Rural Development Government Departments Closing in 0 days TDR #35917734

Tender For Construction Of Bridge Across Deo River Between Fuljhar Village To Sejang Path In Borosaloya Panchayat, Kolebira Block, District Simdega.

Issued by Government Departments · kolebira, Jharkhand
Tender Value
3.36 Crore
Estimated cost
Bid Submission
31 Jan 2023
0 days left
EMD
6.72 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kolebira → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Bridge Across Deo River Between Fuljhar Village To Sejang Path In Borosaloya Panchayat, Kolebira Block, District Simdega.

BOQ

Name of Work: Construction of Bridge across Deo River between Fuljhar village to Sejang path in Borosaloya Panchayat, Kolebira block, district Simdega.
Sl. No. Item Description
1CONSTRUCTION OF BRIDGEExcavation for structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)i) Ordinary Soil (Excavation upto 3.0m depth)
2ii) Ordinary Soil (Excavation 3m to 6m depth)
3i) Ordinary rock (not requiring blasting)
4Hard Rock (blasting prohibited)
5Plain/Reinforced cement concrete (PCC Grade M10) in open foundation complete as per drawing and technical specifications.
6Plain/Reinforced cement concrete (RCC Grade M25) in open foundation complete as per drawing and technical specifications
7Filling Annular Space Around footing in Rock (in PCC M10).
8Supplying, fiiting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.
9Plain/Reinforced cement concrete (RCC Grade M25) in substructure complete as per drawing and technical specifications.
10Supplying, fiiting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specification.
11Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return all with 100 mm dia AC pipe, extending through the full width of the structures with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specifications.
12Providing and laying of filter media with granular materials/tone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
13Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessrories as per drawing and Technical Specifications.
14Furnishing and placing Reinforced/Prestressed cement concrete (RCC Grade M30) in super-structure (for T-beam & slab) as per drawing and Technical Specification.
15Reinforced cement concrete in approach slab including reinforcement and formwork complete as per drawing and Technical specification
16Providing and laying cement concrete wearing coat M-30 grade including reinforcement comlete as per drawing and Techncial Specifications.
17Supplying, fiiting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specification.
18PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specification.
19Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm,complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.)
20Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance to vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space betweenvertical post for expansion, complete as per approved drawings and technical specifications.
21Drainage Spouts complete as per Drawing and Technical Specification.
22Back filling behind abutment, wing wall and return wall (with Sandy Material) complete as per drawing and Technical specification
23CONSTRUCTION OF APPROACH ROADExcavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and corss sections.)
24Construction of Embankment with Material Obtained from Borrow Pits. (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)Rolling with Vibratory roller
25Compacting original ground supporting embankment(Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)
26GranularSub-BasewithGraded Material (Shoulder) with Close Graded Material Gr-I (By Mix in Place Method)Constructionofgranularsub-baseby providingclosegradedMaterial, mixinginamechanicalmixplantat OMC,carriageofmixedMaterialto work site, spreading in uniform layers withmotorgraderonprepared surface and compacting with vibratory powerrollertoachievethedesired density, complete as per clause 401.
27GranularSub-BasewithGraded Material(Carriageway)withClose Graded Material Gr-I (By Mix in Place Method)Constructionofgranularsub-baseby providingclosegradedMaterial, mixinginamechanicalmixplantat OMC,carriageofmixedMaterialto work site, spreading in uniform layers withmotorgraderonprepared surface and compacting with vibratory powerrollertoachievethedesired density, complete as per clause 401.
28Wet Mix Macadam (Plant Mix Method)Providing,laying,spreadingand compactinggradedstoneaggregate to wet mix macadam specification includingpremixingtheMaterialwith water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratoryroller to achieve thedesired density.
29Prime coat over WMM/WBM (Providingandapplyingprimercoat with bituminen emulsionon on the prepared surface of granular Base including clearing of road surface and sprayingprimerattherateof 0.7kg/sqm using mechanical means)
30Tack coat on Bituminus surfaces (Providingand applying tack coat withbitumenemulsiononpressure distributor attherateof0.2kg/sqm onthepreparedsurfaceof bituminous/granularBasecleaned with mechanical broom).(in Two Layers)
31Open graded Premix surfacing (Providing, laying and rolling of open- graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve aswearing course onapreviouslypreparedbase, including mixing in a suitablehot mix plantofappropriatecapcitynotless than 200 tonnes/hour, laying and rollingwithasmoothwheeledroller finished to required level and grades.)
32SealCoat(Providingandlayingof premixsandsealcoatwithHMPof appropriate capacity not less than 200 tonnes/hours using crushed stone chipping6.7mmsizeandpenetration bitumenofsuitablegrade.(Case-II: Type B)
33ReinforcedcementconcreteM15 grade boundary pillars of standard designasperIRC:25-1967,fixedin position including finishing and lettering but excluding painting.(2x2x25 Nos. = 100 Nos.)
34CONSTRUCTION OF RETAINING WALLEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
35PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
36Reinforced cement concrete (RCC Grade M25) in open foundation complete as per drawing and technical specifications.
37Reinforced cement concrete (RCC Grade M25) in substructure complete as per drawing and technical specifications.(Stem)
38Supplying, fiiting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.
39Supplying, fiiting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specification.
40Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return all with 100 mm dia AC pipe, extending through the full width of the structures with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specifications.
41CARRIAGE OF MATERIALSCement,Simdega 50 Km.(P) + 0 Km (K) .
42Steel,Simdega 50 Km.(P) + 0 Km (K) .
43Sand,Local 4 Km.(P) + 1 Km (K) .
44Chips,Birmitrapur 60 Km.(P) + 0 Km (K) .
45Aggregate,Birmitrapur 60 Km.(P) + 0 Km (K) .
46Bitumen ,Bokaro 250 Km.(P) + 0 Km (K) .
47GST @ 18%
48Labour cess @ 1%

AI Tender Summary

OUR REF NO 35917734
AUTHORITY Government Departments
TENDER VALUE 3.36 Crore
LAST DATE 31-01-2023
Authority
Authority Name Rural Development Department
Work Description Construction Of Bridge Across Deo River Between Fuljhar Village To Sejang Path In Borosaloya Panchayat, Kolebira Block, District Simdega.
Basic Detail
Tender No RDD/SD/SIMDEGA/02/2022-23
Bidding Type Tender
Location
City kolebira
State Jharkhand
Key Dates
Publish Date 26 Jan 2023
Submission Date 31 Jan 2023
Open Date 02 Feb 2023
Finance
Tender Value 3.36 Crore
Tender Fee 10000
EMD 6.72 Lakhs
Exemption Not Available
Document List
f24dd7b9-1026-4764-a00d-3fd5dc4ccde9.html
BOQ_88061.xls
TenderDocument.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 26, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 02, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f24dd7b9-1026-4764-a00d-3fd5dc4ccde9.html

xls

BOQ_88061.xls

pdf

TenderDocument.pdf

pdf

Tendernotice_1.pdf

Disclaimer