Educational and Research Institute Government Departments Closing in 0 days TDR #36179194

Tender For Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasaheb Ambedkar Marathwada University Aurangabad.

Issued by Government Departments · aurangabad, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
09 Mar 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
aurangabad → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasaheb Ambedkar Marathwada University Aurangabad. Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasaheb Ambedkar Marathwada University Aurangabad. , Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasahebambedkar Marathwada University Aurangabad. , Wall Panel & Partition Panel 50 Mm Thick Pufinsulated Thick Panel With 0.45Mm Ppgi Sheet Both Sides In 40±2 Kg Density. Puf Panel Shall Bemanufactured By Using High Quality Huntsmans Chemicals & N Pantane As A Blowing Agent. Thepu Panel Shall Be Cfc Free And Zero Ozonedepleting Panel Made Out Of Continuous Line Running On Uninterrupted Power Supply. Panel Shall Have Pre Coated Gisheet On Both Side Of Polyurethane Foam Confirming To Is 12436:1988. The Pre Coated Sheet Shall Be Ofminimum 240 Mpa Steel Grade Confirming To Is 14246:1995 And Shall Have Zinc Coating Of Minimum 120Gsm As Per Is : 277 : 1992, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 15-18 Micron. The Ppgi Sheet Shall Have Plastic Protective Guard Film Of Minimum 25 Microns To Avoid Scratches During Transportation. The Panels Shall Be Vertically Joined Together By Tongue And Groove Joints. The Pu Foam Shall Be Self-Extinguishing, Fire Retardant Type Having Minimum Density Of 40 Kg/Cu.Mt (+, -2 Kgs). Partition Windows Should Be Provided As Per Requirement. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 1.7 M (W) X 2.1M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 1.2 M (W) X 2.1M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 0.900 M (W) X 2.1336 M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door Forlabortory Puf Insulated Room Complete Air Tight Of Size 0.762 M (W) X 2.1336 M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 13-Feb-2023 Corrigendum Other 01-Mar-2023
2 02-Mar-2023 DATE EXTESTION Date 09-Mar-2023

BOQ

Name of Work : Supply, erection of Pre-fab insulated Partition for DNA Barcoding building at Dr.BabasahebAmbedkar Marathwada University Aurangabad.
Sl. No. Item Description
1Supply, erection of Pre-fab insulated Partition for DNA Barcoding building at Dr.BabasahebAmbedkar Marathwada University Aurangabad.
2Wall Panel & Partition Panel 50 mm Thick PUFinsulated thick Panel with 0.45mm PPGI sheet both sides in 40±2 Kg Density. PUF panel shall bemanufactured by using high quality Huntsman\"s chemicals & N pantane as a blowing agent. ThePU panel shall be CFC free and Zero Ozonedepleting panel made out of continuous line running on uninterrupted power supply. Panel shall have pre coated GIsheet on both side of Polyurethane Foam confirming to IS 12436:1988. The pre coated sheet shall be ofminimum 240 mpa steel grade confirming to IS 14246:1995 and shall have zinc coating of minimum 120gsm as per IS : 277 : 1992, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 micron. The PPGI sheet shall have plastic protective guard film of minimum 25 microns to avoid scratches during transportation. The panels shall be vertically joined together by tongue and groove joints. The PU Foam shall be self-extinguishing, fire retardant type having minimum density of 40 Kg/Cu.mt (+, -2 Kgs). Partition windows should be provided as per requirement.
3Supplying and erecting prefabricated door for Labortory Puf insulated room complete air tight of size 1.7 m (w) x 2.1m (H) made from 0.5 mm thick P.P. Sheet on both sides having sandwiched PUF insulation of 40 kg/mtr cube density, thermal conductivity less than 0.02 Wb/mtr cube and 50 mm thickness complete installing alongwith the door frame firmly to the cold room panels having non corrosive handles, locks, hinges, heaters in door leaf and frame, audio alarm for door open condition, auto lock and release mechanism in an approve manner.
4Supplying and erecting prefabricated door for Labortory Puf insulated room complete air tight of size 1.2 m (w) x 2.1m (H) made from 0.5 mm thick P.P. Sheet on both sides having sandwiched PUF insulation of 40 kg/mtr cube density, thermal conductivity less than 0.02 Wb/mtr cube and 50 mm thickness complete installing alongwith the door frame firmly to the cold room panels having non corrosive handles, locks, hinges, heaters in door leaf and frame, audio alarm for door open condition, auto lock and release mechanism in an approve manner.
5Supplying and erecting prefabricated door for Labortory Puf insulated room complete air tight of size 0.900 m (w) x 2.1336 m (H) made from 0.5 mm thick P.P. Sheet on both sides having sandwiched PUF insulation of 40 kg/mtr cube density, thermal conductivity less than 0.02 Wb/mtr cube and 50 mm thickness complete installing alongwith the door frame firmly to the cold room panels having non corrosive handles, locks, hinges, heaters in door leaf and frame, audio alarm for door open condition, auto lock and release mechanism in an approve manner.
6Supplying and erecting prefabricated door forLabortory Puf insulated room complete air tight of size 0.762 m (w) x 2.1336 m (H) made from 0.5 mm thick P.P. Sheet on both sides having sandwiched PUF insulation of 40 kg/mtr cube density, thermal conductivity less than 0.02 Wb/mtr cube and 50 mm thickness complete installing alongwith the door frame firmly to the cold room panels having non corrosive handles, locks, hinges, heaters in door leaf and frame, audio alarm for door open condition, auto lock and release mechanism in an approve manner.

AI Tender Summary

OUR REF NO 36179194
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 09-03-2023
Authority
Authority Name Dr. Babasaheb Ambedkar Marathwada University
Work Description Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasaheb Ambedkar Marathwada University Aurangabad. Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasaheb Ambedkar Marathwada University Aurangabad. , Supply, Erection Of Pre-Fab Insulated Partition For Dna Barcoding Building At Dr.Babasahebambedkar Marathwada University Aurangabad. , Wall Panel & Partition Panel 50 Mm Thick Pufinsulated Thick Panel With 0.45Mm Ppgi Sheet Both Sides In 40±2 Kg Density. Puf Panel Shall Bemanufactured By Using High Quality Huntsmans Chemicals & N Pantane As A Blowing Agent. Thepu Panel Shall Be Cfc Free And Zero Ozonedepleting Panel Made Out Of Continuous Line Running On Uninterrupted Power Supply. Panel Shall Have Pre Coated Gisheet On Both Side Of Polyurethane Foam Confirming To Is 12436:1988. The Pre Coated Sheet Shall Be Ofminimum 240 Mpa Steel Grade Confirming To Is 14246:1995 And Shall Have Zinc Coating Of Minimum 120Gsm As Per Is : 277 : 1992, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 15-18 Micron. The Ppgi Sheet Shall Have Plastic Protective Guard Film Of Minimum 25 Microns To Avoid Scratches During Transportation. The Panels Shall Be Vertically Joined Together By Tongue And Groove Joints. The Pu Foam Shall Be Self-Extinguishing, Fire Retardant Type Having Minimum Density Of 40 Kg/Cu.Mt (+, -2 Kgs). Partition Windows Should Be Provided As Per Requirement. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 1.7 M (W) X 2.1M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 1.2 M (W) X 2.1M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door For Labortory Puf Insulated Room Complete Air Tight Of Size 0.900 M (W) X 2.1336 M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner. , Supplying And Erecting Prefabricated Door Forlabortory Puf Insulated Room Complete Air Tight Of Size 0.762 M (W) X 2.1336 M (H) Made From 0.5 Mm Thick P.P. Sheet On Both Sides Having Sandwiched Puf Insulation Of 40 Kg/Mtr Cube Density, Thermal Conductivity Less Than 0.02 Wb/Mtr Cube And 50 Mm Thickness Complete Installing Alongwith The Door Frame Firmly To The Cold Room Panels Having Non Corrosive Handles, Locks, Hinges, Heaters In Door Leaf And Frame, Audio Alarm For Door Open Condition, Auto Lock And Release Mechanism In An Approve Manner.
Basic Detail
Tender No E Tender / Bamu / 2022-23
Bidding Type Tender
Location
City aurangabad
State Maharashtra
Key Dates
Publish Date 02 Mar 2023
Submission Date 09 Mar 2023
Open Date 10 Mar 2023
Finance
Tender Value Ref. Documents
Tender Fee 3000
EMD 50000
Exemption Not Available
Document List
3f997ae8-9773-4633-9ada-ea15dadd6e02.html
BOQ_1517542.xls
partition.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 02, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 01, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 09, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 09, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 10, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

3f997ae8-9773-4633-9ada-ea15dadd6e02.html

xls

BOQ_1517542.xls

pdf

partition.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders