Numaligarh Refinery Limited has published Tender For Supply Of Hv Capacitor Bank. Submission Date for this Tender is 02-03-2023. Reactor Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Feb-2023 | TECHNICAL QUERIES_01 | Other | 09-02-2023 |
2 | 02-Feb-2023 | CORRIGENDUM_01 | Date | 09-02-2023 |
3 | 08-Feb-2023 | CORRIGENDUM_02 | Date | 23-02-2023 |
4 | 23-Feb-2023 | CORRIGENDUM_03 | Date | 02-03-2023 |
Sl. No. | Item Description |
1 | APFC PANEL WITH CAPACITOR BANKS (INDOOR TYPE) 2050 KVAR WITH DRY TYPE SERIESREACTOR, DRY TYPE RVT AND APFC PANEL AND REQUIRED ACCESSORIES, 6.6 kV, 40kA FOR 1S. STEP RANGE (STEP 1 -300kVAR, STEP 2 - 600kVAR, STEP 3 -1150kVAR) (Refer Technical Notes 1 in the previous sheet.) |
2 | APFC PANEL WITH CAPACITOR BANKS (INDOOR TYPE) 3700 KVAR WITH DRY TYPE SERIES REACTOR, DRY TYPE RVT AND APFC PANEL AND REQUIRED ACCESSORIES, 6.6 kV, 40kA FOR 1S. STEP RANGE (STEP 1 -400kVAR, STEP 2 - 800kVAR, STEP 3 -1000kVAR, STEP 4 - 1500kVAR) (Refer Technical Notes 1 in the previous sheet.) |
3 | APFC PANEL WITH CAPACITOR BANKS (INDOOR TYPE) 5500 KVAR WITH DRY TYPE SERIES REACTOR, DRY TYPE RVT AND APFC PANEL AND REQUIRED ACCESSORIES, 6.6 kV, 40kA FOR 1S. STEP RANGE (STEP 1 -500kVAR, STEP 2 - 1000kVAR, STEP 3 -1250kVAR, STEP 4 - 1250kVAR, STEP 5 -1500kVAR) (Refer Technical Notes 1 in the previous sheet.) |
4 | APFC PANEL WITH CAPACITOR BANKS (INDOOR TYPE) 1600 KVAR WITH DRY TYPE SERIES REACTOR, DRY TYPE RVT AND APFC PANEL AND REQUIRED ACCESSORIES, 6.6 kV, 40kA FOR 1S. STEP RANGE (STEP 1 -300kVAR, STEP 2- 500kVAR, STEP 3- 800kVAR) (Refer Technical Notes 1 in the previous sheet.) |
5 | SPECIAL TOOLS AND TACKLES - As per Manufacture’s recommendation for the above HV Capacitor Bank |
6 | Bidder shall provide Per Diem rate for Supervision services for Installation of the entire package and for Commissioning / Support Engineer from OEM shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire package. |
7 | Cost for Additional Warranty period of "24 months after commissioning or 36 months after dispatch whichever is earlier”as per Note 16. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail