Haryana Urban Development Authority-HUDA has published Tender For Annual Maintenance Of Boosting Station In Sector-59, Faridabad Excavation Of Septic Tank And Rcc Slab In Boosting Sector-59, Faridabad And All Other Works Contingent Thereto. Submission Date for this Tender is 10-02-2023. Septic Tank Tenders in faridabad Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity |
2 | Beldar |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded cum stone aggregate 40 mm nominal size) |
4 | Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth inCement mortar 1:6 (1 cement: 6 coarse sand) |
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size) |
6 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1 :4 (1 cement: 4 fine sand) |
7 | Steel reinforcement for R.C.C. work, where not included in thecomplete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. |
8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded cum stone aggregate 40 mm nominal size) Septic Tank |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail