Tender For Renewal Of Non Patchable Roads In Ridf-28 Under Package No. Rj-28-05/Ridf-28/2022-23
Tender Value
49 Lakhs
Estimated cost
Bid Submission
20 Feb 2023
0 days left
EMD
98000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
madhopur → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Renewal of Non Patchable Roads in RIDF-28 under Package No. RJ-28-05/RIDF-28/2022-23
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) by mechanical means in area of throneyjungle |
| 2 | a) Sarsop to Tapur |
| 3 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) by mechanical means in area lightjungle |
| 4 | b) Todra to Phalodi |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 6 | a) Sarsop to Tapur |
| 7 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for Grading III material |
| 8 | a) Sarsop to Tapur |
| 9 | b) Todra to Phalodi |
| 10 | Total |
| 11 | Repair of pot holes byWet Mix Macadam material. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, compacting base of excavation as per clause 503, back filling the pot holes with wet mix macadam material by mannual meansas per clause 406, compacting with roller 8-10T, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004. |
| 12 | a) Sarsop to Tapur |
| 13 | Filling Pot- holes and Patch Repairs with open - graded Premix surfacing,20mm followed by seal coat type \"B\". (Removal of all failed material,trimming of completed excavation to provide firm vertical faces,cleaning of surface,painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511,compacting,trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) |
| 14 | a) Sarsop to Tapur |
| 15 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) |
| 16 | a) Sarsop to Tapur |
| 17 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 18 | a) Sarsop to Tapur |
| 19 | b) Todra to Phalodi |
| 20 | Total |
| 21 | Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction)for GradingII(19 mm nominal size) |
| 22 | b) Todra to Phalodi |
| 23 | 20mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/modified bitumen) Binder using plastic wasteProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing of aggregate and plastic waste cuting in a hotmix plant, laying and rolling with a three wheel80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRD Specification Clause 508(Bitumen VG-30) By mechanical means. |
| 24 | Waste Plastic @ 8% of Bitumen |
| 25 | a) Sarsop to Tapur |
| 26 | b) Todra to Phalodi |
| 27 | Total |
| 28 | Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) Case II type B |
| 29 | a) Sarsop to Tapur |
| 30 | b) Todra to Phalodi |
| 31 | Total |
| 32 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.) |
| 33 | a) Sarsop to Tapur |
| 34 | ProvidingandLayingun-reinforced, dowel jointed, plain cement concrete pavement over a preparedsub-basewith 43 gradecement, coarse andfineaggregate conforming to IS:383,maximumsizeofcoarseaggregate not exceeding 25mm, mixed in a batching and mixingplantasperapprovedmixdesign, transportedto site, laid with a fixedform or slipform paver, spread, compacted and finishedin acontinuousoperationincluding provisionof contraction,expansion, constructionand longitudinaljoints, joint filler, separationmembrane,sealantprimer,joint sealant,debondingstrip,dowelbar,tierod, admixturesand vacuum processingpump as approved, curing compound,finishing to lines andgradesasperdrawingasperMoRTH Specification : Clause No. 602, 112. Using Cement concrete M-30 pavement Grade |
| 35 | a) Sarsop to Tapur |
| 36 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .300mm dia |
| 37 | a) Sarsop to Tapur |
| 38 | b) Todra to Phalodi |
| 39 | Total |
| 40 | Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) |
| 41 | b) Todra to Phalodi |
| 42 | Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) |
| 43 | 5th kilometre stone (precast) |
| 44 | Ordinary Kilometer stone (Precast) |
| 45 | a) Sarsop to Tapur |
| 46 | b) Todra to Phalodi |
| 47 | Total |
| 48 | Hectometer stone (Precast) |
| 49 | a) Sarsop to Tapur |
| 50 | b) Todra to Phalodi |
| 51 | Total |
| 52 | Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) 90 cm equilateral triangle |
| 53 | a) Sarsop to Tapur |
| 54 | b) Todra to Phalodi |
| 55 | Total |
| 56 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual means upto 3 mtr. depth |
| 57 | a) Sarsop to Tapur |
| 58 | b) Todra to Phalodi |
| 59 | Total |
| 60 | Plain cement concrete 1:3:6 mix with crushed stone aggregate 20 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 61 | a) Sarsop to Tapur |
| 62 | b) Todra to Phalodi |
| 63 | Total |
| 64 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random rubble masonary |
| 65 | b) Todra to Phalodi |
| 66 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random rubble masonary Random rubble masonary |
| 67 | a) Sarsop to Tapur |
| 68 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20 using concrete mixer |
| 69 | a) Sarsop to Tapur |
| 70 | b) Todra to Phalodi |
| 71 | Total |
| 72 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .1000mm dia |
| 73 | a) Sarsop to Tapur |
| 74 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications |
| 75 | a) Sarsop to Tapur |
| 76 | b) Todra to Phalodi |
| 77 | Total |
AI Tender Summary
Tender Timeline
Feb 01, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 20, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 21, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender