}

Tender For Dismantling The Existing De System - 2 Inoperative Equipments Viz Blower, Blower Motor, Flow Control & Suction Control Dampers Flow Control Valve, Etc, And Servicing The Inoperative Equipments Fabrication And Erection Of Damaged Structures, Sup, Thiruvallur-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Dismantling The Existing De System - 2 Inoperative Equipments Viz Blower, Blower Motor, Flow Control & Suction Control Dampers Flow Control Valve, Etc, And Servicing The Inoperative Equipments Fabrication And Erection Of Damaged Structures, Sup. Submission Date for this Tender is 31-01-2023. Blowers Tenders in Thiruvallur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

35901774
Tender For Dismantling The Existing De System - 2 Inoperative Equipments Viz Blower, Blower Motor, Flow Control & Suction Control Dampers Flow Control Valve, Etc, And Servicing The Inoperative Equipments Fabrication And Erection Of Damaged Structures, Sup
Open Tender
Indian
Tamil Nadu
Thiruvallur
31-01-2023

Tender Details

Dismantling The Existing De System - 2 Inoperative Equipments Viz Blower, Blower Motor, Flow Control & Suction Control Dampers Flow Control Valve, Etc, And Servicing The Inoperative Equipments Fabrication And Erection Of Damaged Structures, Supply Erection And Commissioning Of Sequential Timer Circuit Panel & Accessories, Erection Of Compressed Air Line Of Dust Extraction System Of Bunker 1F & 1G Of Unit-I.

Key Value

Document Fees
Refer document
EMD
INR 33900.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: NCTPS-II – M-II Circle – CHP&FP Division – Project sub division – Unit-I – Dismantling the existing DE system - 2 inoperative equipments viz blower, blower motor, flow control & suction control dampers flow control valve, etc, and servicing the inoperative equipments fabrication and erection of damaged structures, supply erection and commissioning of sequential timer circuit panel & accessories, erection of compressed air line of dust extraction system of bunker 1F & 1G of Unit-I.
Sl. No. Item Description
1Material supply Portion:
2Bag Filters with bagretaining cages
3Solenoid valve & diaphragam valves with other accessories like Rubber beading, Rubber hose
4Rubber Bellow 650 dia.
5supply, Installation , testing and commissioning of Sequential timer board for Dust extraction system.
6150 NB CS Seamless Pipe
7Labour Portion:
8Charges for overhauling thecentrifugal fan, strengthening the base frame with required Materials and servicing the fan - Dismantling the flexible connections at suction & discharge of the fan - loosening the fixing bolt and taken out the fan impeller assembly – loosening the foundation bolt & nuts and removing the worn out base frame from the foundation- including cost of consumables , hire charges and T&P’s and transportation
9Dismantling the belt pulley using pullers-Dismantling the suction and housing dismantling the top cover and removing the worn out bearings - removing the fan with shaft complete cleaning and inspection - patch up welding the eroded portioning suction cone , fan housing , fan frame and grinding the eroded surface .including cost of consumables and T&Ps.
10Assembling the fan: assembling the shaft with fan in the with new bearings reassembling the fan housing and suction cone with new bolt nut and gasket– painting the fan - including cost of bolt nut & gaskets, paints andincluding cost of consumables , hire charges and T&P’s
11Charge for Providing new ‘V’ belts - aligning the motor with fan and tightening - applying grease in wherever required- including cost of ‘V’ belts, grease andincluding cost of consumables , hire charges and T&P’s
12Fabrication and fixing of new belt guard & motor hood and fixing - servicing the fan with no load and then with load - including cost of materials, consumables and hire charges for T&P’s etc.
13Inspection of all dust pipe lines , dismantling andcomplete cleaning the inner portion of the dust extraction pipe lines, removal of collected dust from the pipe line and then assemble in its positions including cost of consumables , hire charges and T&P’s
14Complete overhauling of DE System. Work involves opening of all the inspection doors, hoppers and top casing covers, inspection and checking the tightness of filter bag bottom, cage, cleaning the contamination fauling, inspection and cleaning , checking the seals in clean gas casings coverschamber. fixingof compressed air line pipes and fitting by threading, applying sealing compound and connect to integral diaphragam valve asslyincluding cost of consumableslike differential Pressure gauge and T&P’s hire charges.
15Charges for fixing new bag filter with cages, ventury nozzles ,Servicing the dampers, air nozzles, RAV motor,electrical controls , incoming panelsand other jammed internals including cost of consumables like gaskets, seals , solid state timer, hire charges and T&P’s
16Charges for dismantling the existing damaged / Worn out structure as directed by Engineer incharge including trasportation and devolution the scrap to stores.
17Charges for leading , lifting and transportation of iron and steel materials from "o" mtr to DE system at 70 mtr elevation(Structural material will be supplied by TANGEDCO at free of cost)
18Fabrication and erection of walk way for Dust Extraction system at 70 Mtr elevationfrom Right side Unit 1 Boiler floor to DE system including cost of consumables and T& P s (Structural material will be supplied by TANGEDCO at free of cost)
19Fabrication and erection of Dust Extraction system outlet 150NB Pipe line fromDE system to bunker above 60 mtr elevation : This work involves lifting, Positioning ,alighning , welding , leak testing , painting of 1 coat of zinc primer and 2 coat of enamel paint ,testing and commisioning of system. ( 150 NB CS seamless pipe will be suppled by contractor)Including cost of consumables and T&Ps etc.,
20Installation of Dust Extraction system Air receiver tank ( capacity 100 Litre)at 70 Mtr elevation: This work involves leading , lifting and postioning of air receiver tank @ 70 mtr elevation and welding of connected pipe lines ,etc., including cost of consumables and T& P s ( Air receiver tank will be supplied by TANGEDCO)
21Charges for Erection of 40 Nb GI pipe line from ground level to 70 Mtr elevation :This work involves Marking, cutting the pipes to the required length ,leading andlifting the pipes to the work spot and erection of 40 NB GI Pipes from Compressor room to DE system at 70 Mtr elevation , Including cost of transportation ,painting of red oxide paint,cost of consumables and T@Ps ,hire charges, etc.,( Required 40 Nb pipe will be supplied by TANGEDCO ree of cost)
22Charges for cleaning & painting of DE system and their structures, stairs / ladders. Each one coat of red oxide primerand two coats of Epoxy paintincluding paint material cost ,cost of consumables , hire charges and T&P’s .
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail