Tender For Procurement Of 4 Nos Of S Band Dual Polarized Doppler Weather Radar Klystron Based

Issued by Government Departments · Delhi, Delhi
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 May 2023
0 days left
EMD
1.65 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Procurement Of 4 Nos Of S Band Dual Polarized Doppler Weather Radar Klystron Based , Dismantling Of Old S-Band Dwr At Site , Applicable Taxes/Gst , Supply, Installation And Commissioning Of S-Band Dual Polarized Klystron Based Doppler Weather Radar Systems Including All Units/Sub Units And Accessories From 2.1 To 22.1.Transmitter .... , Applicable Taxes/Gst On Transmitter , Receiver , Applicable Taxes/Gst On Receiver , Antenna Control Unit And Radar Control Unit , Applicable Taxes/Gst On Antenna Control Unit And Radar Control Unit , Radar Signal Processor , Applicable Taxes/Gst , Radome, Antenna &Antenna Pedestal , Applicable Taxes/Gst , Peripherals At 4 Sites As Per Details At 4.45(Peripherals) , Applicable Taxes/Gst , Radar Application And Operating Software , Applicable Taxes/Gst , Peripherals As Per Details At 4.45 For One Central Server At Delhi , Applicable Taxes/Gst , Server With Web Gis At 4 Sites & 1 At Control Command Centre Server At Delhi. , Applicable Taxes/Gst , Acceptance Testing (Site) , Applicable Taxes/Gst , Installation , Applicable Taxes/Gst , Services , Applicable Taxes/Gst , Products (Software) , Applicable Taxes/Gst , Any Other Unit/Subunits/Item Not Listed Above But Required For Functioning Of Dwr Shal Also Be Included , Applicable Taxes/Gst , Installation Material , Applicable Taxes/Gst , Documentation Both Hard Copy And Soft Copy - Two Copies At Each Site And Two Copies At Hq , Applicable Taxes/Gst , Communication Hardware/Software For Data Transfer To Control Center Location , Applicable Taxes/Gst , Standard Tools And Test And Measuring Equipment Sets Along With All Accessories Required For Complete Set-Up As Per Annexure-Xv; To Be Provided At Each Site For Testing And Measuring Radar Parameter/Offline Calibration Of Radar. , Applicable Taxes/Gst , Onsite Training At Four Sites For A Period Of Five Working Days And At One Site At Delhi Of Central Server Location (For A Period Of Three Working Days) In Operations And First Level Fault Identification To Be Provided For At Least 5 Imd Persons At Each Site. Note: Expenses For Trainees Such As Airfare, Lodging And Per Diem To Be Borne By Imd. , Applicable Taxes/Gst , Successful Contractor Shall Provide Factory Training In Operation, Maintenance, Calibration And Fault Identification Of Th Radar System Along With Modification & Up-Gradation In Application Software To 4 Persons From Imd At The Factory Premises For A Period Of 4 Weeks. Note: Expenses For Trainees Such As Airfare, Lodging And Per Diem To Be Borne By Imd. , Applicable Taxes/Gst , Comprehensive Annual Maintenance Contract (Camc) For All Radar Sites After The Expiry Of 3 Years Warranty Period...... For 1St Year Camc ...... , Applicable Taxes/Gst , 2Nd Year Camc , Applicable Taxes/Gst , 3Rd Year Camc , Applicable Taxes/Gst , 4Th Year Camc , Applicable Taxes/Gst , 5Th Year Camc , Applicable Taxes/Gst , 6Th Year Camc , Applicable Taxes/Gst , 7Th Year Camc , Applicable Taxes/Gst , Comprehensive Annual Maintenance Contract (Camc) For Central Server After The Expiry Of 3 Years Warranty Period....... For 1St Year Camc ...... , Applicable Taxes/Gst For 1St Year , 2Nd Year Camc For Central Server , Applicable Taxes/Gst , 3Rd Year Camc For Central Server , Applicable Taxes/Gst , 4Th Year Camc For Central Server , Applicable Taxes/Gst , 5Th Year Camc For Central Server , Applicable Taxes/Gst , 6Th Year Camc For Central Server , Applicable Taxes/Gst , 7Th Year Camc For Central Server , Applicable Taxes/Gst , Two Ups Each Of Minimum 20 Kva Capacity Or As Per System Requirement. , Applicable Taxes/Gst , Three Phase Air Cooled Servo Voltage Stabilizer Capacity Of 65 Kva, Automatic, I/P Voltage (Phase To Phase) 240-480, O/P Voltage 415 (Phase To Phase) With Digital Display. , Applicable Taxes/Gst

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 15-Feb-2023 pre bid meeting Other 15-Mar-2023
2 14-Mar-2023 closing date extention upto 14.04.2023 Date 14-Apr-2023
3 12-Apr-2023 boq correction Other 29-Apr-2023
4 12-Apr-2023 extension of bid submission end date upto 29.04.2023 Date 29-Apr-2023
5 27-Apr-2023 corrected boq in pdf formate Other 29-Apr-2023
6 28-Apr-2023 Closing date and time for submission of tender up to 15-05-2023 at 17.00 hrs. Date 15-May-2023
7 15-May-2023 extension of closing date upto 30.05.2023 Date 30-May-2023
8 16-May-2023 change in point no 3 and 4 and modified price schedule Other 30-May-2023

BOQ

Name of Work: Dismantling of old S-Band DWR and Procurement of 4 Nos. of S-Band dual polarized Klystron based Doppler Weather Radar Systems
Sl. No. Item Description
1Dismantling of old S-Band DWR at site
2Applicable Taxes/GST
3Supply, Installation and Commissioning of S-Band Dual polarized KLYSTRON based Doppler Weather Radar Systems including all units/sub units and accessories from 2.1 to 22.1.Transmitter ....
4Applicable Taxes/GST on Transmitter
5Receiver
6Applicable Taxes/GST on Receiver
7Antenna control unit and Radar control unit
8Applicable Taxes/GST on Antenna control unit and Radar Control unit
9Radar signal processor
10Applicable Taxes/GST
11Radome, Antenna &antenna Pedestal
12Applicable Taxes/GST
13Peripherals at 4 sites as per details at 4.45(peripherals)
14Applicable Taxes/GST
15Radar Application and operating software
16Applicable Taxes/GST
17Peripherals as per details at 4.45 for one central server at delhi
18Applicable Taxes/GST
19Server with Web GIS at 4 sites & 1 at control command centre server at Delhi.
20Applicable Taxes/GST
21Acceptance testing (site)
22Applicable Taxes/GST
23Installation
24Applicable Taxes/GST
25Services
26Applicable Taxes/GST
27Products (software)
28Applicable Taxes/GST
29Any other unit/subunits/item not listed above but required for functioning of DWR shal also be included
30Applicable Taxes/GST
31Installation material
32Applicable Taxes/GST
33Documentation both hard copy and soft copy - Two copies at each site and two copies at HQ
34Applicable Taxes/GST
35Communication hardware/software for data transfer to control center location
36Applicable Taxes/GST
37Standard tools and test and measuring equipment sets along with all accessories required for complete set-up as per Annexure-XV; to be provided at each site for testing and measuring radar parameter/offline calibration of radar.
38Applicable Taxes/GST
39Onsite training at four sites for a period of five working days and at one site at Delhi of central server location (for a period of three working days) in operations and first level fault identification to be provided for at least 5 IMD persons at each site. Note: Expenses for trainees such as airfare, lodging and per diem to be borne by IMD.
40Applicable Taxes/GST
41Successful contractor shall provide factory training in operation, maintenance, calibration and fault identification of th radar system along with modification & up-gradation in application software to 4 persons from IMD at the factory premises for a period of 4 weeks. Note: Expenses for trainees such as airfare, lodging and per diem to be borne by IMD.
42Applicable Taxes/GST
43Comprehensive Annual Maintenance Contract (CAMC) for all radar sites after the expiry of 3 years warranty period...... For 1st Year CAMC ......
44Applicable Taxes/GST
452nd Year CAMC
46Applicable Taxes/GST
473rd Year CAMC
48Applicable Taxes/GST
494th Year CAMC
50Applicable Taxes/GST
515th Year CAMC
52Applicable Taxes/GST
536th Year CAMC
54Applicable Taxes/GST
557th Year CAMC
56Applicable Taxes/GST
57Comprehensive Annual Maintenance Contract (CAMC) for Central Server after the expiry of 3 years warranty period....... For 1st Year CAMC ......
58Applicable Taxes/GST for 1st Year
592nd Year CAMC for central server
60Applicable Taxes/GST
613rd Year CAMC for central server
62Applicable Taxes/GST
634th Year CAMC for central server
64Applicable Taxes/GST
655th Year CAMC for central server
66Applicable Taxes/GST
676th Year CAMC for central server
68Applicable Taxes/GST
697th Year CAMC for central server
70Applicable Taxes/GST
71Two UPS each of minimum 20 KVA capacity or as per system requirement.
72Applicable Taxes/GST
73Three phase air cooled servo voltage stabilizer capacity of 65 KVA, automatic, I/P voltage (phase to phase) 240-480, O/P voltage 415 (phase to phase) with digital display.
74Applicable Taxes/GST

AI Tender Summary

OUR REF NO 35939250
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 30-05-2023
Authority
Authority Name India Meteorological Department
Work Description Procurement Of 4 Nos Of S Band Dual Polarized Doppler Weather Radar Klystron Based , Dismantling Of Old S-Band Dwr At Site , Applicable Taxes/Gst , Supply, Installation And Commissioning Of S-Band Dual Polarized Klystron Based Doppler Weather Radar Systems Including All Units/Sub Units And Accessories From 2.1 To 22.1.Transmitter .... , Applicable Taxes/Gst On Transmitter , Receiver , Applicable Taxes/Gst On Receiver , Antenna Control Unit And Radar Control Unit , Applicable Taxes/Gst On Antenna Control Unit And Radar Control Unit , Radar Signal Processor , Applicable Taxes/Gst , Radome, Antenna &Antenna Pedestal , Applicable Taxes/Gst , Peripherals At 4 Sites As Per Details At 4.45(Peripherals) , Applicable Taxes/Gst , Radar Application And Operating Software , Applicable Taxes/Gst , Peripherals As Per Details At 4.45 For One Central Server At Delhi , Applicable Taxes/Gst , Server With Web Gis At 4 Sites & 1 At Control Command Centre Server At Delhi. , Applicable Taxes/Gst , Acceptance Testing (Site) , Applicable Taxes/Gst , Installation , Applicable Taxes/Gst , Services , Applicable Taxes/Gst , Products (Software) , Applicable Taxes/Gst , Any Other Unit/Subunits/Item Not Listed Above But Required For Functioning Of Dwr Shal Also Be Included , Applicable Taxes/Gst , Installation Material , Applicable Taxes/Gst , Documentation Both Hard Copy And Soft Copy - Two Copies At Each Site And Two Copies At Hq , Applicable Taxes/Gst , Communication Hardware/Software For Data Transfer To Control Center Location , Applicable Taxes/Gst , Standard Tools And Test And Measuring Equipment Sets Along With All Accessories Required For Complete Set-Up As Per Annexure-Xv; To Be Provided At Each Site For Testing And Measuring Radar Parameter/Offline Calibration Of Radar. , Applicable Taxes/Gst , Onsite Training At Four Sites For A Period Of Five Working Days And At One Site At Delhi Of Central Server Location (For A Period Of Three Working Days) In Operations And First Level Fault Identification To Be Provided For At Least 5 Imd Persons At Each Site. Note: Expenses For Trainees Such As Airfare, Lodging And Per Diem To Be Borne By Imd. , Applicable Taxes/Gst , Successful Contractor Shall Provide Factory Training In Operation, Maintenance, Calibration And Fault Identification Of Th Radar System Along With Modification & Up-Gradation In Application Software To 4 Persons From Imd At The Factory Premises For A Period Of 4 Weeks. Note: Expenses For Trainees Such As Airfare, Lodging And Per Diem To Be Borne By Imd. , Applicable Taxes/Gst , Comprehensive Annual Maintenance Contract (Camc) For All Radar Sites After The Expiry Of 3 Years Warranty Period...... For 1St Year Camc ...... , Applicable Taxes/Gst , 2Nd Year Camc , Applicable Taxes/Gst , 3Rd Year Camc , Applicable Taxes/Gst , 4Th Year Camc , Applicable Taxes/Gst , 5Th Year Camc , Applicable Taxes/Gst , 6Th Year Camc , Applicable Taxes/Gst , 7Th Year Camc , Applicable Taxes/Gst , Comprehensive Annual Maintenance Contract (Camc) For Central Server After The Expiry Of 3 Years Warranty Period....... For 1St Year Camc ...... , Applicable Taxes/Gst For 1St Year , 2Nd Year Camc For Central Server , Applicable Taxes/Gst , 3Rd Year Camc For Central Server , Applicable Taxes/Gst , 4Th Year Camc For Central Server , Applicable Taxes/Gst , 5Th Year Camc For Central Server , Applicable Taxes/Gst , 6Th Year Camc For Central Server , Applicable Taxes/Gst , 7Th Year Camc For Central Server , Applicable Taxes/Gst , Two Ups Each Of Minimum 20 Kva Capacity Or As Per System Requirement. , Applicable Taxes/Gst , Three Phase Air Cooled Servo Voltage Stabilizer Capacity Of 65 Kva, Automatic, I/P Voltage (Phase To Phase) 240-480, O/P Voltage 415 (Phase To Phase) With Digital Display. , Applicable Taxes/Gst
Basic Detail
Tender No CPU/53/0123/1549
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 16 May 2023
Submission Date 30 May 2023
Open Date 17 Mar 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.65 Crore
Exemption Not Available
Document List
0c849e45-4271-453a-a567-4297900ba4fe.html
BOQ_774982.xls
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 16, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 15, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 14, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 29, 2023
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 29, 2023
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 29, 2023
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 15, 2023
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2023
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2023
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 17, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

0c849e45-4271-453a-a567-4297900ba4fe.html

xls

BOQ_774982.xls

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

TenderDetail
Loading tenders