Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #35923481

Tender For Bheengi Parkandi And Uthind Water Supply Scheme Of Block Ukhimath Survey, Design Andconstruction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Incl

Issued by Government Departments · ukhimath, Uttarakhand
Tender Value
1.87 Crore
Estimated cost
Bid Submission
02 Feb 2023
0 days left
EMD
3.74 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
ukhimath → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bheengi Parkandi And Uthind Water Supply Scheme Of Block Ukhimath Survey, Design And Construction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing & Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance.1-Bheengi W / S Scheme, Parkandi W / S Scheme & Uthind W / S Scheme Of Block Ukhimath

BOQ

Name of Work: Survey, design andconstruction of following water supply scheme, Consisting of Source Work, Supply main, RCC CWRS, distribution systems, FHTC and all other appurtenant works including supply & cartage of all materials, labor and t&p etc. complete for proper completion of works. it is also including testing & commissioning ofscheme with six months trial & run after handing over the scheme to ujs for its maintenance.1-Bheengi W/S Scheme, Parkandi W/S Scheme & Uthind W/S Scheme of Block Ukhimath
Sl. No. Item Description
1Bheengi W/S Scheme of Block UkhimathSOURCE WORKS
2Construction ofIntake chamber to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
3Construction of RCC Gadhera tapping arrangement i.e., 4m wide Cross wall Boulder Filled Gallery with Intake chamberto fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge.
4Construction of R.C.C cross wall Gadhera tapping arrangment per running meter length excess over 4m gadhera including supply of all materials, labour, T&P etc. complete.
5Survey, design and Constructionof Roughening Filter with filling of supporting & filter media (submitted design should be as pertype design subject to site condition) including all materials, cartage labour, T&P etc. required for proper completion of work
6Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
715 mm dia - GI (M)
820 mm dia - GI (M)
925 mm dia - GI (M)
1032 mm dia - GI (M)
1140 mm dia - GI (M)
12Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper completion of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
1320mm dia
1425mm dia
1532mm dia
1640 mm dia
17Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
18Soil mixed with boulder (SMB)
19Medium Rock (MR)
20Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2120 mm dia
2225mm dia
2332mm dia
2440 mm dia
25Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2620mm dia (CI Air Valve)
27ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
28ConstructingAir Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
29Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E\"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
3012.50KL
3125 KL
32Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
33Supply of all materials,labours ,T&P etc. and construction of Break Pressure Tank
34Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
35Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
36Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
37R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
38R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
39Parkandi W/S Scheme of Block Ukhimath
40SOURCE WORKS
41Construction ofBFG to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
42Constructionof Cross wallincluding all materials, labour, T&P etc. required for proper completion of work
43Constructionof Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
44supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
4515 mm dia - GI (M)
4620 mm dia - GI (M)
4725 mm dia - GI (M)
4832 mm dia - GI (M)
49Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
5020mm dia
5125mm dia
52Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
53Soil mixed with boulder (SMB)
54Medium Rock (MR)
55Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
5620 mm dia
5732mm dia
58Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
5920mm dia (CI Air Valve)
60Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.
61ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
62construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome, MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net,two coat snowcem/distemper/painting including wall writing as per instructions given by E\"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
6310.00 KL
64Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
65Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:
66Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
67Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
68R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
69R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
70Uthind W/S Scheme of Block Ukhimath
71SOURCE WORKS
72Construction ofIntake chamber to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
73Survey, design and Constructionof Roughening Filter with filling of supporting & filter media (submitted design should be as pertype design subject to site condition) including all materials, cartage labour, T&P etc. required for proper completion of work
74Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
7515 mm dia - GI (M)
7620 mm dia - GI (M)
7725 mm dia - GI (M)
7840 mm dia - GI (M)
7950mm dia- GI(M)
80Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper completion of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
8120mm dia
8225mm dia
83Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
84Soil mixed with boulder (SMB)
85Medium Rock (MR)
86Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
8720 mm dia
8825mm dia
8940 mm dia
90Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
9120mm dia (CI Air Valve)
92Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.
93ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
94ConstructingAir Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
95Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E\"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
9610 KL
977.5 KL
98Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
99Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
100Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
101R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
102R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.

AI Tender Summary

OUR REF NO 35923481
AUTHORITY Government Departments
TENDER VALUE 1.87 Crore
LAST DATE 02-02-2023
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Bheengi Parkandi And Uthind Water Supply Scheme Of Block Ukhimath Survey, Design And Construction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing & Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance.1-Bheengi W / S Scheme, Parkandi W / S Scheme & Uthind W / S Scheme Of Block Ukhimath
Basic Detail
Tender No 82/Lekha-05/36 Dated 23.01.2023
Bidding Type Tender
Location
City ukhimath
State Uttarakhand
Key Dates
Publish Date 26 Jan 2023
Submission Date 02 Feb 2023
Open Date 04 Feb 2023
Finance
Tender Value 1.87 Crore
Tender Fee 5900
EMD 3.74 Lakhs
Exemption Not Available
Document List
483b9675-af10-45dd-aed8-91ff75898c73.html
BheengiParkandiUthindTD.pdf
BOQ_66328.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 26, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 02, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 04, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

483b9675-af10-45dd-aed8-91ff75898c73.html

pdf

BheengiParkandiUthindTD.pdf

xls

BOQ_66328.xls

pdf

Tendernotice_1.pdf