Tender For Consultancy Services Authoritys Engineer For Supervision Of Rehabilitation And Upgradation Of Kurwai-Mungaoli Chanderi Road Section Of Nh-346 Total Leangth 81.300 Km In The State Of Madhya Pradesh On Epc Basis Total Leangth 81.300 Km
Tender Overview
Project Description
Consultancy Services Authoritys Engineer For Supervision Of Rehabilitation And Upgradation Of Kurwai-Mungaoli Chanderi Road Section Of Nh-346 Total Leangth 81.300 Km In The State Of Madhya Pradesh On Epc Basis Total Leangth 81.300 Km
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Feb-2023 | BOQ CHANGED | Other | 06-Mar-2023 |
| 2 | 03-Mar-2023 | Date Corrigendum | Date | 15-Mar-2023 |
| 3 | 07-Mar-2023 | BOQ CHANGED DUE TO ADMIN REASON | Other | 15-Mar-2023 |
| 4 | 15-Mar-2023 | DATE AMENDMENT | Date | 31-Mar-2023 |
| 5 | 20-Mar-2023 | RFP CHANGED | Other | 31-Mar-2023 |
| 6 | 20-Mar-2023 | NEW BOQ CHANGED | Other | 31-Mar-2023 |
| 7 | 22-Mar-2023 | MODIFIED BOQ CHANGED | Other | 31-Mar-2023 |
| 8 | 28-Mar-2023 | tender fee amendment | Fee | 31-Mar-2023 |
| 9 | 29-Mar-2023 | KEY DATES CORRIGENDUM | Date | 06-Apr-2023 |
| 10 | 06-Apr-2023 | dated revised | Date | 24-Apr-2023 |
| 11 | 12-Apr-2023 | TENDER PAC CHANGED | Financial Bid | 24-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Remuneration for LocalStaff (iclusive ofper diem allowance) |
| 2 | Team Leader cum Senior Bridge Engineer |
| 3 | Resident cum Highway Engineer (1 nos) |
| 4 | Bridge/StructuralEngineer |
| 5 | Senior Quantity Surveyor |
| 6 | Senior Quality cum Material Expert |
| 7 | Road Safety Expert |
| 8 | Support Staff |
| 9 | Office Manager |
| 10 | Accountant cum Cashier |
| 11 | Steno cum Computer Operator |
| 12 | Office Boy ( 1 no) |
| 13 | Transportation (Fixed rate on rental basis) |
| 14 | Innova Crysta or equivalent (not more than 1 years old) (02 nos. * 24= 48) [during Construction period ] |
| 15 | Swift desire/indica/Boleroor equivalent (not more than 1 years old)(4 nos. * 24 =96) |
| 16 | Duty Travel to Site (Fixed Costs) (For all Lengths of projects) :Professional and Sub-Professional Staff |
| 17 | Duty Travel to Site (Fixed Costs |
| 18 | Duty Travel to Site (Fixed Costs |
| 19 | Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented. |
| 20 | Office Rent (Fixed Costs) |
| 21 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 22 | Office Supplies |
| 23 | Drafting Supplies |
| 24 | Computer Running Costs |
| 25 | Domestic and International Communication |
| 26 | Office Furniture and Equipment (Rental) |
| 27 | Office Furniture and Equipment |
| 28 | Reports and Document Printing |
| 29 | Monthly Report (Design and Construction) (03 Copies per Report |
| 30 | Half yearly Reports (03 Copies per Report |
| 31 | Various others reports as provided in the Concession Agreement such as Completion Report |
| 32 | Road Survey Equipment |
| 33 | Surface defects detection and roughness Measurement using Network Survey Vehicle |
| 34 | Pavement strength measurement using FWD |
| 35 | Bridge inspection using Mobile Bridge Inspection Unit |
| 36 | Road signs inspection using Retro Reflectometer |
| 37 | Contingencies |
| 38 | A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Ministry of Road Transport & Highways, Bhopal. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender