Central Mine Planning And Design Institute Limited-CMPDI has published Tender For Planning , Design, Engg, Const, Fabrication , Erection, Supply, Installation, Testing Of 03 Nos Stps Of 200 Kld Capacity Each Based On Sbr Technology At Hospital Colony, Lapanga Colony And Patel Nagar Colony Barka Sayal Area Ccl. Submission Date for this Tender is 06-02-2023. Sewage Treatment Plant Tenders in Ramgarh Jharkhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Jan-2023 | Change in similar nature of work | Other | 06-02-2023 |
Sl. No. | Item Description |
1 | Surveying, Geotechnical investigation, preparation ofContour Plan and other related works like clearing the STP plant sites and making it complete in all respect etc. for three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony. |
2 | Planning , DESIGN, ENGINEERING, CONSTRUCTION, of sewage networks (DWC HDPE Pipes) including providing inspection chambers, intermediate pumping arrangement (if required) and all associated works making it complete in all respect for three colonies namelyHospital Colony, Lapanga Colony and Patel Nagar Colony. |
3 | Supply, installation, testing and commisioning of STP of capacity 200 KLDbased on SBR Technologyas per scope of work given , including civil work ( except Plant Room),Electrical , Mechanical works , electro mechanical equipments, development works, horticulture works etc.in all complete for three colonies namelyHospital Colony, Lapanga Colony and Patel Nagar Colony. |
4 | Construction of controlRoom of minimum size 3m x 3.5m x 3.0 m (min. ht), adequate foundation as required , 9” brick wall, sufficient windows, Doors, Roof:M30 RCC roof, Flooring:required flooring, internal/external electrifications, all complete as per direction of EIC for STPs in three colonies namelyHospital Colony, Lapanga Colony and Patel Nagar Colony. |
5 | Construction of RCC framed boundary wall of height 2.0 m and 600 mm concertina fencing above it as per CPWD specifications with M30 concrete and Flys ash bricks (minimum class designation 7.5) with Main entrance gate for STPs plant premises in three colonies namelyHospital Colony, Lapanga Colony and Patel Nagar Colony. |
6 | Providing and laying 60mm thick faciory made cement concrete interlocking paver block ofM -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand ,providing PCC bed below it etc. complete as per CPWD specifications/ as per direction of EIC for STPs in three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony. |
7 | Comprehensive operation in 24x7, maintenance contract including necessary servicing and replacement of spare parts (OEM) etc. complete |
8 | Operation charges during warranty period of 12 months as per scope of workincluding disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
9 | Ist Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
10 | 2nd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
11 | 3rd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
12 | 4th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
13 | 5th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work& disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs |
14 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy