| 1 | Earthwork in excavation of foundation trenchs in all sorts of soil , including removing spreading or stacking the spoils within a lead of 75 m.Depth of excavation not exceding 1.5 m. |
| 2 | Sand filling in foundation with fine river sand and labuor for spreading and compacting sand to required thickness in layers not exceeding 150 mm to proper gradient and camber , saturation with water ramming complete in/c the cost of supply of sand complete.. |
| 3 | Supplying & laying of polythine sheet ( 150gm / sqm) over damp proof course or below flooringin foundation or in foundation trenches. |
| 4 | Ordinary Cement Concrete (1:2:4) with graded stone chips (20 mm size) in bed to proper camber and grade over sand filling excluding shuttering. |
| 5 | Reinforcement Cement Concrete M-20 (1:1.5:3) with graded stone chips (20 mm size) excluding shuttering and reinforcement at ground floor. |
| 6 | (a) Hire and labour charges for shuttering with cencering and necessry staging upto 4 m using approved stout props of slab, beams, columns, lintels curved or straight in/c fixing and after completion of works. |
| 7 | (a) Hire and labour charges for shuttering (b) 25mm to 30mm shuttering without staging in fdn. |
| 8 | Brick work with First Class Brick set in cement sand mortar (prop 1:6) including Raking out joints, curing , scaffolding etc. complete including cost and carriage of all materials. In Foundation. |
| 9 | Brick work with First Class Brick set in cement sand mortar (prop 1:4) including Raking out joints, curing , scaffolding etc. complete including cost and carriage of all materials. In Superstructure. |
| 10 | 5\" th. Brick work with 1 st. Class bricks in cement morter (4:1)a) in ground floor. |
| 11 | 15 mm. th plastering (to wall, floor, ceiling etc.) with sand and cement morter (prop 1:6 ) including rounding off or chamfereing corners including throating, nosing, and drip course where necessary at ground floor. |
| 12 | Plaster (in wal, floor etc) with sand and and cement morter in/c rounding off or chamfering corners (i) (ii) With 1:4 cement mortar (a) 15 mm thick plaster |
| 13 | Neat cement punning about 3.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per 100 sq.m. |
| 14 | Reinforcement for reinforced concrete work in all sorts of structures in/c distribution bars, stirrups, binders etc. in/c supply of rods, cutting to requisite length, hooking and bendingto correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete. |
| 15 | Supplying, fitting & fixing 1st quality Ceramic tiles infloors to match with the existing work including roughening of concrete surface, if necessary.B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. b) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. Floor |
| 16 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls to match with the existing work including roughening of concrete surface, if necessary.B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. b) Area of each tile above 0.09 Sq.m (i) Coloured decorative.Wall |
| 17 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls to match with the existing work including roughening of concrete surface, if necessary.B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. b) Area of each tile above 0.09 Sq.m (i) White |
| 18 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.PVC Pipes (Dia)-15 mm |
| 19 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.PVC Pipes (Dia)-32 mm |
| 20 | Supplying, fitting & fixing push cock of heavy quality Cast iron with brass spindle 15 mm. |
| 21 | Soak Pit & others unforseen work. (L.S) |
| 22 | Writing the Display Board (Marble) 0.600 m X 0.600 m. sizein/c all complete with photo. |
| 23 | Add 9.00% SGST of Total Cost |
| 24 | Add 9.00% CGST of Total Cost |
| 25 | Add 1.00% for Lab. Welfare Cess |
| 26 | Add contingency |