Tender For Special Repair To D, F And 1R Type Quarters At Central Township, Kaliapani In The District Of Jajpur.
Tender Overview
Project Description
Special Repair To D, F And 1R Type Quarters At Central Township, Kaliapani In The District Of Jajpur.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Jan-2023 | CORRIGENDUM 1 | Technical Bid | 30-Jan-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Labour for rubbing out heavy moss from shift walls exposed to weather including scaffolding if necessary and washing the wall surface to receive paint as per requirement completes as per specification and direction of EIC. |
| 2 | Removing old lime or cement plaster from walls including raking out joints 12mm deep and removing the debris within 50m. lead etc. complete as per the direction of EIC. |
| 3 | Providingand applying water proffing treatment(Two component glass fibre reinforced specially formulated acrylic modified cementious eklastic coating system ) using Sika / equivalent topseal 109 @ 2.50 Kg/Sqm and Sika / equivalent feb-1 or equivalent (glass fibre cloth) including all cost of conveyance ,labour T&P etc complete as per direction of EIC. |
| 4 | 12mm (1/2\") thick cement plaster (1:4) mixing with sika latex / equivalent in prop(1:4)(1 sika latex 4 water) including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. |
| 5 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. |
| 6 | Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of6mm size black hard crusher broken granite chips with addition of water proofing compound of approved quality to be mixed with specified ratio including watering, curing, cost, conveyance, royalties, ,es of all materials, cost of all labour, T&P etc. complete as required for the finished item of work as directed by the Engineer-in-charge. |
| 7 | Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used) (over smooth plaster surface) |
| 8 | Scraping old paints with scrappers, sand papering and washing the soap water or soda including scaffolding up to 5m height including cost of all labour, T&P required to complete as direction of EIC. |
| 9 | Painting two coats with approved brand of synthetic enamel paint of approved shade and quality over a coat of approved primer to wood / iron works including cost of paint, primer, putty, scaffolding, T&P, cost, conveyance, cost of all materials and cost of all labour required for the work etc. complete as per the direction of EIC. (Paints of Burger/Nerolac/J&N /Asian/ ICIBrand is to be used.) |
| 10 | Dismantling and removing RCC column, beam,slab,staircase,landing, lintel includingstacking the same for reuse and removing the debris within 50m.lead including cost of alllabours,T & P required for the work etc. Complete as directed by EIC. |
| 11 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In slab |
| 12 | Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance, taxes of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respect as directed by the EIC. |
| 13 | Supplying all materials, labour T&P, and making rain beat to cornice of roof slab / chajja of size 25mm x 12mm with C.M. (1:3) including cost, conveyance, royalties of all materials, cost of all labour, T&P & scaffolding required to complete the work as per direction of EIC. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents