Indian Oil Corporation Limited-IOCL has published Tender For Engineering, Procurement, Construction Epc Inclusive Of 1 Year Comprehensive Operation And Maintenance Of 320 Kwp On Grid Ground Mounted Captive Solar Power Project At Lpg Bp, Silchar, Cachar, Assam With Its Further Comprehensive O And M F. Submission Date for this Tender is 21-02-2023. Solar Power Plants Tenders in silchar Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Feb-2023 | Technical Bid | Technical Bid | 21-02-2023 |
2 | 11-Feb-2023 | Date Corrigendum | Date | 21-02-2023 |
Sl. No. | Item Description |
1 | Part - A1: Supply, Installation, Testing & Commissioning of High EfficientSolar Modules 445/ 450 Wp with 144 half cut Monocrystalline PERC Cells- IEC 61215 Ed2, IEC 61730, IEC 61701, IEC 62804 Ed.1, IEC 62716. Item includes Supply of Plant & Equipment including cable, Micro Inverter, other spares and allied Civil / ElectricalWorks related to Installation . |
2 | Part A1: Supply of Plant and equipment including Mandatory Spares : Supply of SPV module , Power Conditioning Unit(PCU), Cable, Balance of system(other than specified above) &spares as under 1. Drive for PCU as 5% of total population 2. MCCBs/MCB /AC & DC fuses as 5% of total population of each type 3. MC4 Connectors as 5% of total population 4. SPV Modules (0.5% of total population): for 320kWp Solar PV system at Borkhola, Silchar. Installation services , Civil works and Allied Works etc :installation services including design , Engineering , supply , Packing and forwarding , transportation , unloading ,storage , installation ,testing &Commissioning , Civil work and Allied wok etc including clearances from Statutory authorities. |
3 | PART-A2: Operation & Maintenance (O&M) of Solar Power Generating System for 1 Year after installation. |
4 | PART-B: (1) Operation & Maintenance (O&M)for1st year after completion of part A i.e for 2nd Year after installation. |
5 | PART-B: (2) Operation and Maintenance (O&M) for 2ndyear after completion of Part A i.e for 3rd year after Installation |
6 | PART-B: (3) Operation and Maintenance (O&M) for 3rdyear after completion of Part A i.e for 4th year after Installation |
7 | PART-B: (4) Operation and Maintenance (O&M) for 4thyear after completion of Part A i.e for5th year after Installation |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail