Bids Are Invited For Elect Eqip 2 Mse Inverted Pendulum Control Trainer Kit , Three Phase Inverter Trainer , Dc Dc Boost Converter , 1 Ph Bridge Module With Igbt Driver , Op-Amp As An Inverting Amplifier , Op-Amp As An Non-Inverting Amplifier , Op-Amp As
Tender Overview
Project Description
Bids Are Invited For Elect Eqip 2 Mse Inverted Pendulum Control Trainer Kit , Three Phase Inverter Trainer , Dc Dc Boost Converter , 1 Ph Bridge Module With Igbt Driver , Op-Amp As An Inverting Amplifier , Op-Amp As An Non-Inverting Amplifier , Op-Amp As An Integrator , Op-Amp As A Differentiator , Overview Of Pid Controller , Lead Lag Compensation Network , Bode Plot Demonstrator Trainer Kit , 3 Ph Induction Motor Drive Vector Control Total Quantity : 12
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Feb-2023 | 18-Feb-2023 | ||
| 2 | 21-Feb-2023 | 28-Feb-2023 | ||
| 3 | 02-Mar-2023 | 06-Mar-2023 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | INVERTED PENDULUM CONTROL TRAINER KIT | As per specification document |
| 2 | THREE PHASE INVERTER TRAINER | As per specification document |
| 3 | DC DC BOOST CONVERTER | As per specification document |
| 4 | 1 PH BRIDGE MODULE WITH IGBT DRIVER | As per specification document |
| 5 | OP-AMP AS AN INVERTING AMPLIFIER | As per specification document |
| 6 | OP-AMP AS AN NON-INVERTING AMPLIFIER | As per specification document |
| 7 | OP-AMP AS AN INTEGRATOR | As per specification document |
| 8 | OP-AMP AS A DIFFERENTIATOR | As per specification document |
| 9 | OVERVIEW OF PID CONTROLLER | As per specification document |
| 10 | LEAD LAG COMPENSATION NETWORK | As per specification document |
| 11 | BODE – PLOT DEMONSTRATOR TRAINER KIT | As per specification document |
| 12 | 3 PH INDUCTION MOTOR DRIVE VECTOR CONTROL | As per specification document |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed