Yashwantrao Chavan Maharasthra Open University-YCMOU has published Tender For Erection Of Waterproof Main Dome,Stage, Pendal ,Electrification And Other Pendal Related Allied Works On Rental Basis For Organisation Of 28 Th Convocation Programme At Ycmou, Nashik (1 Day Programme). Submission Date for this Tender is 09-02-2023. Electrification Work Tenders in nashik Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | ??? - 1000 ?????????? ??? ???????? ???? ??? ??? ???? ???? ?????? 200 ???) ???? (?????-??????) ??? 80 ??? ???? (?????-??????) ? 26 ??? ??? (????????) ? ????? 13 ??? ??? ?????? ???? ??? ???????? ???? ????. (??.?.?. ???. 1 ?? 9) |
2 | ????????:- ?????????? ???? ???? ?????? 40 ???) ???? ??? 30 ??? ???? ? ?.? ??? ??? (????????) ??? ???? ????? ??????? ??????? ???? ??? ????????? ?????? ????????, ????????, ?????? ????? ??????????? ????????? ???????? ???????, ???????? ???????? ???? ??????? ????? ???? ??? ? ???? ????????? ?????? ????? ???????? ???? ????. (??.?.?. ???. 10 ?? 12) |
3 | ????? ????:- ????? ???? :- ???? ??????? 15 ???, (????) x 15 ??? (????) x 12 ??? (???) ??? ?????. (??.?.?. ???. 13 ?.???. 1) |
4 | ????? ????:- ???? ??? :- ???? ??????? 30 ???, (????) x 60 ??? (????) x 12 ??? (???) ??? ?????. (??.?.?. ???. 13 ?.???. 2) |
5 | ????? ????:- ??????? ???? :- ???? ??????? 60 ???, (????) x 30 ??? (????) x 12 ??? (???) ??? ?????. (??.?.?. ???. 13 ?.???. 3) |
6 | ????? ????:- ??? ???? :- ???? ??????? 30 ???, (????) x 30 ??? (????) x 12 ??? (???) ??? ?????. (??.?.?. ???. 13 ?.???. 4) |
7 | ????? ????:- ??? ???? :- ???? ??????? 15 ???, (????) x 30 ??? (????) x 12 ??? (???) ??? ?????. (??.?.?. ???. 13 ?.???. 5) |
8 | ????? ???????? ?????? ????? :- ????????? ????? ?? ?????????????? ?? ???????? ????????? 6 ??? ??????? ??? ?????? ?????? ?????? ?????. (??.?.?. ???. 04) |
9 | ????????? ????????:- ????????????? ?????? ???????? ???????, ?????? ?????, ?????? ?????? ????? (??.?.?. ???. 6 ?.???. 1) |
10 | ???? :-????? ????????? ? ????????????????? ???????? ??????? ????? ?? ???? (3 ?????????????? ??? ??????) (?????? ???? ???????? ???????? ???????) ??????? ??? ???????? ???? ????. (??.?.?. ???. 6 ?.???. 2) |
11 | ?????:- ?????? ?????????? ????? ?????? ? ?????????? ?????? ????????, 2 ??? ??? 2 ??? ??? 16 ??? ??????? ??????????? (????? – 1) ????????? ??????????? 2) ???? ???????????, ????????? ???? 3 ??) (??.?.?. ???. 8) |
12 | ???????? ???? :- ?????????? ???????? ?????? ?????? ????. (??.?.?. ???. 9) |
13 | ??? ???? :- ???? ?????????? ????????? 5 ??? ???????? ??? ?????? ?????? ????. (??.?.?. ???. 14) |
14 | ????? ?????????? ????? ????? ?????????? ?????? ????? :- ????? ???? ??????????? ???? ????????? ??????????????? ????? ????? Green / Red ?????? ?????. (??.?.?. ???. 16) |
15 | ?????????????? ??????????? ????/???? :- ????????/????/??? ???? ??????????? ???? ????????? ??????????????? ????? ?????? 8 ??? (???) ? ?????? 200 ??? (????) ????/???? ????? ?????? ??????. (??.?.?. ???. 15) |
16 | ????????????? ???? (Platform) :- 4 ??? (????) ??? 4 ??? (????) ??? 3 ??? (??????) ?????????? ?????????? ??????? ?????? ???????? ??????. (??.?.?. ???. 7) |
17 | 14-2-6 Hiring charges for supplying and maintaing temporary 415 V, 50 cycles AC generating set 75 to 100 kVA. Capacity with necessary fuel, mains, switchgears and accessories complete with continous runnig on load/no load as per requirements complte with self certification. Per Day |
18 | 14-1-2 Providing temporary illumination consisting of LED tube light 4" x 20w or Fluorescent tube light 4" x 36/40w, 230v, 50 Hz having colour temp up to 6500k complete erected with mains and required switchgears with continuous earth wire erected and dismantled with using scaffolding up to three days. |
19 | 14-1-8 Providing temporary illumination consisting of flood light fitting 200 W complete LED fitting having colour temp up to 6500k, IP65, housing of pressure die cast aluminium alloy and heat sink extruded aluminium complete required switchgear erected and dismantled with using scaffolding up to three days. |
20 | 14-1-15 Providing temporary illumination consisting of round LED/ neon flex LED/ flexible strip LED having 2 to 5 W capacity per meter and consisting suitable power adaptor with mains, required switchgears erected and dismantled with using scaffolding [up to 20ft height] and maintaining the same up to 3 days |
21 | 14-1-16 Providing temporary illumination consisting of water proof LED Par Light, 54 pieces x 3W, 230v, 50Hz, with RGBW controller complete erected with mains, switchgears with continuous earth wire erected and dismantled without using scaffolding up to three days |
22 | 14-1-40 Providing temporary XLPE/PVC armoured cable 4 core 50 sq mm aluminium conductor with continuous 12 SWG G.I. Earth wire complete erected with gland and lugs and switchgears and required cable protector wherever necessary up to three days |
23 | 14-1-56 Providing, commissioning and maintaining additional IP based 4.0 MP, full HD,IP67 , IR IP dome camera in existing CCTV system with necessary mains, switchgears on hire basis for one day. |
24 | 14-1-57 Providing, commissioning and maintaining additional IP based 4.0 MP, Full HD, IP67, IR IP PTZ camera in existing CCTV system with necessary mains, switchgears on hire basis for one day. |
25 | 14-1-9 Providing temporary illumination consisting of flood light fitting 300 W complete LED fitting having colour temp up to 6500k, IP65, housing of pressure die cast aluminium alloy and heat sink extruded aluminium complete required switchgear erected and dismantled without using scaffolding up to three days. |
26 | 14-1-26 Providing temporary heavy duty exhaust fan 18" or 24" 230v, 50Hz connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for three days. |
27 | 14-1-8 Providing temporary illumination consisting of flood light fitting 200 W complete LED fitting having colour temp up to 6500k, IP65, housing of pressure die cast aluminium alloy and heat sink extruded aluminium complete required switchgear erected and dismantled with using scaffolding up to three days. |
28 | 14-1-18 Providing temporary illumination consisting of water proof HMI Par Light, 4000 w, 230v, 50Hz, colour temp 6500k housing of pressure die cast aluminium alloy [multi colour] complete erected with mains, switchgears with continuous earth wire erected and dismantled without using scaffolding up to three days |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail