Kolkata Metropolitan Development Authority-KMDA has published Overhauling Of Vertical Turbine Pump No 01 Make Wpil Q 3400 M3 Per Hr H 20M With Supply And Fixing Of Necessary Spares As Required And Replacement Of Surge Protection Capacitor Inside The Ht Panel No 2 Along With Allied Works At Rwps Halisahar. Submission Date for this Tender is 22-02-2023. Turbine Engines Tenders in 24 Paraganas North West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Disconnection & Withdrawal of the 11 KV HT Motor (320 KW , 743 RPM, Make : Helmke)for pump no 1 & 2 as per direction of EIC |
2 | Dismantling of TBH unit part by part and checking properly all the bearing and bushing etc. and reassembling the same as per direction of the EIC |
3 | Withdrawal of the Vertical Turbine Pump No. 1 & 2 ( Dis: 3400 m3/hr., Head: 20 m , Make: WPIL)after dismantling the head shaft, line shafts and pump shaft, bushes and coupling etc. part by part as per direction of EIC. |
4 | To and fro transportation charges of required items from pump house to workshop and return the same from workshop to pump house as per direction of the EIC |
5 | Supply ,delivery, fiiting and fixing of Cutless Rubber Bearing ( OD: 110 mm, L = 180mm) as per sample & direction of EIC |
6 | Supply and delivery of Deep Groove Ball Bearing (Bearing No. 16026) for replacing the existing defective one as per direction of the EIC. Make: SKF |
7 | Supplyand delivery of TBH Bearing Spindle as per existing sample & as per direction of EIC |
8 | Machining the head shaft, line shafts and pump shaft etc. as required as per direction of EIC. |
9 | Supply ,delivery of Gland Packing (12.5 mm)as per sample and direction of the EIC |
10 | Supply, delivery at site of TVS 10.9 Grade HT Bolt ( M20, L = 100 mm), Nut and washer as per sample and direction of EIC |
11 | Supply ,delivery ofRetainer Gasketas per sample and direction of the EIC |
12 | Reinstallation of the Pumpassembly after reassembling theBellmouth, line shaft, sleeve ,coloumn pipe and TBHaccessories etc.allcompleteand making proper alignment of the pumpin presence of the Pump Expert and direction of the EIC |
13 | Reinstallation of the 11 KV HT Motor ( 320 KW, 743 RPM, Make : HELMKE) and reconnection of power supply terminals for Pump No. 1 as per technical specification and direction of the EIC. |
14 | Dismantling & Checking the existing surge protection capacitors inside the HT Panel no 2 & spare feeder as per direction of the EIC |
15 | Reinstallation of the existing surge protection capacitor inside HT Panel No. 2 after getting it dismantled from the spare feeder as per direction of the EIC |
16 | Add G.S.T. @ 18.00 % on Rs. 3,64,731.00i.e Total amount over item no. 1.00 to 15 |
17 | Add Labour Welfare Cess @ 1.00 % on Rs.4,30,382.58 i.e Total amount over item no. 1.00 to 16 |