Construction Of Compound Wall At Thangassery Harbour Behind Investigation Office And Waste Water Management At Thangassery Harbour, Kollam-Kerala

Harbour Engineering Department has published Construction Of Compound Wall At Thangassery Harbour Behind Investigation Office And Waste Water Management At Thangassery Harbour. Submission Date for this Tender is 10-02-2023. Wall Construction Tenders in Kollam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

35926488
Corrigendum : Construction Of Compound Wall At Thangassery Harbour Behind Investigation Office And Waste Water Management At Thangassery Harbour
Open Tender
Indian
Kerala
Kollam
10-02-2023

Tender Details

Construction Of Compound Wall At Thangassery Harbour Behind Investigation Office And Waste Water Management At Thangassery Harbour

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-Feb-2023 Date Extension Date 10-02-2023

Key Value

Document Fees
INR 2760 /-
EMD
INR 26193.0 /-
Tender Value
INR 10.47 Lakhs /-

BOQ Items

Work Name:GENERAL-construction of compound wall at thangassery harbour-Construction of compound wall at Thangassery Harbour ,Behind Investigation Office and Waste water management at Thangassery Harbour-General Civil Work-compound wall
Sl. No. Item Description
1construction of compound wall
215.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
315.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
42.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
560.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
660.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
77.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
850.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
913.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
1013.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
1110.22:Welding by gas or electric plant including transportation of plant at site etc. complete.
12OD1260/2022-2023:engaging beldar
13OD1261/2022-2023:engaging black smith
14compound wall Mord
1511.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
1611.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
17OD1253/2022-2023: PVC WEEP HOLES- Providing weep holes using 50mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete
18OD1265/2022-2023:Filling with departmental sand Fillingwith departmental sand spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
19toilet block waste water outlet
2050.18.9.9.2:Providing and fixing PVC pipes includes joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in CHarge. 110 mm dia 4 Kg/cm2
2150.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend
2250.18.9.22.5:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes including jointing with PVC solvent cement 110x110x110 mm dia Tee
2350.18.9.22.9:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -110 mm dia offset
2450.18.9.22.11:Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes,including jointing with PVC solvent cement - 110 mm dia Socket/ coupling
252.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
264.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
275.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
2815.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
29OD1264/2022-2023:Engaging Coolie
305.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
31Removing piled up sand in harbour
32OD1856/2022-2023:Using Hydraulic excavator
33Dismantling of shed
34OD1858/2022-2023:Engaging Coolie
35OD1859/2022-2023:15.17 Dismantling steel work in single sections including dismembeling and stacking within 50 metes lead GI pipes
36OD1860/2022-2023:Dismantling aluminium sheet lean to roof and stacking the material within 50 metres lead of
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail