Piston assembly along with piston rings-4Nos. P/f of big end and small end bearings to the connecting rod, gudgeon pin-4Nos., connecting rod bolts along with nut 8Nos. P/f of crank bearing, head gasket along with complete gasket set. P/f of timing gear set along with oil seal. P/f of inlet and outlet valves along with valve guide 08Nos. P/f of circlip-1set, exhaust valve 4Nos. along with springs. P/f of camshaft bush and cam shaft bearing, rocker arm. P/f of fly wheel ring, complete water body assembly . The job also includes grinding of crank shaft to the required size, fitment of new cylinder liner, setting of crank shaft for free rotation , line boring of cylinder block& fitting of cylinder lining, grinding of cam shaft bush ,fitment of cam shaft, grinding of valve & valve seat to match each other, fitment of valve guides , facing of cylinder head,fitment of small end bush to connecting rod, P/f of oil filter-1 no., fuel filter set-1no., high pressure injector pipe-4 nos., fuel pipe main (fuel tank to feed pump)-01no.,fuel pipe main (feed pump to filter)-01no.,fuel pipe( filter to FIP pump) -01no., fuel pipe return (FIP to fuel tank)-01no.,pipe oil pressure-01no.,oil pressure gauge -01no., water temp. gauge-1 no., fan belt-1 no. Complete assembling of the engine with new parts, testing it and mounting on the machine. P/f of engine sump studs-12Nos.The job includes cost of material and labour charges. (M.Oil-18 ltrs to be provided by the department)
2Complete repair/calibration ofF.I.P by way ofremoval of defective F.I.P from engine, cleaning with petrol and removing the damaged partsP/F plunger head-1No., plungers-4Nos., delivery valves, with elements, FIP coupling along with cross with spacer, governor shaft, nozzles, calibration of nozzle injector with pump. P/F of pump cam shaft, adapter fuel injection pump, gear, non-return valve, feed pump set -01no, calibration & tuning ofFIP, Job includes cost of material and labour charges & calibration and tuning of FIP with engine
3Repair to Radiator by removing the radiator from the machine. Removing by way of heating the solders of upper and lower reservoirs. Removing by way of gas cutter 4No. of blocked tube and replacing with new tubes by way of soldering. Plugging the leakage at 4 points on the core of radiator. Cleaning the core by way of using of caustic soda and flushing out with water. Soldering the upper and lower reservoirs and fitting on the machine. P/f of new upper & lower hose pipes with clamps. P/f of radiator foundation bolts and radiator cap complete job.
4Repair to self starter by dismantling it completely, cleaning with petrol, inspection of parts and then replacement of damaged/worn out parts by P/F of set of field coil, carbon brush set-01no., new armature, solenoid switch with bendex drive-01no., p/f of bearing along with long bolts, p/f of carbon bush moving plate assembling and testing. The job includes cost of material, labour charges and taxes.
5Complete overhauling of the gear box and speed shaft. Removing the damaged/ worn out parts. P/f of coupling shaft-1No.along with ball bearing, bearing housing and reverse bevel pinion along with ball bearing. P/f of 2nd speed pinion, speed wheel (slow)-1No. and speed wheel (fast)-1No. P/f of bushes, speed pin, washer, end washer. Providing of bushes 2No.by way of grinding and fitting to size. P/f of gasket set. Complete job including cost of material and labour charges.
6Repair to steering gear assembly by dismantling it completely ,cleaning, inspection of parts and replacement of damaged /worn out parts by p/f of shaft fork -01no.,bracket for quadrant -01no., bearing -01no.,key -02nos.,worm wheel -01no.,bevel wheel -01no., bevel pinion -01no.,bush -01no., bush-01no.,bush -01no.,stud -6nos.,thrust bearing -1no.,grease tube -03nos bolt -12nos., nuts -12nos.,gasket set-01no., universal ball jointand testing .The job includes cost of material &labour charges and taxes.
7Repair to the differential shaft of the machine by way of dismantling from the machine cleaning with diesel and then p/f of damaged parts like bushes -4Nos. by way of turning and fitting, bevel wheel-1No., bevel wheel with holes-1 No., Shaft-1No., bearing housing-1No., Bolt-12nos., castle Nut-8nos., union-2Nos., assembling and testing. The job includes cost of material and labour charges.
8Repair to clutch (forward and reverse) of the machine by dismantling the system and removing the damaged/worn out parts. P/f of clutch plate driven (in 3 segments) 1No. each(forward and reverse). P/f of plate hub & back assy. 01no., cotter pin, link lever-10Nos., P/f of pin for lever adjusting-2Nos.The job includes cost of material ,labour charges and taxes
9Repair to front rolls and axle by dismantling from the machinecompletely ,checking of parts removing of damaged /worn out parts and then P/F of front axle along with bushes-04nos., mud ring -01no.,cover plate-2Nos., grease nipple-2Nos., P/f of bolts 12 Nos. complete job. The job includes cost of material and ,labour charges
10Repair to rear rolls by dismantling from the machine completely checking of parts ,removing of damaged /worn out parts then P/F of bush inner -02 nos., bush outer -02nos.,peg -01no.,dust cover -02nos.,gear driven 1no., thrust washer -02nos.,pin dowel -04nos.,lock plate -02nos., MC bolt-10nos.,nut -10nos., cover -02 nos . ,gasket -02nos.,grease nipple -02 nos., pacer washer -12nos. in place of damaged/worn out parts after re-metaling of the axle and turning it to the required size & shape. The job includes cost of material ,labour charges and taxes
11Repair to electric system of the machine, removing the damaged wiring and replacement with new. P/f of battery leads-2Nos., along with thimbles, P/f of wiring extending to self starter and dynamo, P/F of ampere meter, oil pressure meter. The job includes cost of material and labour charges.
12Painting of roller by way of removing of perished paint, removing the old paints by scratching and making the surface even by applying putty and spacer, providing of primer paintof red oxide , applying two coats of paint to machine with Dept. Colour and letter writing. Complete servicing of road roller and greasing, Job includes cost of material and labour charges.
13Repair operator seat by way removing the damaged parts with gas cutting and perished material, strengthening of seat by welding of angle iron, P/F of nuts & bolts , raxine cushion, and seat cover, Job includes cost of material and labour charges. complete job including allied works,
14Repair to chasis by way of welding and strengthening the cracked portion, removing the dents from bonnet and doors. P/F of new door hinges-04 nos and bonnet clips. Strengthening the foot rest by welding. Complete job.
15Gear oil
16HSD for testing machine after repair
17Grease
18Rebate on account of old parts (absolute)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail