Tender For Special Repair, Conservation And Beautification Of Ujjaytanta Palace And South Entrance Gate At Agartala, Tripura, agartala-Tripura

Public Works Department-PWD has published Tender For Special Repair, Conservation And Beautification Of Ujjaytanta Palace And South Entrance Gate At Agartala, Tripura. Submission Date for this Tender is 27-01-2023. Civil Work Tenders in agartala Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

35737685
Tender For Special Repair, Conservation And Beautification Of Ujjaytanta Palace And South Entrance Gate At Agartala, Tripura
Open Tender
Indian
Tripura
agartala
27-01-2023

Tender Details

Special Repair, Conservation And Beautification Of Ujjaytanta Palace And South Entrance Gate At Agartala, Tripura

Key Value

Document Fees
INR 8000 /-
EMD
INR 336761.0 /-
Tender Value
INR 1.68 Crore /-

BOQ Items

Name of Work: Special Repair, Conservation and Beautification of Ujjaytanta Palace and South Entrance Gate at Agartala, Tripura.
Sl. No. Item Description
1Providing and laying POP on the existing flooring upto required thick 40mm to protect the Floor during retrofitting work and removal of the same after completion of work all including cost of materials, labour, equipments, transporting , lead, lift tools etc all including disposal of debris etc complete
2Providing and applying washable acrylic co-polymerpenetratingsilane-siloxane coating upto NOT LESS THAN 200 micron DFT which shall be . High Performance Anticarbonation, high resistance to C02/S02/chloride ions diffusion, resistance to UV rays, elastoplastic, including skilled labours as per the manufactures specification including tools , tackles etc. complete, including water repellent coating over the painted surfaceas per manufacturer specification.. Surface preparation All surfaces should be dry and free fromcontamination such as oil, grease, loose particles,decayed matter, moss, algae growth, laitance, andall traces of mould release oils and curingcompounds. This is best achieved by lightly gritblasting the surface. Where moss, algae or similargrowths have occurred, treatment with aproprietary biocide should be carried out after thegrit blasting process.
3Removal of existing plaster on external, internal walls, towers upto any thickwherever found required including deep raking the joints , providing suitable treatment to remove the formation of alkali salts rinsing with hot water or by chemical wash (if required) without eroding the brick surface etc. complete including materials, chemicals, cost of labour, tools and tackles complete including wetting/damping or drying the wall etc. complete and disposal of debris etc complete
4Providing and applying composite polymer Stucco plaster upto required thick to match the existing profile withappropriate Mix with addition ofPolypropylene Fibre as per manufacture specification and admixture to minimums the permeabilityover an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat , finish coat shall be 1:1 stucco (1: Cement, 1: fine Marble powder, mixed with wtaer:SBR at the rate of 1:1 ratio i.e. 1 water: 1 SBR) upto 1mm to 5mm thick by brush or towelled smooth or floated etc as per the requirement including materials, skilled masons,curing etc., complete., Existing masonry jointswhich are exposed shall be deep raked and repointed before plastering.
5Providing and laying cement concrete 1:1.5:3 (1 cement : 1.5 fine sand : 3 graded stone aggregate 6mm done chips of 10mm to 20 mm depending on the site condition) with addition of Polypropylene fibre as per manufactures specification or at the rate of 200 gms per one bag of cement and admixture at the rate of 200 ml per bag of cement etc. mixing, pouring, levelling, curing etc including lift etc. complete for PCC flagging or wherever required.
6Providing and fixing seismic element, fixing with epoxy/Micro concreteas per manufactures specification, drilling 10mm/20mm dia hole upto a depth of 100mm, cleaning the holes with blowers etc. and fixing connectors with8mm steel upto a length of 100mm includingcutting and bending with labour, equipment, machinery etc. complete wherever required, as per the seismic requirements etc complete
7loading and Unloading of stone boulder, stone aggregate, brick aggregate, Kankar, earth crushed slag, stone for masonry work by mechanical means including a lead up to 10Km
8Finishing all architectural elements like kumbha tadi, stylobate, stambham , kalasa,fillet, flute , arrises, annulets , hypotrachelion etc, echinus, abacus, volute, resete if any etc for mix doric , carinthian orders etc complete including skilled sculptor etc complete with all tooles and tackles Brick work (precast or siteinto), cement concrete both (RCC & PCC), shear connectors, centering, Reinforcement, scaffolding etc shall be paidseperately
9Finishing all architectural elements like ovola , cuma recta , cyma reverse , any dentils , combined with any type of anthemion, fillets astragal , corona , cavetto , corona , scotia , torus, fillet etc including skilled sculptor etc complete with1 : 1 : 6 (1 Cement, 1 Lime, 6 River Sand) with addition ofPolypropylene Fibre as per manufacture"s specification and admixture to minimize the permeability over an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat. Finishing coat shall be 1 : 1 stucco (1 Cement, 1 Fine Marble powder, mixed with water : SBR at the rate of 1 : 1 ratio i.e. 1 water: 1 SBR) brick work, shear connectors, centering, Reinforcement, scaffolding etc shall be paidseperately
10Finishing all architectural elements like crepidoma of any modul, entasis , coveing three set of pediment type , frieze , cornice moulding with baton/canal/ tyochilas/ovolo/gorg/ cymatium,dourcioc etc , semicircular bargeboards with mouldings with acroterion , mutules , guttae , triglyph , tania, rugula etc, intrados,sets of frieze,cornice, four Colossal comppier type (doric or anyorder) with echinus, necking,astragal etc including shaft,Torus, sole, arrises , flutes or equ , rest,of any type, four corif, two moulded scrolled,fiscial etc complete withapplying composite Stucco plaster upto required thick to match the existing profile with1:1:6 (1:Cement,1:Lime, 6: River Sand) with addition ofPolypropylene Fiber per manufacture specification and admixture to minimums the permeabilityover an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat , finish coat shall be 1:1 stucco (1: Cement, 1: fine Marble powder, mixed with wtaer:SBR at the rate of 1:1 ratio i.e. 1 water: 1 SBR) upto 1mm to 5mm thick by brush or troweled smooth or floated etc as per the requirement including materials, skilled sculptor curing etc., completeThe negative shape shall be brought with first class brick bates.(If the ornamentfound to be more than 50 mm thick reinforcement shall be anchored with epoxy ) Brick work (precast or siteinto), cement concrete both (RCC & PCC), shear connectors, centering, Reinforcement, scaffolding etc shall be paidseperately
11Providing and applying one cement primer of approved brand and manufacture on wall surface complete. Ground Floor Walls, ceiling etc where ever found required including damping wall tools tackles brush etc complete
12Wall Painting with plastic Emulsion paint (one or More Coat) of required color of approved brand and manufacture on new work to give an even shade including tools tackles etc complete
13Providing and applying a layer of epoxy rasin fairing coat at 1mm thicknesson the external/internal surface of the wall. The epoxyfairing coat should be a two componentthixotropic, solvent free, compound based onepoxy resins, graded fillers and thixotropic agents.It is applied directly to concrete substrates,without primer, and cures to a surface ready forover coating.
14Providing and laying 110mm dia PVC pipes (6 kgs/cm2) including bends, specials, couplings, clamps, sealing the joints with jointing solutions and labour etc. complete for sanitary lines, rainwater down take etc. wherever found required.
15Providing and applying Polyurethane polishing on wooden surface,which shall protect against dust, weathering, abrasion, and other processes which damage it with PU polish over time. The Polish PU protects moisture, scratches, dust, water, UV radiation, and weathering, etc complete including labour, tooles tackels etc complete.
16Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
17(i) Thermo-Mechanically Treated bars of grade Fe-500D or more
18First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
19In cement mortar 1:5 ( 1 cement : 5 fine sand ).
20Providing and fixing Marble stone in floors over 20 mm thick bed of cement mortar 1 : 4 ( 1 cement : 4 fine sand ) jointed with ordinary cement slurry including pointing with white cement mixed with of matching shade, including rubbing and polishing complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail