|
| 1 | Description of work/ supply materials |
| 2 | TANK-1000L Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer |
| 3 | Earth work in excavation for foundation trenches in all sorts of soil including removing spreading of staking the spoils within a lead of 75m as directed including trimming the side of trenches leveling, dressingand ramming the button, bailing |
| 4 | Single brick flat soling…. |
| 5 | Cement concrete….(1:3:6) |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation |
| 7 | Supply of PVC pipes & fittings Schedule 80 (medium duty) conformingto ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239(Part - I)…….) 32 mm dia PVC (ASTMD) |
| 8 | 25 mm dia PVC (ASTMD) |
| 9 | 15 mm dia PVC (ASTMD) |
| 10 | Supplying PVC strainer of approved make with adapter conforming toI.S.12818 specifications. |
| 11 | Laying Rising main, delivery main, Over flow, wash out pipe line with supplying, fitting, &fixing PVC pipes of approved make (Medium duty) conforming to ASTMD -1785schedule -80 and threaded to match with G.I. pipes as per IS: 1239 (Part-I) with all necessary accessories, specials, viz socket, bend, tee, union, cross, elbow, nipple, longs crew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps ,including cutting pipes, making threads , fitting , fixing etc. in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground to feed the water nearest to houses at least one habitation to get water through stand post and complete the all works as per drawing & direction of the E.I.C. (Suggested brand :- Supreme / Oriplast / Long last). |
| 12 | Supplying, delivery & Erection of pre-fabricated M.S. Steel structure of 3.00 mtr. Height above G.L. for resting of 3000 LITRE. capacity H.D.P.E. water storage tank of approved brand capable of extreme weather conditions including wind thrust upto 100 KM/Hour with fixing of necessary MS ladder/railing and painting with appropriate weather coats includingall allied works as per approved drawing and direction of the E.I.C. |
| 13 | Supply, delivery & installation of 1000 watt peak capacity Solar Photovoltaic array panels ( HR solar/ Topsun/Vikram/Webel Solar/ Waaree make ) along with 1 H.P. capacity Solar Photovoltaic AC submersible pumpset (designed to use with Solar Power) in the New/existing bore-well /Tube well of approved brand (KSB/CG/DUKE/SHAKTI/CRI/SUNLIGHT make ) having discharge capacitynot less than 1000 Ltrs /hour at 40 Mtrs. head including supply of all necessary materials viz. required dia. column pipes etc. as specified of approved quality,labour etc. with all allied works as per direction of site In charge/ Engineer |
| 14 | Installation of pump, riser pipes, connecting rods, brass cylinder etc if required including supplying the required quantity spare parts of approved quality and fitting the same in position by engaging expert tube well mechanic & helper with necessary tools & plants after lowering of Solar Photovoltaic submersible pump set. |
| 15 | Installation of Solar photovoltaic array /sunlight Panels on the structure as per standard & approved drawing which will grouted either ground based by construction of foundation concrete or integrated with the staging steel structure of water tank. The Solar Panels will then be connected to the Pump Controller which in turn will be connected to the pump as well as the level indicator of the water tank. |
| 16 | Extra carrying charges for transportation of all materials related with the above work at working site by any means or by manual labour time to time including head load due to inaccessibility of site if required with specific prior permission from the EIC. |
| 17 | Iron Purifire machine removes the iron and others impurities from the water and also kills bacteria through a UV lamp. The entire power comes from solar energy and there is no batterry sotrage. The energy is stored in the from of pure water which will be adequatefor two days back up. |
| 18 | RCC RING 3feet |
| 19 | Add GST @ 18 % |
| 20 | Add Cess @ 1% |