Replacement Of Old Dilapidated R.C.C. Deck Slab By New One Along With Minor Repair Of Wing And Return Walls Of Regulator-Cum-Bridge-Cum-Fall Structure At Ch.69.25 Of Dy-1 Of Mbbc Under Sainthia Irrigation Sub-Division
Tender Value
3.81 Lakhs
Estimated cost
Bid Submission
27 Feb 2023
0 days left
EMD
7637
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sainthia → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Replacement Of Old Dilapidated R.C.C. Deck Slab By New One Along With Minor Repair Of Wing And Return Walls Of Regulator-Cum-Bridge-Cum-Fall Structure At Ch.69.25 Of Dy-1 Of Mbbc Under Sainthia Irrigation Sub-Division
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.(I) By Manual Meansc) Reinforced Cement Concrete |
| 2 | Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications.B RCC Grade M25I. Using Concrete Mixer(i) For solid slab super-structure,a) Height upto 5m |
| 3 | Providing and laying Cement concrete Wearing coat M-30 grade with graded stone chips 19mm down including screening and cleaning approved stone chips and sand as necessary laying, finishing complete to camber and grade, curing with water, including cost and carriage of all materials and hire charges for form work including reinforcement complete as per drawing and Technical Specifications vide clause no. 2702 of MoRT&H’s Specification for Road & Bridge Works. |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.2 (ii)a. Tor Steel rods / HYSD bars / TMT bars (SAIL/ TATA/ RINL ) |
| 5 | Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. |
| 6 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b) Where staging is not required. |
| 7 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar(b) 15 mm thick plaster |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per 100 sq.m. |
| 10 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.A) Beyond 500 metre and upto 1.00 km |
| 11 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 12 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.b) Two Coats |
| 13 | Drainage Spouts in Superstructure including providing drip mouldings and also including supplying, fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no. 2705 of MoRT&H’s Specification for Road & Bridge Works. |
AI Tender Summary
Tender Timeline
Feb 06, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 27, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 01, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender