Tender For Construction Of Pcc Road (850 M) And Guard Wall (110 M) From Vill -Beterkiya,Tola Mundasai To Burusai ,G.P-Dudbila,Block -Noamundi.
Tender Overview
Project Description
Construction Of Pcc Road ( 850 M ) And Guard Wall ( 110 M ) From Vill -Beterkiya, Tola Mundasai To Burusai , G.P-Dudbila, Block -Noamundi.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Jan-2023 | DATE CORRIGENDUM | Date | 04-Feb-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery ofthe area as per Technical Specification Clause 201. |
| 2 | Clearining and Grubbing Road Land (Clearining and grubbing road land inclluding uprooting rank vegetation grass bushes, shurbs, spaling and trees of girth up to 300 mm removal of stumps of such tree cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned up to a lead of 1000 m includding top organic soil not exceeding 150 mm in thicknees) |
| 3 | Compacing Original ground Supporing Subgrade (Loosening of the ground upto a level of 500 mm below the Subgrade level, watered graded and compected in layers tomeet requirement of tables300.2 for subgread construction as per Technical SpecificationS.O.R. Item No. 3.20 Case I |
| 4 | Constructionofsubgradeandearthenshoulderswithapproved material obtained from borrow pits with all lifts and leads, transportingtosite,spreading,gradingtorequiredslopeand compacted to meet requirement of Table 300.2 with 1000M Lead as per Technical Specification Clause 303.1S.O.R. Item No. 3.18 |
| 5 | Constructionofgranularsub-basebyprovidingwellgraded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,andcompactingwithsmoothwheelrollertoachievethe desired density, complete as per Technical Specification Clause 401.With Grading-III MaterialS.O.R. Item No. 4.01 B (iii) |
| 6 | Cement Concret Pavment (Constructionof un-reinforced,doweljointedatexpansionand construction jointonly,plaincementconcretepavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 400 kg per cum,coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in abatching mixerusing approved mixdesign,laid in approved fixedside formwork ,Transporting to site laid with a fixed from or ..............approved curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification) S.O.R. Item No. 6.02 |
| 7 | GUARDWALLEarthwork in excavation of Foundation of structuers as per drawing and technical specifications Clause 305.1 includding setting out costruction of shoring and hardingremovale of stumps and other delerious material and disposal uoto a lead of 50 m. do…do..allS.O.R Item No 3.13.(I) A |
| 8 | Plain Reinforced cement concrete in open foundation complete as per Drawing and Technical SpecificationP.C.C Grade M-15 SOR Item No -12.8A |
| 9 | Stone masonry work in Cement Mortar 1:3 Foundation complete as per Drawing and Technical specificationRandom Rubble Stone Masonary in C.M (1:3) in Foundation SOR Item No -12.7B |
| 10 | Stone masonry work in Cement Mortar 1:3 Super structure complete as per Drawing and Technical specificationRandom Rubble Stone Masonary in C.M (1:3) in Super structure SOR Item No -13.4A |
| 11 | Plain Reinforced cement concrete on top of wall complete as per Drawing and Technical SpecificationP.C.C Grade M-15 SOR Item No -13.5A(P) |
| 12 | Providing Weep hole in brick masanory /plain/ reinforcement concreteabutment wing wall return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1V : 20 H towards drawing face .Complete as per drawing and technical Specification. SOR Item No -13.8 |
| 13 | Pointing with cement mortar (1:3) on Brick or Stone work substructure as per technical specification .SOR Item No -13.2 |
| 14 | G.S.T @ 18% |
| 15 | Labour Cess 1% |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender