Tender For Repair And Renovation Of Library Building And Construction Of Toilet At 85 Kiliyur Habitation In 85 Kiliyur Panchayat In Valangaiman Block Pack No 2
Tender Overview
Project Description
Repair And Renovation Of Library Building And Construction Of Toilet At 85 Kiliyur Habitation In 85 Kiliyur Panchayat In Valangaiman Block Pack No 2
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Jan-2023 | Extension of tender date | Date | 31-Jan-2023 |
| 2 | 31-Jan-2023 | Administrative Reason | Date | 02-Feb-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | 1. Repairs toR C C Library Building at 85 Kiliyur in 85 KiliyurPanchayat |
| 2 | Dismantling the existingflooring including cost and conveyancing and including all labour charges etc., completed |
| 3 | Chipping offlooring including cost and conveyancing and including all labour charges etc., completed |
| 4 | Paving the floor with scratch proof Ceramictiles305 x 305 x 6mm including cost and all labour charges etc., |
| 5 | Grano flooring 1:2:4 using 10 to 12 mm to 25mm thick ISS Metal including cost and all labour charges |
| 6 | Supply of CUDAPHA Slab 20mm thick including cost and all labour charges etc., |
| 7 | Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc complete., |
| 8 | Filling with good river sand including cost, conveyance for all materials& labour charges etc complete |
| 9 | Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
| 10 | Brick work with cement mortar 1:5 mix using country brick of size 8 3/4 x 4 1/4 x 2 1/4 inculding cost and conveyance of all materiales curing etc ,complete |
| 11 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 12 | Pointing with Cement Morter 1:3 mix 10 % weight of cement inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 13 | White washing two coats using shell lime including cost of materils and all labour charges etc., completed |
| 14 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 15 | Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed |
| 16 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 17 | Provision for Door and Window |
| 18 | Ceiling Fan |
| 19 | CFL Bulb |
| 20 | Service Wire |
| 21 | Provision for RWH |
| 22 | Provision for Name board charges etc., |
| 23 | Provision for photo charges etc., |
| 24 | SUB ESTIMATE |
| 25 | Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation |
| 26 | Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation |
| 27 | Cement concrete 1:4:8 mix usin 40 mm HBGSmetal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation |
| 28 | Brick work with cement mortar 1:5 mix using II class bricksfor foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.(Below basement) |
| 29 | Brick work with cement mortar 1:5 mix using II class bricksfor foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.(above basement) |
| 30 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGSmetal inculding cost and coveyance of allmaterials to site including labour for mixing ,laying,curing etc complete., |
| 31 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
| 32 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., |
| 33 | Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc |
| 34 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 35 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 36 | Fabrication and supply of mild steel Door of anysize with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. |
| 37 | White washing two coatsusing shell lime including cost and conveyance of all materials to site and all labour charges etc comopletefor 100 Sqm |
| 38 | Painting two coats with approved Intrier Emulusion paintplastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) |
| 39 | Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approvedfirst quality of synthetic enamel paint of approved colour over the existing priming coats,ete. |
| 40 | Labour charges for fixing of Steel Door including all labour charges etc. complete. |
| 41 | Supply and fixing of Water closet with \"P\" trap, PVC Pipes, Jolly 0.60 x 0.45m, Precast slab for Manhole cover & Lock and keyetc. complete. |
| 42 | Provision for Soakpit arrangemets 1.200mm dia RCC Rings and cover slab |
| 43 | Provision forTank, PVC & GI Pipes and Specials for Water supply and sanitary arrangements |
| 44 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender