Tender For Supply And Erection Of G.I Barbed Wire With Rcc Post, Fencing, Jungle Clearance And Land Marking At Project Site Lankaijan And Klurdung, Karbi Anglong Iidentified By Apdcl For 1000 Mw Solar Power Project, karbi-Assam

Assam Power Distribution Company Limited-APDCL has published Tender For Supply And Erection Of G.I Barbed Wire With Rcc Post, Fencing, Jungle Clearance And Land Marking At Project Site Lankaijan And Klurdung, Karbi Anglong Iidentified By Apdcl For 1000 Mw Solar Power Project. Submission Date for this Tender is 27-01-2023. Solar Power Plants Tenders in karbi Assam. Bidders can get complete Tender details and download the document.




Tender Notice

35736605
Tender For Supply And Erection Of G.I Barbed Wire With Rcc Post, Fencing, Jungle Clearance And Land Marking At Project Site Lankaijan And Klurdung, Karbi Anglong Iidentified By Apdcl For 1000 Mw Solar Power Project
Open Tender
Indian
Assam
karbi
27-01-2023

Tender Details

Supply And Erection Of G.I Barbed Wire With Rcc Post, Fencing, Jungle Clearance And Land Marking At Project Site Lankaijan And Klurdung, Karbi Anglong Iidentified By Apdcl For 1000 Mw Solar Power Project Supply And Erection Of G.I Barbed Wire With Rcc Post, Fencing, Jungle Clearance And Land Marking At Project Site Lankaijan And Klurdung, Karbi Anglong Identified By Apdcl For 1000 Mw Solar Power Project Under Mukhya Mantri Sauro Shakti Prokolpo

Key Value

Document Fees
INR 4720 /-
EMD
INR 375000.0 /-
Tender Value
INR 1.95 Crore /-

BOQ Items

Name of Work: Supply and Erection of G.I barbed wire with RCC post fencing and Jungle clearance & land marking at project site “Lankaijan, NC area under Diphu Revenue Circle and Klurdung, NC area under Phuloni Revenue Circle, Karbi Anglong” identified by APDCL for Implementation of 1000 MW Solar Power Project under MUKHYA MANTRI SAURO SHAKTI PROKOLPO
Sl. No. Item Description
1Items :
2G.I. Barbed Wire Fencing 1.2 m high- Providing and fixing 1.2 m high GI barbed wire fencing with 1.8 m RCC posts 150 mm x 150 mm placed every 3 m centre-to-centre founded in M15 grade cement concrete, 0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete as per Clause 1705.
3Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (Considering only ten percent of total area) ii) By Mechanical Means. b) In area of non-thorny jungle.
4Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m. 2.6.1) All kinds of soil
5Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.2) Cement mortar 1:6 (1 cement : 6 coarse sand)
6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.3) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1) Mild steel and Medium Tensile steel bars
8Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1) Foundations, footings, bases of columns, etc. for mass concrete.
9Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
1012 mm cement plaster of mix : 13.1.2) 1:6 (1 cement: 6 fine sand)
11Finishing walls with water proofing cement paint of required shade : 13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail