Civil Aviation Government Departments Closing in 0 days TDR #35733353

Tender For Construction Of Shed For Farm Machinery Bank- Mawana Society

Issued by Government Departments · mawana, Uttar Pradesh
Tender Value
12.27 Lakhs
Estimated cost
Bid Submission
23 Jan 2023
0 days left
EMD
1.23 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
mawana → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Shed For Farm Machinery Bank- Mawana Society

BOQ

Name of Work: Construction of Shed for Farm Machinery Bank- Mawana Society.
Sl. No. Item Description
1Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.
2Filling of carted earth. From 8 Km
3Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand.
4Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors.
5Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete
6(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm
7(4)Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer\"s standard dilution)
8R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-200.
9As in item 6 but for thelighterbeams i.e. having spans upto 6 m. (Using 1:1.5:3 Mix concrete)
10Ground Floor
11As in item 6 abovebut inR.C.C.Raft foundation and footingwithapproved stone ballast.(Using1:1.5:3Mix concrete) (upto plinth)
12As in item 6 above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20.
13Ground Floor
14First class brick work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar infoundation & plinth including supply of all materials, labour and T & P etc reqiored for proper completion of the work.
15Same as in item no. 10 abovebutin super-structure above plinth level up to floor two level ( up to two storeys ) includingnecessarycutting and moulding of brick work asrequiredand also including honeycombed brick work in thickness of wall more than 12cms.
16Ground Floor
17P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.
18Ground Floor
19Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
2012 mm cement plaster on rough side of single or half brick wall of mix : 1:4 (1 cement: 4 coarse sand)
2112 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 fine sand
22Ground Floor
2312mm cement plaster in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or roundedangles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive. (1) 1 cement : 6 fine sand
24Ground Floor
25Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 12-20mm nominal size laid in one layer neat cement (40 mm thick floor).
26Cement plaster skirting up to 30 cm height, with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement.18 mm thick
27Ground Floor
28Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade :New work (Two or more coats applied @ 1.43 ltr/ 10sqm over and including priming coat of exterior primerapplied @ 2.20 kg/ 10 sqm)
29Ground Floor
30Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
31Distempering (Two coat) with oil bound distemper of approved brand and manufacture & of required shade on ceiling to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as Berger, J & N, Shalimar, Asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters including cost of all labour & materials.
32Ground Floor
33Applying putty base
34Primer
35Mild Steel or iron work in heavy sizes such astrusses, builtup gate,roof work etc., wrought to required formincluding cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
36Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
37Painting Ist coat over priming coat (butexcluding cost of priming coat) on steelandothermetalsurfacesup to 10 cm.widthorgirthorsmall articles notexceeding 0.10sqm in area white superiorsynthetic enamel such as LUXOL3,Hi-glossapcolitesuperlac,DULUX specifiedbrushingtogiveanevenshadeandincluding cleaningthe surfaceofalldirt,dust and other foreignmatter sandpaperingand stopingincluding cost ofall materials, labour toolsandplantsetc. required forpropercompletion ofthe work.
38Electric Work
39Less 5.00 % work efficiency

AI Tender Summary

OUR REF NO 35733353
AUTHORITY Government Departments
TENDER VALUE 12.27 Lakhs
LAST DATE 23-01-2023
Authority
Authority Name Cane Development and Sugar Industry
Work Description Construction Of Shed For Farm Machinery Bank- Mawana Society
Basic Detail
Tender No 410/C Dt 27-12-2022
Bidding Type Tender
Location
City mawana
State Uttar Pradesh
Key Dates
Publish Date 13 Jan 2023
Submission Date 23 Jan 2023
Open Date 24 Jan 2023
Finance
Tender Value 12.27 Lakhs
Tender Fee 1180
EMD 1.23 Lakhs
Exemption Not Available
Document List
918ac0fa-cfc4-4080-a53f-a7f14b39055c.html
BOQ_1263496.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 13, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 23, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 24, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

918ac0fa-cfc4-4080-a53f-a7f14b39055c.html

xls

BOQ_1263496.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders