}

Improvement Of Power Factor Standard Make Apfc Panel At D 10 Sec 07 Rohini H18 Sec 07 Rohini Bpsc 08 Sec 08 Rohini Bps In Ac 13, Delhi-Delhi

Delhi Jal Board-DJB has published Improvement Of Power Factor Standard Make Apfc Panel At D 10 Sec 07 Rohini H18 Sec 07 Rohini Bpsc 08 Sec 08 Rohini Bps In Ac 13. Submission Date for this Tender is 18-02-2023. Power Factor Panel Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

36180414
Improvement Of Power Factor Standard Make Apfc Panel At D 10 Sec 07 Rohini H18 Sec 07 Rohini Bpsc 08 Sec 08 Rohini Bps In Ac 13
Open Tender
Indian
Delhi
Delhi
18-02-2023

Tender Details

Improvement Of Power Factor Standard Make Apfc Panel At D 10 Sec 07 Rohini H18 Sec 07 Rohini Bpsc 08 Sec 08 Rohini Bps In Ac 13

Key Value

Document Fees
INR 500 /-
EMD
INR 12100.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Improvement of power factor "Standard make" APFC panel at D-10 Sec-07 Rohini , H-18 Sec-07 Rohini BPS, C-08 Sec-08 Rohini BPS in AC-13
Sl. No. Item Description
1D-10 Sec-07 Rohini , H-18 Sec-07 Rohini BPS & C-08 Sec-08 Rohini BPS in AC-13 Supply of 25 kVAr, 440V, 3 ph., 50 Hz, APFC panel suitable for power factor improvement of inductive load make standard
2Transportation of the panel at site and installation of the same on the ground with necessary hardware and civil worketc as required at site
3Supply of 50 mm sq. 1.1 kV grade, 3.5 core aluminum armored cable make Paragon, Havells, KEI or any other ISI marked
4Laying of 50 mm sq. cable on the ground using necessary hardware clamps etc. as required at site
5Termination of 50 mm sq. aluminum armored cable using brass compression glands, lugs , tapes etc. as required at site
6Supply and installation of 200/5 A Control CT after dismantling of main bus bars, fixing of CT in the bus bar with necessary hardware and re-fixing of bus bars as required at site- make AE/Kappa/Eqv.
7Supply, laying and termination of 2 core, 2.5 mm sq. copper control cable from Control CT to capacitor panel on ground/wall etc. as required at site
8Supply, laying and fixing of double run 25x3 mm GI strip for earthing of panel from main earthing to capacitor panel using necessary hardware etc. as required at site
9Testing &Commissioning of APFC panel including: 1. Megger testing of complete equipment from phase to phase, phase to neutral and phase to earth. 2. Programming of APFC relay for target power factor. 3. Checking tightness of all nuts and bolts. 4. monitoring of power factor during guarantee period.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail