Power Government Departments Closing in 0 days TDR #35946915

Tender For Construction Of Hl Bridge Over Local Stream On Road Mrl24-Gandhi School To Jamghati Via Birsodih At Ch-6200 , Bridge Length-96.84 M , Package No- Jh13kodmars105. 2.Construction Of Hl Bridge Over Local Stream On Road Mrl-20 Beko To Naitand Ch:-

Issued by Government Departments · koderma, Jharkhand
Tender Value
6.26 Crore
Estimated cost
Bid Submission
08 Feb 2023
0 days left
EMD
12.53 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
koderma → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Hl Bridge Over Local Stream On Road Mrl24-Gandhi School To Jamghati Via Birsodih At Ch-6200 , Bridge Length-96.84 M , Package No- Jh13kodmars105. 2.Construction Of Hl Bridge Over Local Stream On Road Mrl-20 Beko To Naitand Ch:- 1947 , Length Of Bridge - 22.36 M , Koderma District

BOQ

Name of Work: 1.Construction of HL Bridge Over local Stream on Road MRL24-GANDHI SCHOOL TO JAMGHATI VIA BIRSODIH AT CH-6200 , Bridge length-96.84 m , Package no- JH13KODMARS105. 2.Construction of HL Bridge Over local Stream on Road MRL-20 Beko to Naitand CH:- 1947 , Length of Bridge - 22.36 M ,Koderma District
Sl. No. Item Description
11.Construction of HL Bridge Over local Stream on Road MRL24-GANDHI SCHOOL TO JAMGHATI VIA BIRSODIH AT CH-6200 , Bridge length-96.84 m , Package no- JH13KODMARS105.
2Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means
3Depth upto 3m
4Depth between 3m to 6m
5Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means
6Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification
7PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)
8Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15)Annular Filling
9PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification
10Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)
11Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)
12Height Upto5m
13Height between 5m to 10m
14Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawingface. Complete as per drawing and technical specification.
15Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30RCC T-Beam & Slab (Height between 5m to 10m)
16Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification.
17Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer\"s instructions for installation.
18Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.
19Providing drainage spout complete as per drawing and technical specification
20Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.
21Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.
22Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
23Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
24Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
25Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification
26Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications
27Carrying out confirmatory boring for soil investigation/geotechnical investigation for each foundation as per clause 2400 of MOST Specification.
28Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
29Construction of Embankment with Material deposited from Borrow Pits (Construction of embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) Rolling with Vibratory roller.
30Compacting original ground supporting embankment (. Rolling with vibratory roller
31Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
32Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
33Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means)
34Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
35Providing and laying bituminous macadam( replacing bitumen by 8% with waste plastic ) with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504.
36Providing and laying semi dense bituminous concrete (replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
37Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications. (Stone / Boulder )
38Providing PMGSY LOGO as per drawing and technical specification.
39Providing Rectrorefractive sign board as per IRC 67 made of encapsulated lense type reflecting sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thk. Supported on mild steel angle.
40Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means.
41Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification
42Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 )
43Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications.
44Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.
45Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 )For Coping
46First Year Maintenance
47Second Year Maintenance
48Third Year Maintenance
49Fourth Year Maintenance
50Fifth Year Maintenance
512.Construction of HL Bridge Over local Stream on Road MRL-20 Beko to Naitand CH:- 1947 , Length of Bridge - 22.36 M ,Koderma District
52Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means
53Depth upto 3m
54Depth between 3m to 6m
55Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means
56Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification
57PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)
58Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15)Annular Filling
59PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification
60Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)
61Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)
62Height Upto5m
63Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawingface. Complete as per drawing and technical specification.
64Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30RCC T-Beam & Slab (Height between 5m to 10m)
65Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification.
66Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer\"s instructions for installation.
67Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.
68Providing drainage spout complete as per drawing and technical specification
69Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.
70Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.
71Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
72Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
73Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
74Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification
75Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications
76Carrying out confirmatory boring for soil investigation/geotechnical investigation for each foundation as per clause 2400 of MOST Specification.
77Compacting original ground supporting embankment (. Rolling with vibratory roller
78Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
79Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
80Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means)
81Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
82Providing and laying bituminous macadam( replacing bitumen by 8% with waste plastic ) with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504.
83Providing and laying semi dense bituminous concrete (replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
84Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications. (Stone / Boulder )
85Providing PMGSY LOGO as per drawing and technical specification.
86Providing Rectrorefractive sign board as per IRC 67 made of encapsulated lense type reflecting sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thk. Supported on mild steel angle.
871st year Maintenance
882nd year Maintenance
893rd year Maintenance
904th year Maintenance
915th year Maintenance
92GST @ 18%
93Labour Cess @ 1%

AI Tender Summary

OUR REF NO 35946915
AUTHORITY Government Departments
TENDER VALUE 6.26 Crore
LAST DATE 08-02-2023
Authority
Authority Name Jharkhand State Rural Road Development Authority
Work Description Construction Of Hl Bridge Over Local Stream On Road Mrl24-Gandhi School To Jamghati Via Birsodih At Ch-6200 , Bridge Length-96.84 M , Package No- Jh13kodmars105. 2.Construction Of Hl Bridge Over Local Stream On Road Mrl-20 Beko To Naitand Ch:- 1947 , Length Of Bridge - 22.36 M , Koderma District
Basic Detail
Tender No PMGSY-III-NIT-59
Bidding Type Tender
Location
City koderma
State Jharkhand
Key Dates
Publish Date 27 Jan 2023
Submission Date 08 Feb 2023
Open Date 09 Feb 2023
Finance
Tender Value 6.26 Crore
Tender Fee 10000
EMD 12.53 Lakhs
Exemption Not Available
Document List
72a912b0-7ac4-4cf3-8199-524dbe9086c5.html
BOQ_195983.xls
JH-P3-22-23-KOD-LSB-01.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 27, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 08, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 09, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

72a912b0-7ac4-4cf3-8199-524dbe9086c5.html

xls

BOQ_195983.xls

pdf

JH-P3-22-23-KOD-LSB-01.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender