Tender For Upgradation Of Valayamanpuram - Pandidhacholanallur Road Km. 0/0-1/200
Tender Value
1.37 Crore
Estimated cost
Bid Submission
31 Jan 2023
0 days left
EMD
79000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvarur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Upgradation Of Valayamanpuram - Pandidhacholanallur Road Km. 0/0-1/200
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Jan-2023 | Date | Date | 31-Jan-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Picking the existing BT surface, leveling and sectioning in accordance with specifications and as directed by the Engineer. as per MORT & H 111, 112, 202, 303.4.3, 501 |
| 2 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for box cutting for widening portion as per MORTH Vth Rev., 111, 112 & 201 |
| 3 | Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth Revision 111, 112, 401, 900 |
| 4 | Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading III of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth Revision 111, 112, 401, 900 |
| 5 | Providing and laying, spreading and compacting graded stone aggregate Wet mix macadam specification including pre-mixing the material with water at OMC in base mix plant (Pugmill) carriage of mixed material by tipper to site and layingin uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as perMORT&H Vth Revision 111, 112, 406, 900 |
| 6 | Providing and laying of Prime coat usingEmulsion bitumen (SS1) at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900 |
| 7 | Providing and laying of tack coat using Emulsion bitumen (RS1 ) at the rate of 2.50 Kg./ 10 Sqm. over the Primed surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900 |
| 8 | Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk (VG 30) bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as perMORTHVth Revision 111, 112, 501, 504,900 |
| 9 | Providing and laying 30 mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen (VG 30) as per MORT & H Vth Revision 111, 112, 501 507 900 |
| 10 | Collection and supply of carted earth includingexcavation,removalandsatisfactorydisposalofallmaterialsnecessaryfortheconstructionofroad wayinaccordancewiththespecificationsandthelines,gradesandcrosssectionshownin thedrawings orasdirectedbytheEngineer for making up low berms as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900 |
| 11 | Providing R.C.C M15 grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete as per MORT&H Vth Revision No.804 |
| 12 | Providing R.C.C M15 grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete as per MORT&H Vth Revision No.804 |
| 13 | CONSTRUCTION OF BOX CULVERT |
| 14 | Dismantlingthe existing RRmasonry salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.,complete as per MORTH Vth Revision111,112,202 |
| 15 | Dismantlingthe existing Plain Cement Concrete Structure and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. or as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202 |
| 16 | Earthworkexcavationinall classesofsoilsexcepthardrockrequiringblastinganddepositingonbankwithallleads andliftsas perSS 20 Bincludingcostofalllabourmaterials,toolsequipmentsandall incidentalcharges such as bailing out water, sheeting,shoringandbracingandtheirsubsequentremovalofalllogs,stumpsandotherdeleteriousmatter andobstructions,trimmingofbottom ofexcavationback filling,clearingupthe siteanddisposalofallsurplusmaterialsetc.,completeasperstandardspecification for FOUNDATION as per MORTH Vth Revision 304. |
| 17 | PlaincementconcreteM15 Grade (Nominal mix) using40mmISSHBGmetalincludingcostandconveyanceofallmaterialsto site, includingcostandlabourchargesforformworkandcentering, labourcharges,compacting,curingandallincidentalchargesetc., completeforLEVELLING COURSE BELOW FOUNDATION as per MORTH Vth Revision1000, 1500, 1700, 2100. |
| 18 | VibratedcementconcreteM20 Grade (Nominal mix ) using40mmISSHBGmetalincludingcostandconveyanceofallmaterialsto site, includingcostandlabourchargesforformworkandcentering, labourcharges,compacting,curingandallincidentalchargesetc., completefor FOUNDATION FOR RETURN WALL (BELOW SILL LEVEL) as per MORTH Vth Revision1000, 1500, 1700, 2100. |
| 19 | Vibrated Reinforced Cement Concrete M25 (Design mix) using20mm and 12mm ISS HBG graded metalincludingcostandconveyanceofallmaterialsto work site,, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BOX CULVERT, BASE SLAB, SIDE WALL & TOP SLABas per MORTH Vth Revision 1000, 1500, 1700, 2100. |
| 20 | VibratedcementconcreteM20 Grade (Nominal mix) using40mmISSHBGmetalincludingcostandconveyanceofallmaterialsto site, includingcostandlabourchargesforformworkandcentering, labourcharges,compacting,curingandallincidentalchargesetc., completefor RETURN WALL (ABOVE SILL LEVEL) as per MORTH Vth Revision1000, 1500, 1700, 2100. |
| 21 | VibratedcementconcreteM15 Grade (Nominal mix) using40mmISSHBGmetalincludingcostandconveyanceofallmaterialsto site, includingcostandlabourchargesforformworkandcentering, labourcharges,compacting,curingandallincidentalchargesetc., completefor PARAPET as per MORTH Vth Revision1000, 1500, 1700, 2100. |
| 22 | Supply and fabrication of steel gradeFe-500required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills,hoisting and placing the reinforcement in positionas specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per standard specificationas per MORTH Vth Revision 1000, 1600. |
| 23 | Vibrated CementConcreteM30(Design mix) with surface reinforcement using 20mm, 12mmand 6mm ISS HBG graded metalincludingcostandconveyanceofallmaterialsto work site, butincludingcostandlabourchargesfor formwork cost of premoulded expansion joint and fixing the same in position andcenteringlabourchargesforcompacting, curing,including allincidentalchargesetc.,complete for wearing coat of 75mm uniform thickness over deck slab as per MORT&H Vth Revision1500, 1600, 1700, 2702.2 |
| 24 | Fillingthe trenchwith Gravel including cost and conveyance of material to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for Box culvert, Side wall as per MORTH V Revision 304 |
| 25 | Providing and fixing 100mm dia PVC SEEPAGE PIPESofrequiredlengthforabutmentandreturns includingcostandconveyanceofallmaterialstoworksite,costandlabourforsemispericalbackfillarrangementswith100mmsizebrokengranitestonesattheperipheryandlabourchargesforfixingetc.,todrain of the backfill as per MORTH V2706 |
| 26 | Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification for Diversion Road as per MORT&H Vth Revision 111, 112, 401, 900 |
| 27 | Collection and supply of carted earth with anincludingexcavation,removalandsatisfactorydisposalofallmaterialsnecessaryfortheconstructionofroad wayinaccordancewiththespecificationsandthelines,gradesandcrosssectionshownin thedrawings orasdirectedbytheEngineer for diversion road as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900 |
| 28 | Calculation of SubTotal, GST and Total carried out by system automatically |
| 29 | Sub Total Amount for above all items (excluding GST) |
| 30 | GST 18% for above SubTotal Amount |
| 31 | Total in Figures (SubTotal + GST) |
AI Tender Summary
Tender Timeline
Jan 30, 2023
11:30 IST
Tender Published
Tender notice published.
Completed
Jan 31, 2023
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedJan 31, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 01, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender