Tender For Construction For Grey Water Management At Miya Para Out Of 15Th Finance(Tied) And Sbm Fund.
Tender Value
2.74 Lakhs
Estimated cost
Bid Submission
20 Feb 2023
0 days left
EMD
5486
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sitalkuchi → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction For Grey Water Management At Miya Para Out Of 15Th Finance(Tied) And Sbm Fund.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation trenches or drain in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing spreading ro stacking the spoils within a lead of 75 m, as directed including trimming the side of trenches, levelling dressing an raming the bottom, bailing out water etc. as required complete. |
| 2 | Earth Work in filling of foundation trenches of plinth with good earth in layers not exceeding 15cmm including watering ramming etc.layer by layer complete ( payment to be made on the basis of measurement of finished quantity work) (a)With earth obtained from excavation of foundation- (a)With earth obtained from excavation of foundation |
| 3 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed andconsolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand |
| 4 | Single brick flat soling of picked jhama brick including ramming and dressing bed to proper leveling and filling joints with local sand |
| 5 | Cement concrete with 30 mm down graded shigles excluding shuttering. in ground floora) 1:3:6 proportion |
| 6 | Ordinary Cement concrete (M-20) with graded stone chips(20 mm nominal size) excludingshuttering.and reinforcement. In ground floor as per relevant IS codes. |
| 7 | Reinforcement for reinforced concrete work in all sorts of structure including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary) cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16G black annealed wire |
| 8 | Hire and labour charge for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto the roof of ground floor) (a) 25mm to 30 mm thick wooden shuttering as per decision & direction of Eng-in - Charge. G.Floor up to PL |
| 9 | Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all round and cement brick work (1:4) upto 0.90 metre from top with 20mm thick cement plastering (1:4) to inside face upto the depth of cement brick work, 15mm thick cement plaster (1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal (50 mm to 63 mm size) including R.C.C. etc.... |
| 10 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth |
| 11 | Plaster (to wall, floor, ceiling etc) with sand - cement-morter including rounding off and chamfering corners as directed and racking out joints including throating, noising and drip course, scaffolding / staging where necessary( Ground floor) (excluding cost of chipping over concrete surface )-ii) With (1:4) Cement morter c) 10 mm thick plaster |
| 12 | With (1:6) Cement morter c) 15 mm thick plaster |
| 13 | Neat cement plunning about 1.5mm thick in wall dado, window sills, floors, drains etc. using cement @ .152 cu m/100 sq m |
| 14 | Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including cost of jointing materials paints etc. fitting and fixing all necessary 100 mm dia |
| 15 | Supply of stone shingles and coarse sand L/S |
| 16 | Providing&fixingConcreteSignBoardasperIRCspecificationofsize900x750x37mm.thickmadewithRCC1:1½:3withpakurvarietystonechipsreinforcedwithdoublelayerIRCfebric(75x75mm.mesh)andfixedwithnecessarynuts |
| 17 | Sustanibility Operation and maintenance cost 5% |
| 18 | IEC Supported cost |
| 19 | GST 18% |
| 20 | Labour Cess 1% |
| 21 | Total in Figures |
AI Tender Summary
Tender Timeline
Feb 06, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 20, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 22, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender