|
| 1 | Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50 m and lift up to 1.5 m, disposed material to be neatly dressed. |
| 2 | Preparation of beds for hedging and shrubbery by excavating 30 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth of necessary, watering and finally fine dressing, leveling etc. including stacking and disposal ofmaterials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately). |
| 3 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 4 | Carriage of material (good earth) by manual labour including loading/unloading & stacking for lead for less than 50 m. |
| 5 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m. lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). |
| 6 | Carriage of manure or sludge by manual labour including loading /unloading and stacking for lead for less than 50 m. |
| 7 | Spreading of sludge, dung manure or/and Good earth in required thickness as per direction of officer in charge (Cost of sludge, dung manure or/and good earth to be paid separately). |
| 8 | Rough Dressing the trenched ground including breaking clods |
| 9 | Fine dressing of the ground. |
| 10 | Supplying & Stacking of Selection No. 1 /doob grass at site fresh and free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. and as per direction of officer in charge. |
| 11 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately).: Holes 60 cm dia, and 60 cm deep. |
| 12 | Providing and planting of Hibiscus rosasinensis of height 45-60 cm. with 3-4 branches in earthen pot of size 20 cm |
| 13 | Providing and planting of Ficus blackii (F.vivion) of height 45-60 cm. with 6-8 branches healthy foliage in earthen pot of size 25 cm |
| 14 | Providing and fixing of PVC Pipe of Good Quality having Size 25MM. |