Tender For New Piped Water Supply Scheme 06 Nos Village Under Jal Jeevan Mission At Village Dewarbeli Harradehi Nallejhari Lodama Bijagarh And Dewalgaon Block Lanji, District Balaghat
Tender Overview
Project Description
New Piped Water Supply Scheme 06 Nos Village Under Jal Jeevan Missionat Village - Dewarbeli, Harradehi, Nallejhari, Lodama, Bijagarh And Dewalgaon ( 06 Nos Villeges ) Block Lanji, District Balaghat Based On Tube Well Including Installation Of Electric Submersible / Centrifugal Water Motor Pump, Construction Of 20 Kl R.C.C. Sump Well At -Dewarbeli, Lodama And Dewalgaon ( 03 Nos Villages ) Andat Village - Dewarbeliconstruction Of 75 Kl R.C.C.O.H.T. Staging 12M.At Village - Lodama Construction Of 50 Kl R.C.C.O.H.T. Staging 12M. At Village -Dewalgaon Construction Of 100 Kl R.C.C.O.H.T. Staging 12M.Laying And Jointing Of Rising Main And Distribution Pipe Line System, 100% Household Tap Connections, Construction Of Pump House And Electric Power Connection At Tube Wellsand Sump Wel Including Cost Of All Materiall And Labour With 90 Days Trial Run / Commissioning Period Of Entire Scheme In All Above Villages Construction Of O.H.T. & Sumpwell According To Requirements & Design.
BOQ
| Sl. No. | Item Description |
| 1 | Item Description |
| 2 | New Piped Water Supply Scheme 06 Nos Village Under Jal Jeevan Missionat Village - DEWARBELI, HARRADEHI, NALLEJHARI, LODAMA, BIJAGARH AND DEWALGAON (06 Nos Villeges)BLOCK LANJI, District Balaghat based on Tube well including installation of electric submersible/centrifugal water motor pump, Construction of 20 KL R.C.C. Sump well At -DEWARBELI, LODAMA and DEWALGAON (03 Nos Villages)andAt Village - DewarbeliConstruction of 75 KL R.C.C.O.H.T. Staging 12M.At Village - Lodama Construction of 50 KL R.C.C.O.H.T. Staging 12M. At Village -Dewalgaon Construction of 100 KL R.C.C.O.H.T. Staging 12M.Laying and jointing of rising main and distribution pipe line system, 100% household tap connections, construction of pump house and electric power connection at Tube wellsand sump wel including cost of all materiall and labour with 90 Days Trial Run/Commissioning period of entire scheme in all above villages construction of O.H.T. & sumpwell according to requirements & design. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender