Tender For New Construction Of Day Care Sub Centre Cum Health Wellness Centre At Malisahi Under Nuagaon Block For The Year 2022-23.
Tender Value
38.65 Lakhs
Estimated cost
Bid Submission
17 Feb 2023
0 days left
EMD
38660
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nuagaon → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
New Construction Of Day Care Sub Centre Cum Health Wellness Centre At Malisahi Under Nuagaon Block For The Year 2022-23.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Feb-2023 | 1st Corrigendum | Technical Bid | 17-Feb-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | (A) CIVIL |
| 2 | Earthwork in excavation of foundation in all kinds of soil includingdressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost of labour including cess andT&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.(Ground Floor) |
| 3 | Filling Foundation & Plinth manually with excavated earth including all labours, watering etc., required for the work including cost, conveyance, royalty and taxes for finished item of works including cess andand direction of the Engineer-in-charges.(Ground Floor) |
| 4 | Cement Concrete (1:3:6) using 40mmsize hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. |
| 5 | CC work M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 20 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper |
| 6 | Ground Floor |
| 7 | A)COLUMN BASE FOOTING |
| 8 | B)COLUMN SUPER STRUCTURE |
| 9 | C) PLINTH BAND |
| 10 | D) LINTEL BAND |
| 11 | E)FLOOR BEAM |
| 12 | F) CHAJJA |
| 13 | G) STAIRCASE 2 |
| 14 | H) ROOF SLAB |
| 15 | First Floor |
| 16 | B)COLUMN SUPER STRUCTURE |
| 17 | D) LINTEL BAND |
| 18 | E)FLOOR BEAM |
| 19 | F) CHAJJA |
| 20 | G) STAIRCASE 2 |
| 21 | H) ROOF SLAB |
| 22 | 2nd Floor |
| 23 | B)COLUMN SUPER STRUCTURE |
| 24 | E)Roof BEAM |
| 25 | F) CHAJJA |
| 26 | H) ROOF SLAB |
| 27 | Cutting, straightening coiled or bent up M.S. rods, HYSD steel or Tor Steel ofgrade Fe-415 confirming to I.S.-1786 - 1985welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods, HYSD steel or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod, HYSD steel or Tor steel consumed in the work and no separate payment will be made towards weight of binding wires ,lapping and wastage of HYSD Steel or Tor Steel ,which is to be borne by the contractor at his own cost). |
| 28 | Ground Floor |
| 29 | First Floor |
| 30 | Second Floor |
| 31 | Laterite stone masonary in cement mortor (1:6) with approved grade cement and screened & washed sand for mortar after immersing the stone for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, Laterite stone masonry in cement mortar (1:6)in foundation and plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc |
| 32 | A) Foundation |
| 33 | Brick work with Flyash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C.(Ground Floor) |
| 34 | Ground Floor |
| 35 | 1st Floor |
| 36 | 2nd Floor |
| 37 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with approved grade cement and with screened and washed sharp sand for mortar and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge. |
| 38 | Ground Floor |
| 39 | 1st Floor |
| 40 | 2nd Floor |
| 41 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with approved grade cement and with screened and washed sharp sand for mortar and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge. |
| 42 | Ground Floor |
| 43 | 1st Floor |
| 44 | 2nd Floor |
| 45 | 6 mm thick C.P. (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment , watering, curing cost, carriage & royaltyof all materials, cost of all labour,etc complete as per the direction ofE.I.C.Ref(A/R-2006,P-103,Item no-27 |
| 46 | Ground Floor |
| 47 | 1st Floor |
| 48 | 2nd Floor |
| 49 | Supplying, fitting and fixing Anti skid Vitrified tile in floors of approved make conformaing to IS:13755 laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, etc. required for the work all complete as per direction ofE.I.C. |
| 50 | Ground Floor |
| 51 | 1st Floor |
| 52 | Fixing tiles in dados skirting and risers of steps on 12mm thick CP (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete. |
| 53 | Ground Floor |
| 54 | 1st Floor |
| 55 | Priming 1 coat with wallprimer water bond cement primer including all labour, materials etc. complete. |
| 56 | Ground Floor |
| 57 | 1st Floor |
| 58 | 2ndFloor |
| 59 | Ground Floor 16 mm |
| 60 | Finishing wall surface with Cement based wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour etc. complete. |
| 61 | Ground Floor |
| 62 | 1st Floor |
| 63 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete. |
| 64 | Ground Floor |
| 65 | 1st Floor |
| 66 | 2ndFloor |
| 67 | Wall painting two coat with any approved weather coat paintincluding cost of all materials, labour and T&P require for the work etc. complete as directed by the E.I.C. |
| 68 | Ground Floor |
| 69 | 1st Floor |
| 70 | 2ndFloor |
| 71 | Supplying of M.S. Door, Window with grills, Grills made out of M.S. Angle frame, M.S. Flat, Sheetetc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour charges, carriage of materials to site etc. complete. |
| 72 | Ground Floor D |
| 73 | Ground Floor W |
| 74 | 1st Floor D |
| 75 | 1st Floor W |
| 76 | 2ndFloor |
| 77 | Supplying, fitting, fixing up window (sliding type) made up aluminum Section 151-154, 151-155, as windows frame section No. 151- 155, 151-153 and 151-167 as shutter framewith 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting includingcost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. |
| 78 | Ground Floor |
| 79 | 1st Floor |
| 80 | Factory made single leaf rigid FRP (alternately called GRP) sandwich composite door shutter of 32mm thick laminated with two GRP skins with wood grain finish fabricated using UV-stabilised Isopthalic Gelcoat and one layer of 450 gsm E-glass Chopped Strand Mat (CSM) mpregnatedwith orthopthalicpolyester resin. The thickness of the skins shall not be less than 1.50mm Expanded Polystyrone (EPS) structural foam panel of 29mm thickness and a density of 20kg/cu.mtr shall be used as core material. Wooden reinforcements made of seasoned sal wood block of cross section not less than 28mm x 32mm and also necessary sal wood reinforcements for fitting the metal fittings such as tower bolts, aldrops, handles etc shall be provided. A structural adhesive compatible with (EPS) foam shall be used for bending the core material, the sal wood reinforcements and the skins. The material and process for manufacturing the door shutters shall conform to RV-TIFAC composites Design Centre\"s standards and specifications and the door shutters tested in conformation to IS: 4020-1998. The finish of door shutter will be plain colour as per specification and direction of the Engineer in charge. |
| 81 | Ground Floor |
| 82 | 1st Floor |
| 83 | Factory made FRP (alternately called GRP) door frame of size 75mmx100mm fabricated using E-glass Chopped Strand Mat (CSM) U.V stabilised Inopthalic Gel coat and impregnated with Inopthalic resin. The thickness of the GRP skins shall not be less than 2.00mm. The doorframe consists of four segments, which are provided with plug-in-socket arrangement in-situ in the mould. The segments are plugged in and are joined together by means of screw. The GRP frame shall be provided with wooden reinforcement on six locations for high screw holding capacity for for fixing metallic hold fast and shall be consolidated by filling with medium density foam/plaster of paris with fibre reinforcement, Six numbers of 260mm x 25mm x 5mm size \"S\" shaped M.S flat hold fast shall be provided with the frame. The material and process for |
| 84 | Ground Floor |
| 85 | 1st Floor |
| 86 | Supplying, fitting & fixing of Stainless steel of 304 grade in hand railing using 75mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr. C/c and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification,buffing,polishingetc including all cost,conveyance, taxes of labour & cess,T&P etc.complete as directed by the Engineer-incharge. |
| 87 | Ground Floor |
| 88 | 1st Floor |
| 89 | Providing and painting two coats over wood/steel surface with approved shade and quality of enamel paint of approved quality in all floors and all heights including preparing the surface,with cost, conveyance, royalties and taxes of all materials and cost of all labour, scaffolding,cess, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge. |
| 90 | Ground Floor |
| 91 | 1st Floor |
| 92 | 2nd Floor |
| 93 | 25mm thick CC 1:2:2 with 6mm size CB chips for grading concret over roof slab etc. complete. |
| 94 | Ground Floor |
| 95 | 1st Floor |
| 96 | 2nd Floor |
| 97 | (A) ELECTRICAL |
| 98 | Recessed wiring to Light point/Exhaust Fan Point with 1.5 sqmm, FR PVC Insulated single core multistrand copper conductor of ISI marked with 20 mm dia non- metallic PVC flexible conduct with 5 Amp, 250 V piano type switch ISI marked and ceiling rose ISI marked mounted on MS box having front bakelite cover of suitable size,MS box with 1.0 sqmm FR PVC insulated single core multistrand copper conductor and earth wire incouding all accessories and connection as per direction of engineer in charge (Make of wire = Finolex/L&T/ Anchor/ V-Guard) deducting the cost of S/F 100 mm x 100 mm x 60 mm M.S. Box with backlite cover-1 No.)Group A 1.2.1-1.24.2 |
| 99 | -do-………Group B 1.2.2 - 1.24.2 |
| 100 | -do-………. Group C 1.2.3 - 1.24.2 |
| 101 | Recessed wiring toFan point in Group B 1.2.2 - 1.24.2 |
| 102 | Recessed wiring to Callbell point in Group C 1.2.3 - 1.24.2 |
| 103 | S/F to 16/18 SWG metal box of following sizes (normal sixe) in recess with suitable size of phenolic laminated sheet cover in front including cutting the wall and making good the same in case of recessed conduit as required.100 mm x 100 mm x 60mm deep (1.24.2) |
| 104 | -do-180mmx100mmx60mm deep(1.24.5) |
| 105 | -do-200mmx150mmx60mm deep(1.24.7) |
| 106 | S/Fof metal box of 150 mm x 75mm x 60mmdeep (Nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 5/6 amp. Socket out let 5/6amp. Piano type switch,connection,painting etc. as required (1.26) |
| 107 | S/Fof 5 amp switch and 5A. Socket outlet of ISI marked on existing board (1.25.1 + 1.25.4) |
| 108 | S/F of metal box of 180mm x 100mmx60mm deep (Nonunal size) in recess with suitable size of Phenolic laminated sheet cover in front including providing and fixing 3 pin 15/16 amp. Socket out let 15/16 amp. Piano type switch,connection, painting etc. as required(1.27) |
| 109 | Wiring for circuit/sub main alongwith earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20 mm dia non metallic heacy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire-Finolex/L&T/Anchor/Havels/V-Guard).2x1.5 sqmm + 1 x 1.0 sqmm( 1 .8.1) |
| 110 | -do- 2 x 2.5 sqmm + 1 x 1.5 sqmm (1.8.2) |
| 111 | -do- 2x4 sqmm + 1 x 1.5 sqmm (1.8.3) |
| 112 | -do- 2x6sqmm +1x2.5sqmm (1.8.4) |
| 113 | Supply, Installation and commissioning of63 Amp. I.C.D.P. Main Switches (Sl.No. 1502) (IS 13940 Part 3/ 1993) on existing surface complete with H.R.C. fuse links, interconnections, earthing etc. as requiredas per direction of Engineer in- charge (Make Siemens/ HPL/Anchjor/L&T/ Havels/ C&S/ R,K,)2.15.A |
| 114 | Supply of250 mm x 300 mm x100 mm deep(1.24.13) for fixing 63 Amp ICDP Main Switch. |
| 115 | S/F of 63A ICTPN Main Switch (2.15.3) |
| 116 | S/F of 5 to 32 Amp rating 240 Volt \"B\" series MCB for lighting and other loads in the existing MCB Distribution Board ISI marked complete with connection, testing and commissioning etc. as required (2.6.1) |
| 117 | S/F of following 8way single pole and neutral sheet steel MCB 250 V on recessed complete with tinned coper bus bar , neutral bar, earth bar,din bar, detachable gland plate, inter connections, phospatized and powder painted including earthing etc. as required(but without MCB)8 way Double door(2.3.6) |
| 118 | S/F of following 12way single pole and neutral sheet steel MCB 250 V on recessed complete with tinned coper bus bar , neutral bar, earth bar,din bar, detachable gland plate, inter connections, phospatized and powder painted including earthing etc. as required(but without MCB)12 way Double door(2.3.7) |
| 119 | S/F of batten holder BK angle holder ISI marked including connection etc. instead of ceiling rose(1.29- 1.28) |
| 120 | S/F of 15W LED Bulb |
| 121 | Earthing with copper earth plate 600 mm x 600mm x 3.15 mm thick including accessories and providing masonary with cover plate having locking arrangement and watering pipe etc. with charcoal and salt as required.(3.5+3.6) |
| 122 | Supply andlaying 8 SWG copper wire in recess for loop earthing as required (3.18) |
| 123 | S/F fo 48\" A.C.Cilling fan without regulatorincluding all conections Model:Crompton (jura)/ Usha-(Striker Millenium) /Havells (Velocity/Spark) / Anchor - (XL)/ Orient-(Summer Pride) |
| 124 | S/F of 18-25 watt LED Tube light fitting including necessary connection, Make-( Crompton/HPL/Polycab/Havells/PAC) |
| 125 | S/F of Fan hook S, Type on ceiling. |
| 126 | Supply, Installation, Testingand commissionioning of 225mm sweep exhaust fan in the existing opening, including making the hole to suit the size of the above fan making good the damaged comlete, connection,etc. as required.(1.43)(Make: Bajaj/Almonard) |
| 127 | S/F of computer board consisting of 3 nos. of 5 amp plug and switch + Indicator complete with wiring on (200mmx150x75mm)deep M.S.box with B.k.cover(1.24.9 +1.25.4 + 2.5.1) |
| 128 | S/F of electronic step type ceiling fan regulator in existing switch board including connection with1.5sqmm FR PVC(1.38) |
| 129 | S/F Call bell/Buzzer ISI marked suitable for DC/AC single Phase 230 volts complete as required.(1.30) |
| 130 | S/F of 60 watt. LED street light fitting including necessary connection. (Make- crompton/poly cab/Havells/ HPL/Philips) |
| 131 | S/F of 1.5sqmm mult-strand copper wire for invertor wiring |
| 132 | S/F of 100 Amp. T.P.N. Cupper Bus Bar with all connections (Make:MICO) |
| 133 | S/F of 32A flush type DP switch on 7\"x4\" board |
| 134 | S/F of 15A Socket on 4\"x4\" board(1.25.5+1.24.2) |
| 135 | S/F of 32A DP MCB for AC |
| 136 | S/f of 3 Pin 15A Plug (Top), make-Havells |
| 137 | Supply and Fixing of 21 watt ceilling LED circular light fitting. (Make - Havells/Phillips/Bajaj/Crompton) |
| 138 | (A) P.H |
| 139 | Earthwork in all kinds of soil in excavation of foundation trencheswithin 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc all complete as per direction of the E.I.C.(Spetic Tank 10 |
| 140 | Initial lift upto 1.5 mtr |
| 141 | From 1.5 mtr to 3.0 mtr depth |
| 142 | Supplying all materials, labour, T&P and filling in foundation and plinth with river sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per the direction of the E.I.C. |
| 143 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 40mm H.G metal including watering, curing and conveyance of all materials to site payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 144 | Supplying all materials, labour, T&P and providing plain cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 145 | Supplying all materials,labour, T&P and providing Brick work with K.B.Brick having crushing strength not less than 75 Kg/CM2with dimensional tolerence of +/- 8% in C.Mincluding watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 146 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 147 | Supplying all materials, labour, T&P and providing cement punning on plastered surface including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 148 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 149 | Supplying all materials, labour, T&P and providing M.S.reinforcements for RCC work including cutting, bending, binding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 150 | Supplying all materials, labour, T&P and providing Reinforced cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 151 | Supplying all materials, labour, T&P and making M.S. Step Iron in 20mm Dia M.S Steel bars and fixing into walls of Manhole/ Septic Tanks duly embeded inC.C(1:2:4) etc all complete as per P.H specification and direction of the E.I.C. |
| 152 | Supplying all materials, labour, T&P and providing 50mm thick pre-cast R.C.C.bafflewall in R.C.C(1:1.5:3) including reinforcement cage using 12mm size HG chips fitted and fixed in position, finished smooth etc. complete including cutting grooves and mending good the damages etc all complete as per P.H specification and direction of the E.I.C. |
| 153 | Supplying all materials, labour, T&P and providing 160mm dia P.V.C Tee inside the septic tank including cutting holes and duly embeded inP.C.C(1:1.5:3)using 12mm size HG chips fitted and fixed in position and mending good the damages etc all complete as per P.H specification and direction of the E.I.C. |
| 154 | Supplying all materials, labour,T&P and providing 12mm thick cement flush pointing in C:M (1:3) to Brick Masonry works includingwatering curring and conveyance of all materialsto work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 155 | Supplying all materials, labour,T&P and filling Foundation and Plinth with excavated earth includingwatering, ramming etc all complete as per direction of the E.I.C. |
| 156 | Supplying all materials, labour, T&P and fixing the PVC door frames to be made up of PVC profiles of size 40x48mm, the vertical profiles to be joined with the horizontal ones, after inserting M.S/Fibre \"L\" Angles of size 200x100 mm and self tapping screws, One meter long reinforcement to be provided along the side of the frame where the door is to be hung, to be fixed to the wall with steel screws and PVC royal plugs etc. all complete as per specification and direction of the E.I.C |
| 157 | Supplying all materials, labour, T&P and fixing of plastic door shutter to be made up selective PVC profiles. The styles and rails areto be made up of selected PVC profiles,the stiles and the rails to be made up of sections measuring 24x59 mm, the pannels to be provided of size 200x20mm, lock rail to be provided horizontally at the required place for strength and firmness, measuring approximately 24x100mm, all four corners to be provided with M.S/Fibre \"L\" Angles of the size 200x100mm fitted with steel screws, the door to be hung to the frames with the help of 100mm S.S. hinges and self tapping screws, etc. all complete as per specification and direction of the E.I.C |
| 158 | Supplying all materials, labour T&P and fitting and fixing 10 Ltrs capacity PVC low level flushing cistern with a pair of C.I. or M.S.brackets complete with fittings such as syphonic arrangement, 15mm nominal size Brass/PVC ball valve with polythene float, CP/Brass handle, unions and couplings for connection with inlet, outlet, overflow pipes, 32mm dia PVC flush bend, 15mm dia PVC connection pipes including cutting holes and making good the same and connecting the flush bend with cistern and closet and connecting inlet pipe with supply main with etc all complete as per specification and direction of the E.I.C (PARRYWARE, CERA, HINDWARE) |
| 159 | Supplying all materials, labour, T&P and fixing water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x30mm footrestetc all complete as per specification and direction of the E.I.C. a) 580mmx440mm size White Orissa pan(PARRYWARE, CERA, HINDWARE) |
| 160 | European water closet with ‘P’&‘S’ trap plain (PARRYWARE, CERA, HINDWARE) |
| 161 | Supplying all materials, labour, T&P and fixing wash kitchen sink/laboratory sink with C.I/M.S brackets paintedwhite including holes in walls and making good the damagesetc all complete as per specification and direction of the E.I.C. 610x510x200 mm stainless steel kitchen sink (PARRYWARE, CERA, HINDWARE) |
| 162 | Supplying all materials, labour T&P and fixing wash basins with C.I. or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing 32mm dia CP brass waste, etc all complete as per specification and direction of the E.I.C. a).550mmx400mmW.H.basin (PARRYWARE, CERA, HINDWARE) |
| 163 | Supplying all materials, labour, T&P and constructing Gully Trap chamber of the following inside size with 8 cm thick precast cover slab in CC (1:1.5:3) mix using 12 mm size H.G chips, foundation concrete (1:3:6) using 40 mm size HG metal on bed and around trap , !st class KB Brick work in CM (1:6) in F & P and inside 12 mm thick cement plaster (1:3) finished with a floating coat of neat cement including fixing 100mmx100mm size HCI gully trap 150mmx150mm size C.I grating etc. all completed as per approved drawing, specification and direction of E.I.C. (a).Inside size 250mmx250mm |
| 164 | Supplying all materials, labour, T&P and constructing Inspection Chamber of the following sizes withcement concrete (1:3:6) using 40 mm size HG metal on bed, 1st class KB Brick work in CM (1:6) moulding and shaping the channel inside and benching with C:C (1:1.5:3) using 12 mm size H.G chips,12 mm thick cement plaster (1:3) with punning to inside, cement flush pointing (1:3) to outside, RCC cover slab in C.C(1:1.5:3) using 12 mm size H.G chips with RCC man hole cover, earth work excavation in all kinds of soil and refilling the cavity around the chamber including watering, curing, conveyance of all materials to worksite, paymentof royalty, taxes etc. all complete as per approved specification and direction of E.I.C Inside size 760mm x 760mm x 460mm |
| 165 | Supplying all materials, labour, T&P and constructing soakway pit of the following size with dry brickwalling from bottom upto invert of inlet pipe and 1st class KB brick work in CM (1:6) for the remaining height at top, 12mm thick Cement Plaster (1:4) inside and outside over masonry brick work, gravel packing in the rear of well steining, RCC cover slab in CC (1:1.5:3) using 12mm HG chips, fitted with iron lifting handles including earthwork in open well excavation in all kinds of soil and refilling of cavity around the pit & painting the iron works, watering, curing, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per approved specification and direction of the E.I.C. Construction of Soak way Pit (1.20 m dia x 2.00m Deep) |
| 166 | Construction of RCC Ring Soak way Pit (1.22 m dia x 2.00m Deep) |
| 167 | Supplying all materials, labour, T&P and laying in trenches 4kg/cm2 U-PVC SWR soil waste ventilating pipes for sewer line of following dia in trenches (to slope or level)and jointing with supply of approvedsolvent cement by non-heat application method C.C (1:3:6) using 40mm size hard granite metal on bed of the trenches andall round concrete encashing with C:C (1:4:8) using 40 mm size H.G. metal, earthwork in excavation in trenches in all kinds of soil, refilling the same in a layer of 0.30mtr with watering, ramming and removing of surplus earth, testing the S.W. pipeline etc. all complete as per approved drawing, specification and direction of the E.I.C. Laying of 100 mm dia S.W Pipe line Haunch top |
| 168 | Supplying all materials, labour, T&P and fitting and fixing Brass/CP fittings of the following nominal bore with supply of all jointing materials etc. all complete as per specification and the direction of the E.I.C. (PLAZZA / PARRYWARE )A) 15mm dia CP Bib Cock (long Body) |
| 169 | 15mm dia CP Bib Cock (SortBody) |
| 170 | 15mm dia CP Two way angle/Bib Cock |
| 171 | 15mm dia CP Angle Stop Cock |
| 172 | 15mm dia CP flange |
| 173 | 15 mm dia CP Pillar Cock long neck |
| 174 | 25mm dia brass or gun metal fullway valve |
| 175 | 32mm dia brass or gun metal fullway valve |
| 176 | 15 mmC.P Extension piece 50 mm long |
| 177 | 15mm dia CP concealed stop cock |
| 178 | 15mm dia CP Health Fuccet |
| 179 | 15mm x 225mm long size CP shower |
| 180 | a) Fixing of 20mmx450mm long CP towel rail |
| 181 | CP towel ring |
| 182 | Fixing of 600mmx120mm size plate glass shelf with aluminium guard rails |
| 183 | fixing CP soap holder |
| 184 | Fixing of Glass Mirror 600mmx450mm size (fixed type) |
| 185 | Supplying all materials, labour, T&P and fitting and fixing U-PVCsoil waste ventilating pipes of and fittings of the following outside diameter of 4kg/cm2conforming to ISI No 13592/1992 to walls with nails, bobbins and wooden plugs including jointing with supply of approved rubber lubricant by non-heat application method/as per manufacturer\"s specification, testing etc all complete as per P.H specification and direction of the E.I.C.a) 110mm dia PVC SWR pipe / 4 Kg ISI Mark |
| 186 | 110mm dia Plain bend |
| 187 | 110mm U-PVC door bend |
| 188 | 110mm U-PVC door Tee |
| 189 | 110mm dia cowl |
| 190 | 125mm dia CP grating |
| 191 | 110mm dia PVC P trap |
| 192 | 110mm dia U-PVC socket plain |
| 193 | Supplying all materials, labour, T&P and providing and fixing to wall or ceilling and floor PVC pipes conforming to(Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and floor testingetc all complete as per P.H specification and direction of the E.I.C. a) 20mm dia C-PVC pipe (Internal) |
| 194 | 25mm dia C-PVC pipe (external) |
| 195 | 32mm dia C-PVC pipe (external) |
| 196 | Supplying all materials, labour, T&P and Fitting and Fixing of PVCwater storage tankincluding cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jamnuts, including hoisting upto a height of 5 mtr aboveG.Land placing the tank in required position including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. 1000 Ltr capacity Sintex tankon 1st Floor (Sintex make ISI) |
| 197 | Supplying all materials, labour, T&P and construction of masonry staging with providing 1st class K.B. Brick work in C.M.(1:6) of 0.46mtr height in staging, 12 mm cement plaster in C.M (1:6), R.C.C. Beam of 0.25mx0.30mx2.60m & roof slab of 1.40mx1.40m in C.C (1:1.5:3) using 12mm size H.G.Chips including centering, shuttering, bending and binding of rod etc watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. 1000 Ltr capaciton 1st Floor 1st Floor (Sintex make ISI) |
| 198 | SINKING OF TW Labour for drilling a perfectly vertical bore hole at specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination rigs as required to suit the site conditionas per thedirection of the Engineer-in-charge including use of own rigs with its accessories, tools and plants and consumables etc for lowering of 200 mm dia P.V.C/G.I/MS pipes for housing fitted socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/P.V.C/M.S casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell) Drilling of 125mm X 100mmdia bore |
| 199 | Lowering of the following size G.I/P.V.C pipes with or without slotted pipes as per the necessary from ground level upto 30 mtrs depth and fitted and fixed up in perfectly vertical position including cutting and threading pipes and slotted pipe and supplying and fixing all jointing materials, tools and plants complete and keeping the top of the casing pipe threadedincluding plugging tubewell to prevent entry of foreign materials from above.a) Lowering of 125mm dia PVC pipe (Labour) |
| 200 | Cost of 125mm dia PVC pipe (Sch-80-ISI mark) |
| 201 | Cleaning and developing the tube well using their own compressor continuously worked till clean and adequate discharge is obtained from the tubewell including supply and use of all necessary equipments and labour as per the direction of Engineer-in-charge. |
| 202 | Installation of pump setSupply of ISI mark 1.00 HP single phase vertical submersible pump set with discharge of 1800-2200 ltr/hour and a head of 45-60 Mtr of reputed make like KSB/TEXMO and equivlant including all cost conveyance and taxes etc all complete as per the direction of E.I.C. |
| 203 | Supplying all labour, T&P and fitting abnd fixing of 1.00 HP single phasevertical submersible pump set with commissioning and testing etc all complete as per the direction of E.I.C. |
| 204 | Supplying all labour, T&P and fitting abnd fixing of ISI mark DOL starter of reputed make like BCH or equivalent for1.00 HP single phasesubmersible pump including all cost, conveyance of all taxesetc all complete as per the direction of E.I.C. |
| 205 | Supplying all labour, T&P and fitting abnd fixing of three core flat cable (1.5 mm2) of ISI mark of reputed make like BCH/Finolex or equivalent and connecting the pump and starter including all cost, conveyance and taxes etc all complete as peras per the direction of E.I.C. |
| 206 | Supplying all labour, T&P and fitting abnd fixing of plastic rope MS well cover, MS clamp, stainless steel short piece, bend and socket including all cost, taxes etc all complete as peras per the direction of E.I.C. |
| 207 | Supplying all labour, T&P and fitting abnd fixing of HDPE pipe and fitting with making connection to pump set including all cost, taxes etc all complete as peras per the direction of E.I.C. A) 32mm dia HDPE pipe |
| 208 | BORE PROTECTION Supplying all materials, labour, T&P for construction of bore protection wall with providing sand filling, cement concrete (1:4:8) with HG metal & KB brick work in cement mortar (1:6) of 1.15 height, 16mm thick CP over the brick work, RCC slab of size 0.95 x 0.95 x 0.75 mtr avairage length in C 1:1.5:3, centering shutering including watering curing conveyance of all materials to work site with all cost, taxes etc all complete as peras per the direction of E.I.C. |
| 209 | Supplying and fitting & fixing of deep well India Mark-II hand pump with CI cylinder,12mm to 16mm dia connecting rod made with bright bar of 12mm dia mtr and 32mm dia GI.Pipe 3.0m long with required depth with end of socket of approved rate as per the direction of E.I.C. |
AI Tender Summary
Tender Timeline
Feb 08, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 17, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 20, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender