| 1 | Earthwork in excavation of foundation of structure as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleteriousmatter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remainging earth locally for road work - by mechanical means - depth upto 3m (Ordinary soil) |
| 2 | Supplying and filling with quarry rubbish including spreadingwatering consolidation etc., complete as directed by the Engineer-in-charge |
| 3 | Centring and shuttering including strutting, propping etc. and removal of form work for - foundations, footings, bases for columns. |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form work for - columns, piers, abutments, pillars, posts and struts |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form workfor - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 6 | Cement concrete 1:4:8 mix with stoneaggregate 40mm nominal size in foundationupto a depth of 1.5 metres below ground level and upto height of 1.5 above ground/ bed level. |
| 7 | Cement concrete 1:3:6 mix with stoneaggregates 20mm nominal size mechanicallymixed and vibrated in foundation upto a depth of 1.5 metres below groundlevel and 1.5 metres ground/bed level. |
| 8 | Reinforced cement concrete m-20 mix withstone aggregate 20mm nominal sizemechanically mixed and vibrated for bedplates exlcuding steel reinforcement, but including centering and shuttering, laid in position. |
| 9 | Reinforced cement concrete m-20 mix withstone aggregate 20mm nominal sizemechanically mixed and vibrated for reinforced concrete work in slabexcluding steel reinforcement, but including centering and shuttering, laid in position. |
| 10 | Steel reinforcement for R.C.C. worksincluding bending, binding and placing in position - Thermo Mechanical Treated Bars(ISI brand approved make) Fe - 415 or more |
| 11 | Cement plaster 12mm thick in cement mortar 1:3 |
| 12 | 6mm cement plaster of mix 1:3 (1 cement : 3 fine sand) |
| 13 | Providing and fixing premoulded bitumen joint filler, for expansion joints including the cost of sealing compound and priming coat - 12 mm wide |
| 14 | Plain cement concrete m-15 mix with stone aggregates 20mm nominal size mechanicallymixed and vibrated in superstructure upto 4.00 metre above, 1.50 metre from ground/bed level. |
| 15 | Finishing walls with water proofing cementpaint of required shade - New work (Two or more coats applied @ 3.84 kg / 10 sqm) |
| 16 | Dismantling of existing structures like culverts, bridges, retaining walls andother structure comprising of masonry,cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by manual means (Lime concrete, cement concrete grade M-10 and below. |
| 17 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceableand unserviceable materials separately - by manual means - bituminous courses |
| 18 | Providing and fixing 110 mm dia PVC pipes (4kg / cm2) in weep holes including cement concrete 1:5:10 (one cement : 5 sand : 10 graded stone aggregate ) and filling of pebbles etc., |
| 19 | Supplying and filling with gravel (excluding rock) in layers not exceeding20cm in depth , breaking clods, watering , rolling each layer with 1/2 tonne roller , or wooden or steel rammers , including all leads and lift etc., complete for making play fields , running trees and court yards |