| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement and depositing the debries crear from work site etc complete as per the direction of Engineer in charge. |
| 2 | Excavation , loading , unloading and carriage by mechanical means of all kinds of soil including stoney earth , gravel and moorum etc. interspread with boulders upto 1/2 cum size with all lifts and delifts in reservoir bed including trimming of slopes and bed to design selection and depositing the excavated materialaway from work site as per the specification and as directed by theEngineer -in -Charge with all lead and lift from the place of excavation etc complete. (Disposal of earth) (Measurement to be taken on finished level section) |
| 3 | Excavation , loading , unloading and carriage by mechanical means of all kinds of soil including stoney earth , gravel and moorum etc. interspread with boulders upto 1/2 cum size with all lifts and delifts in reservoir bedincluding trimming of slopes and bed to design selection and depositing the excavated materialover the dam embankment to proper level and slopeas per the specification and as directed by theEngineer -in -Charge with all leads and lifts from the place of excavation etc complete. (To be utilised in earthdam) (Measurement to be taken on finished level section) |
| 4 | Ramming or rolling earth work with light H.R.R. in embankment in layers not exceeding 0.30m etc complete as directed by Engineer - in -charge. |
| 5 | Collecting, supplying and stacking moorum at work site and conveying from stacks and spreading moorum and consolidation with H.R.R including watering cost and conveyanceofmoorum with all leads, lifts, delifts including cost, conveyance, royalty and all other taxes of all materials, labour, machineries and hire charges of materials required for the work etc complete as directed by the EIC. |
| 6 | Providing stone rip rap to slope of earth dam and dyke with quarried and blasted granite stone boulders of size 0.30m and above including dumping on slope filling interstics with small stone and wedges and packing surface to proper line and levels including fixing wave breakers etc complete as directed by the EIC.(No deduction towards voids in finished section) |
| 7 | Fine dressing turfing to the slopes of the damand embankment with best compacted dub grass sods including periodical watering till the survival of truf with all leads and lifts etc complete as directed by E.I.C. (Measurement will be taken after survival of sods) |
| 8 | Excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site with initial lead and lift of 50m & initial lift of 1.5m including dewatering from foundation if necessary etc complete as directed by the Engineer-in-charge. |
| 9 | Filling in foundatin and plinth with sand with watering and ramming etc complete as directed by the Engineer-in-charge. |
| 10 | Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labour with all leadfor materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground leveletc. complete in all respect to proper slope & levelwith all cost, conveyance, royalty & other taxes of all materials etc complete in all respect as directed by the Engineer-in-charge. |
| 11 | Reiforcement cement concrete M20 grade with 20mm downgraded hard granite crusher broken chips of approved quality free from skin materials mixing by mechanical means including hoisting lowering and laying the concrete in position to proper slope and level and compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering, curing for required period cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item etc. complete as directed by theEngineer-in-charge. |
| 12 | Providing straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar of approved quality reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost, conveyance & all taxes of reinforcement as directed by the Engineer-in-charge. |
| 13 | Providing rigid and smooth centering and shuttering for R.C.C. work in F&Pincluding cost, conveyance,all taxes of all materials all labour chargesincluding dismantling it after required period etc. complete as directed by the Engineer-in-charge. |
| 14 | Supplying, laying, fitting and fixing in position of 150mm diaR.C.C. NP3 hume pipe with collars jointed with cement mortar (1:3) complete including cost and conveyance of hume pipes etc complete as per direction by the E.I.C. |
| 15 | Earthworkin hard soil with all lead and liftincluding roughdressing & breaking clods to maximum 5cm to 7 cm size & depositing the excavated materials in layers not exceeding 0.30mtr in depth etc complete and as directed by the Engineer-in-charge. (Deduct 12.50% for settlement) (Royalty will be deducted) |
| 16 | Earthworkin Ordinary soil withall lead and lift including roughdressing & breaking clods to maximum 5cm to 7 cm size & depositing the excavated materials in layers not exceeding 0.30mtr in depth etc complete and as directed by the Engineer-in-charge. |