Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #35748015

Tender For On-Site Serving Maintenance And Overhauling Of 11 Kv, 1000 Kw Ht Vertical Slip Ring Motor (Unit-I) And Liquid Rotor Resistance Starter At Lift Water Supply Station Tangnar Stage-2Nd.

Issued by Government Departments · Srinagar, Jammu And Kashmir
Tender Value
3.27 Lakhs
Estimated cost
Bid Submission
30 Jan 2023
0 days left
EMD
6600
Bank guarantee accepted
Document Fee
200
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

On-Site Serving Maintenance And Overhauling Of 11 Kv, 1000 Kw Ht Vertical Slip Ring Motor (Unit-I) And Liquid Rotor Resistance Starter At Lift Water Supply Station Tangnar Stage-2Nd.

BOQ

Name of Work: On-site serving Maintenance and overhauling of 11 KV, 1000 KW HT vertical Slip Ring Motor (Unit-I) and liquid Rotor Resistance Starter at Lift Water Supply Station Tangnar Stage-2nd.
Sl. No. Item Description
1On-Site Servicing, Maintenance & Overhauling of 11kV, 1000 kW HT Vertical Slip Ring Motor (Unit-1) as per the clause 16 & 17 of IS-900:1992 (to be read with the latest amendments) at Lift Water Supply Scheme Tangnar Stage-2nd by way of: -i) Disconnecting of HT motor from 11 kV Electric supply mains including Control cabling Terminal box & disengaging/decoupling motor from the Bowl assembly including dismantling of motor from its mounting stool. Loading/ shifting of same at convenient place at site for conducting necessary servicing / maintenance at site only in order to avoid any damage which might take place to HT motor during shifting to workshop through transportation etc.ii) Dismantling of HT motor with the help of tools & tackles without using excessive force and hammer blows. The job involves removing of motor shield covers, extraction of rotor from stator assembly, including dismantling of bearing housings and removal of bearings by using hydraulic puller if required.iii) Measuring, recording the initial insulation resistance (IR) &Polarization Index (PI) values of the stator windings and rotor windings, under high voltage using Mega Ohm Meter, current injection test at low voltage & at high current.iv) Cleaning Stator and Rotor from dust, dirt, oil and grit using Air blower, compressed air hose, bellows or brushes and washing with Isopropyl Alcohol/ Petrol and few drops of oil as necessary for complete removal of foreign matter.v) Heat treatment and drying of the Stator and Rotor through suitable means like Hot blower at 90 to 95 degrees Celsius for driving out entrapped moisture till desired IR Value is obtained.vi) Re-enameling of all windings of Stator and Rotor (Except stator bore) with 11 Kv grade Epoxy coatings [5 kgs approx.] along with hardener [1/4 kg] as recommended to withstand damp & wet conditions and drying of the same thoroughly by specific means using hot blower, Checking and measuring IR Value again for the desired value. vii) Complete disconnecting of both Motor Terminal boxes Checking and cleaning of thimbles, cable kits, HT tapes, clamps, Bus bar-coupler rubber with suitable cleaning aids and replacement of silica gel. viii) Reassembling of rotor assembly in the stator using tools & tackles including fitment of bearing housings on two sides. The job includes fitment of shields with allied works.ix) Successful Testing of HT motor 1st on no load & then on full load after coupling/locking arrangement, & connecting of HT motor to 11 kv Electric supply mains including Control cabling too at appropriate places.x) The above whole work is to be carried out under the supervision of a qualified experienced Electrical Engineer “to be hired by the bidder” with adequate experience in handing of jobs of this nature especially necessary Testing of the equipment. Such in-charge/Engineer shall be constantly in attendance at the site with other skilled as well as unskilled workers during working hours under whose supervision the whole work of Servicing, Maintenance & Overhauling from start to end has to be carried out.
2Heat Treatment/drying of the stator & rotor winding\"s [if IR values at Item No: 01(v) are found undesirable] by giving proper oven drying at the facility of the firm capable of holding above 1000 KW HT Slip Ring Motor [Approx. size =8.5 ft x 3.5 ftx3.5 ft]at 90 to 95 degree Celsius for minimum 48 hours and checking, recording final desired parameters after Heat treatment procedure by required testing equipment. Cost on account of hiring &running charges of9-Ton Diesel Truck & 20-Ton Crane for Transporting, Loading, Shifting and unloading from site to workshop of above 1000 KW HT motor weighing about6500Kgs approximately and back from workshop to site along with cost on account of Oven charges at workshop is included in this whole job
3Providing & Fitting of New bearing temperature sensors as per sample after replacement of damaged ones.
4Providing & Fitting New DE & NDE bearing temperature dial indicators 5A 240 V AC/0.5A 220 V DC/as per sample after replacement of damaged ones.
5Providing & Fitting of 3 core70 mm2 end Termination Heat Shrinkable indoor type HT Cable kit as a replacement against Damaged ones.
6Providing & Fitting of 630 mm2 aluminum long barrel lugs preferably of DOWELS make to cable end terminals with proper insulation/tapping at joints. The Job includes crimping of thimbles after replacement of worn-out ones using Hydraulic crimping tool.
7Providing & Fitting of 185 mm2 aluminum long barrel lugs preferably of DOWELS make to cable end terminals with proper insulation/tapping at joints. The Job includes crimping of thimbles after replacement of worn-out ones using Hydraulic crimping tool
8Servicing/reconditioning of roughened Slip Rings if not ridged out by way of cleaning with fine glass paper mounted on a wooden block shaped to the curvature of the rings.
9Reconditioning of roughened Slip Rings [if found ridged out at 07(a)] by way of turning/machining on lathe for the smooth finish including jig and fixture arrangement for holding work without causing any damage to slip rings. The job includes all leads and lifts between site and workshop.
10Providing & Fitting of New carbon brushes of size 65x50x25 mm M16E with heavy duty double copper tail 100 mm with U-Type copper lug. The job includes re-tensioning of same in brush holder springs at correct pressure and proper alignment to ensure smooth sliding of brushes free from slackness or stiffness using appropriate Torque wrench.
11Providing & fitting of heavy-duty brass brush holders capable of holding two carbon brushes as per specimen i.e. BHEL make. The job includes re-tensioning of brush holder springs to correct pressure and proper alignment to ensure smooth sliding of brushes free from slackness or stiffness using appropriate Torque wrench
12Servicing by removing of old grease from both bearings and its housings of DE & NDE side by way of washing cleaning with diesel/petrol. The job includes Servicing/ reconditioning of bearing &housings along with packing of fresh grease between the cage, races, balls and rollers, the superfluous grease if any has to be wiped off.
13Providing and fitting of NU6230C3 Bearing of SKF/FAG make at driving end “DE” of the HT motor’s rotor assembly after dismantling of damaged one using appropriate tools &tackels. [if found defective at 11(a)].
14Providing and fitting of 7324B bearing of SKF/FAG make at Non-driving end “NDE” of the HT motor’s rotor assembly after dismantling of damaged one using appropriate tools &tackels[if found defective at 11(a)].
15Servicing of Liquid Rotor Resistance Starter of above 11kV, 1000 kW HT Vertical Slip Ring Motor (Unit-1) by way of:i) Disconnecting all incoming and outgoing Power and control cabling from the starter assemblyii) Draining of old/used quantity of electrolyte of about 990 liters from the starter container to a safer place.iii) Cleaning the container, electrodes by suitable means using water and isopropyl alcohol along with all moving and fixed contacts/parts within the container.iv) Draining of old/used gear oil to gear mechanism of the starter and filling same with fresh gear oil approximately 01 liter. The job includes greasing/servicing of the motor assembly along with the transmission system of the starter including gears and chains. v) Cleaning/decarburizing all the moving as well as fixed contact points of the 630A contactor assembly along with other auxiliary NO-NC contacts by using isopropyl alcohol and allied cleaning tools.vi) Cleaning/decarburizing of bus bar arrangement within the starter assembly including cable end terminals, lugs with replacement of aluminum thimbles/lugs if damaged.vii) After cleaning/servicing through above means filling of container with fresh electrolyte of 990 liters including 07 kgs of sodium carbonate for achieving starting torque of 200% of FLT and successful testing of starter on no load followed by full load after connecting all power and control cablings.
16TESTS TO BE CARRIED OUT AT SITE AFTER SERVICING.a) IR/PI Value b) Winding resistance surge test c) No load current measurementd) Measurement of bearing temperatures / winding temperatures. e) Measurement of rotor impedance / resistance LIST OF TOOLS AND TACKLES TO BE BROUGHT AT SITE.Hydraulic Pullers oxygen / Acetylene torches and cylinders proper transportation arrangement for motors from site to maintenance bay like slings, trolleys, crane, etc. wooden sleepers for rotor resting, heaters of appropriate size for drying of stator winding upto 90c suitable pipes for rotor withdrawal, compressor, blowers, induction heaters for bearing heating, all types of spanners, equipments required for site testing of motor. All other tools and tackles required to execute the job as per scope of work.

AI Tender Summary

OUR REF NO 35748015
AUTHORITY Government Departments
TENDER VALUE 3.27 Lakhs
LAST DATE 30-01-2023
Authority
Authority Name Public Health Engineering Department
Work Description On-Site Serving Maintenance And Overhauling Of 11 Kv, 1000 Kw Ht Vertical Slip Ring Motor (Unit-I) And Liquid Rotor Resistance Starter At Lift Water Supply Station Tangnar Stage-2Nd.
Basic Detail
Tender No PHE/MECH/e-NIT-55 of 01/2023
Bidding Type Tender
Location
City Srinagar
State Jammu And Kashmir
Key Dates
Publish Date 16 Jan 2023
Submission Date 30 Jan 2023
Open Date 02 Feb 2023
Finance
Tender Value 3.27 Lakhs
Tender Fee 200
EMD 6600
Exemption Not Available
Document List
bc28d573-5da3-4e75-ba91-a0c12fb1bdd0.html
BOQ_541141.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 16, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 30, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 02, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

bc28d573-5da3-4e75-ba91-a0c12fb1bdd0.html

xls

BOQ_541141.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders