Housing Urban and Rular Development Government Departments Closing in 0 days TDR #35819224

Tender For Development Of Smart Roads And Underground Ducting Including Utility Shifting Of Water Supply And Power Lines In Abd Area Under Smart City Mission Corporation Roads In Thiruvananthapuram Pumping Station Road Road Id 45

Issued by Government Departments · thiruvananthapuram, Kerala
Tender Value
4.97 Crore
Estimated cost
Bid Submission
31 Jan 2023
0 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
8850
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
thiruvananthapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Development Of Smart Roads And Underground Ducting Including Utility Shifting Of Water Supply And Power Lines In Abd Area Under Smart City Mission Corporation Roads In Thiruvananthapuram Pumping Station Road Road Id 45

BOQ

Name of Work:Development of Smart Roads and Underground ducting including Utility shifting of Water Supply and Power lines in ABD Area under Smart City Missions - Corporation Roads -Balance work- Package 1 -ID 44
Sl. No. Item Description
11. STORM WATER DRAINS (MORTH)
2Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
4Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - In cement mortar
5Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in lime mortar
6Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
7Based on MORTH Item No.2.4.2.A - Extra for additional lead of every 1 Km part thereof for disposal of dismantled waste material by mechanical transport to approved municipal waste dumping yard,as per the direction of Engineer In-charge
8Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
9Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
10Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
11Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 - Using Concrete Mixer
12Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13STORM WATER DRAINS (DSR)
14Taking out of existing drain slab and stacking within 1000m lead including all labour charges and miscellaneous expenses etc complete
15Providing, hoisting and fixing up to floor level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size)
16Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 25 mm pipe 10kgf /cm2
17Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2
18Providing and laying cement concrete 1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) up to haunches of S.W. pipes including bed concrete as per standard design:100 mm diameter S.W. pipe
19Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 100 to 250 mm diameter
20Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately :Rectangular manhole 120x90 cm with circular cover 560 mm dia of grade HD - 20
21Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap.
22Providing and fixing DI grating of size 450mm x 200mm for road gully chamber having minimum 25Kg weight (Heavy Duty) etc. complete as per design & drawings.
233. UNDERGROUND DUCTING OF UTILITIES (MORTH)
24Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
25Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
26Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
27Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump
28Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Cable Duct Across the Road - Triple rRow for three utility services
30Providing of 7- Way 40mm Multi Ducts with solid permanently solidly lubricated Silicore in inner layer for ICT fibre cables comforming to ASTMF 2160, ASTM D 2444 and /or equivalent indian standard. External Sheath shall be in Orange Color and shall be free from visual defects like blisters, shrink holes, flaking, scratches, groove lines & surface roughness. The outer layer colour of the 7 nos. PLB HDPE ducts shall be Green, blue, yellow, Brown, violet, Grey , Red for differentiation, middle layer shall be transluscent and the inner layer shall be having permanently lubricated lining of Silicore . Outer sheath thickness shall be 1.2mm 0.2mm. The inner surface of the multi channel ducts shall be straight ribbed & shall be of a configuration for faster installation of cables. Wall thickness(mm) of each of the ducts Excluding rib height shall be 2.9mm 0.3mm. Seven couplers every 100 meter for duct jointing shall be provided. The coupler shall be used to join two HDPE pipes. It should either snap fit or Split type. The jointing shall meet the air pressure test of 15 Kg/cm2 for a minimum period of 2 hours. 14 End Plugs every 100 meters of pipe length shall be provided. End Plugs shall be used to seal the end of ducts so as to prevent any ingress of water/dirt etc. testing and commissioning. The rate is inclusive of required specials and fittings wherever necessary. ISO Requirements- ISO 9001, 14001, 18001 as per design drawing technical specifications and directions of Engineer in charge
31UNDERGROUND DUCTING OF UTILITIES (DSR)
32Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
33Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
34Constructing soak pit 1.20x1.20 m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design
35Based on D.S.R-19.19.4.1-Supplying and fixing SFRC Circular shape 560 mm dia precast R.C.C. manhole cover(Extra Heavy Duty) with frame - EHD - 35 to existing manhole cover slab including necessary fixing charges labour etc. complete.
36ROAD AND JUNCTION IMPROVEMENT
37Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
38Based on MORTH Item No.2.4.2.A - Extra for additional lead of every 1 Km part thereof for disposal of dismantled waste material by mechanical transport to approved municipal waste dumping yard,as per the direction of Engineer In-charge
39Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
40Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
41Dense Graded Bituminous Macadam : - For grading - II (26.5 mm nominal size) Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
42Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading -II (13.2 mm Nominal size).
43Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
44Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
45Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately.
46FOOTPATH
47Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
48Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
49Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand):Medium shade pigment 50% white cement, 50 % ordinary cement
50Providing and laying tactile tile (for vision impaired persons as per standards) of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-inCharge.
51Providing, hoisting and fixing up to floor level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size)
52Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-inCharge.
53Supplying and fixing of MS Powder Coated chain in between bollards including fixing in position etc. complete.
54Providing and fixing MS Powder Coated, 750mm height, 100mm dia, thickness 3mm bollards as per drawing including fixing with a MS base plate of size 150x150x6mm.Edge shall be smoothened as directed by Engineer in charge. All MS components are in MS Powder Coated finish, made using modern, automatic machines like CNC machine, robotic welding, laser cutting, water jets etc. The rate shall includes cost and conveyance of all materials, base plate ,screws ,bolts , fabrication, transportation, cutting and making good the floors, loading and unloading, handling of machineries all electrical charges etc. labor charges, lead, lift etc. complete as directed by Engineer-in-Charge.
55WAY FINDING AND SIGNAGES
56Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
57Dismantling of existing signages in footpath/median including excavation and dismantling of foundation concrete, disposal with all lifts and up to a lead of 1000 meters and staking the materials.
58Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
59Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control Over 10 cm in width
60Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
61Providing and fixing reflective road studs (Raised Pavement Marker) of \" category A\" made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :
62Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
63Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm circular
64Flexible Hazard Marker 30cm x 30cm Hazard Marking on the surface of trees,concrete,Masonry etc using Aluminium backed flexible presmatic (AFP) SHEETING CONSISTING OF Yellow colored flexible presmatic sheeting non-metallic presmatic lens as recto reflective elements and conforming to ASTM D 4956-09 Type IV specification values for reboundable sheetig with printed arrow /Slant line pattern in black colour. AFP sheeting laminated at the back with a 50 micron thick Aluminium (AI) foil with pressure sensitive adhesive and liner and shall not crack when tested for flexibility as per section S2.2.2 of ASTM D 4956-09 including application on any surface with adhesive as recommended by manufacturer and ceiling the edges all around with epoxy based structural adhesive to resist any peel-off.
65CONDUIT DUCTING (DSR ELE)
66Supplying and laying of following size owe HDPE pipe .lSI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.63 mm· dia (OD-63 mm & ID-51 mm nominal)
67Supplying and laying of following size owe HDPE pipe .lSI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.120 mm dia (OD-120 mm & ID-103 mm nominal)
68ADDITIONAL ITEM
69Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
70Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
71Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
72Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
73Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Delete Add Specification Below
74Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
75Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
76Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm.
77UTILITY SHIFTING ESTIMATE OF KWA WATER SUPPLY LINE
78Supply of PVC Pipe, 8kg/cm2, 90mm Dia conforming to IS 4985:2000 Including all Specials.(KWA Data-100.98.223)
79Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).90 mm nominal outer dia pipes.\"
80Supply of PVC Pipe, 8kg/cm2, 110mm Dia Including all specials, conforming to IS 4985:2000.(KWA Data-100.98.224)
81Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).110 mm nominal outer dia pipes.(From KWA Data-100.9.11)
82Supply of PVC Pipe, 6kg/cm2, 160mm Dia Including all specials, conforming to IS 4985:2000.(KWA DSR-100.98.216)
83Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).160 mm nominal outer dia pipes.(From KWA Data-100.9.11)
84Boring RCC slab above 8cm and upto 10cm thick for providing pipes or fittings of size 80 to 100mm and rectifying slab with cement concrete 1:2:4 using 20mm broken stone and finishing the top and bottom with cement mortar after placing the pipe or fittings.
NEW DATA (Prepared based on
PHED SDB Vol II - Item No.1063)(As per KWA Data 100.41.26)
85Inter connection with existing DI K9/CI/GI/PVC to newly laid lines including dismantling existing lines,cost of necessary fittings required for interconnection work,all labour charges etc complete.(As per data from KWA).
86Inter connection to the branch lines from newly laid PVC main lines
87Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.(KWA Data-100.98.457)
88\"Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber etc. excluding the cost of valve (the tail pieces if required will be paid separately) :80 mm diameter. Class I\"Observed Data derived from item no.18.31.of DAR(KWA Data-100.31.1.1)
89Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.6, Size 100mm.(As per KWA Data-100.98.482).
90Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber etc. excluding the cost of valve (the tail pieces if required will be paid separately) :100 mm diameter. Class I
Data derived from item no.18.31.1.1of DAR(As per KWA Data-100.31.1.2)
91Supply of 560mm dia CI MH cover with frame.(Data as per KWA)
92Fabricating MS flanges of diameter 100 mm using 12 mm thick MS plate including cost and conveyance charges of MS plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under coat of primer etc. complete: For pipes fabricated with 8mm thick MS plates.(Data as per KWA Data-100.37.5.2)
93Fabricating MS pipes of size 100mm (ID) using 8 mm thick MS plate including cost and conveyance charges of MS plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under coat of primer etc. complete: For pipes fabricated with 8mm thick MS plates.(as per KWA Data-100.37.5.1).
94Supply of Solid block of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979.
95Engaging Coolie for Controlling Valves (From KWA Data-100.98.1008)
96Engaging Assistant Fitter or 2nd Class fitter(As per KWA Data-100.98.1010).
97Engaging Fitter ( grade 1) for giving Interconnection and Rectification of leak during Works (From KWA Data-100.98.1009)
98Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
20 mm nominal outer dia pipes.(As per KWA Data-100.9.1)
99Providing New/Alteration of house connection from the existing main including earth work excavation,supplying and fitting suitable saddle piece,supplying and fitting 20 mm brass ferrule1 no,20 mm GM full way wheel valve 1no,bend 1no union 1no etc. and connecting the newly laid main,testing the joints etc complete but excluding cost of pipe.(Data as per the data from KWA).
100Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.(KWA Data-100.51.3).
101od250528/2019_2020Supply and Conveying 20mm ASTM Pipe, conforming to IS 4985:2000(Rate as per date from KWA).
102PART B-ADDITIONAL ITEMS-WATER SUPPLY LINES
103Excavating trenches of required width for pipes, cables, etc includingexcavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and thenreturning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. and disposing of surplus excavated soil as directed, within a leadof 50 m :All kinds of soilPipes, cables etc. exceeding 80 mm dia. but notexceeding 300 mm diaDSR 2.10.1.2
104Bailing out water with 5 HP engine and pumpset including conveyance to the site, errection, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc. complete.NEW DATA (Prepared based on PHED SDB - Item No.1070
105Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.100.59.1
106Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road15.43.2
107OPERATION AND MAINTENANCE
108Maintenance charges of road work and other components except land scaping per month for fourth year
109Maintenance charges of road work and other components except land scaping per month for fifth year

AI Tender Summary

OUR REF NO 35819224
AUTHORITY Government Departments
TENDER VALUE 4.97 Crore
LAST DATE 31-01-2023
Authority
Authority Name Smart City Thiruvananthapuram Limited
Work Description Development Of Smart Roads And Underground Ducting Including Utility Shifting Of Water Supply And Power Lines In Abd Area Under Smart City Mission Corporation Roads In Thiruvananthapuram Pumping Station Road Road Id 45
Basic Detail
Tender No SCTL/PRJ/210/2019/M(PMM)/RFP12
Bidding Type Tender
Location
City thiruvananthapuram
State Kerala
Key Dates
Publish Date 19 Jan 2023
Submission Date 31 Jan 2023
Open Date 01 Feb 2023
Finance
Tender Value 4.97 Crore
Tender Fee 8850
EMD 1 Lakhs
Exemption Not Available
Document List
eac5a697-7164-4f45-915b-12ff74d192d0.html
BOQ_808245.xls
MakeList.pdf
OM.pdf
RFP.pdf
RoadDetails.pdf
SpecsCivil.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 19, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 01, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

eac5a697-7164-4f45-915b-12ff74d192d0.html

xls

BOQ_808245.xls

pdf

MakeList.pdf

pdf

OM.pdf

pdf

RFP.pdf

pdf

RoadDetails.pdf

pdf

SpecsCivil.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders