Tender For Construction Of 11 Kv O/H Line Of 0.18 Ckm For Providing Supply To 30 Bedded Mch At Chc Barachana
Tender Value
14 Lakhs
Estimated cost
Bid Submission
15 Feb 2023
0 days left
EMD
14100
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
badachana → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 11 Kv O/H Line Of 0.18 Ckm For Providing Supply To 30 Bedded Mch At Chc Barachana
BOQ
| Sl. No. | Item Description |
| 1 | Scope of Work: PART-A :- Construction of 11 KV O/H Line of 0.18 CKM using 55 sq.mm AAAC from existing DP to proposed HT metering unit at Consumer premises.11KV Cut point with 90 degree angleS/I of WPB 160x152 (11Mtr Long 30.44 Kg/Mtr) |
| 2 | S/I of Straight cross arm 100x50x6mm, 9.56 KG/Mtr, each channel length 1.2 mtr, 4 nos. channel required= (4x9.56x1.2) |
| 3 | S/I of Fish Plate 50x6 mm, 2.36 Kg/Mtr, each 0.280 mtr length, 16 nos required= (16x2.36x0.280) |
| 4 | S/I of Straight cross arm 100x50x6mm, 9.56 KG/Mtr, each channel length 0.306 mtr, 4 nos. channel required= (4x9.56x0.306) |
| 5 | S/I of Danger Plate, 1 nos. |
| 6 | S/I of back Clamp for danger Plate 25x3 mm flat, 0.59kg/Mtr. Flat of 0.510mtr length 1 nos =(1x0.59x0.510) |
| 7 | S/I of GI barbed wire anticlimbing device 3kg. Per support |
| 8 | S/I of Back Clamp for anticlimbing device 25x3 mm flat, 0.59kg/Mtr. Flat of 0.510mtr length 4 nos =(4x0.59x0.510) |
| 9 | S/I of 11KV Pin insulator Polymer (Extra 3 nos. considered at T-off point) |
| 10 | S/I of HW fittng ( B & S) 70KN, 3bolt(Extra 3 nos. considered at T-off point) |
| 11 | S/I of Disc Insulator (B & S) 70KN polymer(Extra 3 nos. considered at T-off point) |
| 12 | S/I of Earthingof support (Coil type ) |
| 13 | S/I of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr-2 Mtr. for connecting pole with coil earthing |
| 14 | S/I of PG clamp for 55 sq.mm AAA conductor |
| 15 | S/I of H.T Stay clamp, 50x8 mm flat, 3.14kg/mtr, 0.551mtr length, 2nos. qty required (1 Pair) |
| 16 | S/I of HT Stay Set (complete) |
| 17 | Supply & installation of HT Stay insulator Type-C |
| 18 | Supply & installation of 7/10 SWG Stay wire 15kg/stay |
| 19 | S/F of GI Nut, Bolt & washer of different sizes (7.433 kg each cut pole) |
| 20 | Supply & painting with black Paint. |
| 21 | Supply& painting with yellow colour paint for background |
| 22 | Fixing of complete 11KV line complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire 5) Stay Clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & standard |
| 23 | Concreting ratio 1:1.5:3 (500mmx500mmx1800mm )=0.45 Cu.mtr |
| 24 | Couping ratio 1:1.5:3 with dimension (500x500x450)=0.1125 Cu.mtr |
| 25 | S/I of WPB 160x152 (11Mtr Long 30.44 Kg/Mtr) |
| 26 | S/I of 11KV \"V\" Cross Arm (10.2 K.g each) |
| 27 | S/I of Top bracket 100x50x6mm GI Channel (2kg each) |
| 28 | S/I of Danger Plate, 1 nos.for each pole |
| 29 | S/I of back Clamp for danger Plate 25x3 mm flat, 0.59kg/Mtr. Flat of 0.510mtr length 1 nos =(1x0.59x0.510) |
| 30 | S/I of GI barbed wire anticlimbing device 3kg. Per support |
| 31 | S/I of Back Clamp for anticlimbing device 25x3 mm flat, 0.59kg/Mtr. Flat of 0.510mtr length 4 nos =(4x0.59x0.510) |
| 32 | S/I of 11KV Pin insulator Polymer, 3nos. Required for each support |
| 33 | S/I of Earthing support (Coil type ) |
| 34 | S/I of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr-2 Mtr. for connecting pole with coil earthing |
| 35 | S/F of GI Nut, Bolt & washer of different sizes (1.45 kg / pin point) |
| 36 | S/I of 55 mm2 AAAC |
| 37 | Supply & painting with black Paint. |
| 38 | Supply& painting with yellow colour paint for background |
| 39 | Concreting ratio 1:1.5:3 (500mmx500mmx1800mm )=0.45 Cu.mtr |
| 40 | Couping ratio 1:1.5:3 with dimension (500x500x450)=0.1125 Cu.mtr |
| 41 | Scope of Work: PART-B :- Installation of 1 No of DP with AB Switch & LA using 11 mtr WPB pole for HT metering at consumer premisesS/I of WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 42 | S/I ofTop Channel 100 X 50 X 6 MM, 9.56Kg./Mtr, each channel length 3 mtr, 4 No\"s channel required= (2x9.56x3) |
| 43 | S/I ofFish Plate 50x6 mm .2.36 Kg/Mtr. each 0.280 mtr. length 6 no\"s required = (6x2.36x0.280) |
| 44 | S/I ofAB Switch Mounting Channel 75x40x4.8 mm, 7.14Kg./Mtr, Each channel length 3mtr, 2nos. Channel required -(7.14x3x2) |
| 45 | S/I ofHT MU Mounting Channel 75x40x4.8 mm , 7 14Kg /Mtr, each channel length 3 mtr., 2nos. Channel required= (7.14x3x2) |
| 46 | S/I of Cantilever GI channel for supporting for HT MU 75x40x4.8 mm(810 mm long,2 No\"s.) (7.14Kg per mtr. ) (Each 2x0.81x7.14) |
| 47 | S/I of Angle for Cantilever arrangement for HT MU 50 X 50 X 6-1282 mm each 2nos.(4.5Kg per mtr.) (Each 2x1.282x4.5) |
| 48 | S/I ofAB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no\"s channel required =( 9.56x2x0.35) |
| 49 | S/I ofChannel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr . each channel length 0.8 Mtr .. 1 no\"s channel required=( 7.14x0.8x1) |
| 50 | S/I of Double pole Bracing Channel 75x40x4.8mm, 7.14KG/Mtr each channel length3.0Mtr, 2nos. Channel required=(7.14x3x2) |
| 51 | S/I of 50x50x6mm GI Bracing Angle, 4.5Kg/mtr, each angle length 3.512 mtr, 2nos. Angle required=(4.5x3.512x2) |
| 52 | S/I of Danger plate 2 nos. |
| 53 | S/I of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of0.510 mtr length 2 no\"s = ( 2 x0.59x0.510) |
| 54 | S/I of55mm2 all alloy alluminium conductor (AAAC)-for jumpering |
| 55 | S/I of HT Stay Clamp 50x8mm, flat 3.14kg/mtr, 0.551 mtr length 2nos. Qty required (1 pair) |
| 56 | S/I of HT Stay Set (complete) |
| 57 | Supply & installation of HT Stay insulator Type-C |
| 58 | Supply & installation of 7/10 SWG GI Stay wire (15 Kg/set) |
| 59 | S/I of GI Pipe earthing 40mm, 3 meters long |
| 60 | 50x6mm GI Flat for earthing, 2.36kg/mtr . (12.5 mtr for L.A, 3mtr for AB switch body, 2.5 mtr. For mesh formation and 2.5 mtr For raising) 20.5x2.36 |
| 61 | GI barbed wire anticlimbina device 3 Kg Per support 2 no\"s qty. required =(2x3kg) |
| 62 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no\"s =(8x0.59x0.510) |
| 63 | S/I of Lightning Arrestor (11KV-10KA) Station class-2 |
| 64 | S/I ofAB Switch (11KV,200A,3pole,50 HZ) |
| 65 | S/I of 11KV Pin insulator Polymer as per RE specification |
| 66 | S/I of HW fittng ( B & S) 70KN, 3bolt |
| 67 | S/I of PG clamp for 55 sq.mm AAA conductor |
| 68 | S/I of Disc Insulator (B & S) 70KN polymer |
| 69 | S/F of GI Nut, Bolt & washer of different sizes (13.718 kg each DP with AB switch) |
| 70 | Supply & painting with black Paint. |
| 71 | Supply& painting with yellowcolour paint for background |
| 72 | Fixing of complete 11KV line complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire 5) Stay Clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & standard |
| 73 | Concreting ratio 1:1.5:3 (500mmx500mmx1800mm )=0.45 Cu.mtr |
| 74 | Couping ratio 1:1.5:3 with dimension (500x500x450)=0.1125 Cu.mtr |
| 75 | Construction earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance including installation pf 3mtr GI pipe 40mm/50mm including welding of GI flat around pipe. |
| 76 | Supply and erection of GI Fencing with gate |
| 77 | Scope of Work: PART-C :- Installation of 11/0.433 KV, 250 KVA DSS-1 NoS/I of WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 78 | S/I of Top Channel GI 100 X 50 X 6 MM(3000 mm long) (9.56Kg./Mtr, 2 No\"s.) (Each 2x3.000x9.56= 57.36 Kg) |
| 79 | S/I of Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no\"s required = (6x2.36x0.280) |
| 80 | S/I of Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 2 no\"s channel required =( 7.14x3x2) |
| 81 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 2 nos angle required = (4.5x3.512x2) |
| 82 | S/I of AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No\"s.) (Each 2x3.000x7.14= 42.84 Kg) |
| 83 | S/I of AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no\"s channel required =( 9.56x2x0.35) |
| 84 | S/I of Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no\"s channel required =( 7.14x0.8x1) |
| 85 | S/I of HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No\"s.) (Each 2x3.000x7.14= 39.98 Kg) |
| 86 | S/I of Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No\"s.) (7.14Kg./Mtr., 2 No\"s.) (Each 2x0.810x7.14= 11.57 Kg) |
| 87 | S/I of Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No\"s.) (Each 2x1.282x4.5= 11.54Kg) |
| 88 | S/I of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no\"s(Each 2x0.59x0.510) |
| 89 | S/I of 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 90 | S/I of 250 KVA , 11/ 0.4 KV (Cu) Transformer with Tap Changer BIS Energy level II |
| 91 | S/I of LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S |
| 92 | S/I of 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 93 | S/F of 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 94 | S/F of AB Switch(11KV,200A.3pole,50Hz) |
| 95 | S/F ofH.G.Fuse( 11KV.200A.3Pole) |
| 96 | S/F of PG Clamp for 55 sq.mm AAA conductor |
| 97 | S/F of Disc insulator (B&S)70 KN polymer |
| 98 | S/F of H W fitting (B&S)70KN(3bolted) |
| 99 | S/F of Lightning Arrester(12KV,10KA) Station Class 2 |
| 100 | S/F of 11KV pin insulator polymer |
| 101 | S/F of HT stay set complete |
| 102 | S/F of HT stay Clamp (1.9Kg/pair) |
| 103 | S/F of HT stay insulator TYPE-C |
| 104 | S/F of 7/10 SWG GI stay wire, Grade -2(15Kg./ Set) |
| 105 | S/F of 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 106 | S/F of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 107 | S/F of GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 108 | S/F of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no\"s = (8x0.59x0.510) |
| 109 | S/F of Danger plate 11kv |
| 110 | S/F of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no\"s = (2x0.59x0.510) |
| 111 | S/F of Name plate |
| 112 | Supply& painting with Yellow Colour Paint for Background |
| 113 | Supply& painting with Black Colour Paint for numbering |
| 114 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr |
| 115 | Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr |
| 116 | Fixing of stay set with 0.5Cumcement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 117 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 118 | LTDB Plinth |
| 119 | DTR Plinth |
| 120 | Supply and Erection of GI Fencing with Gate |
AI Tender Summary
Tender Timeline
Feb 01, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 15, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 16, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓