| 1 | Item No 1 :- Cleaning cutting throny shrubs bushes grass as directed with15 m lead & lift1.50metc. complete. |
| 2 | Item No 2 :-Removing surface boulders including depositing the material as directed with lead upto 15.00m lift1etc. complete. |
| 3 | Item No 3 :-Exvavation in soil/ silt /s.m. /shadu /exceeing 1.5 m. in width,includingdispossing ofthe excavated material up to lead of 15 m.& lift up to 1.5 m. stacking as directed including dressingetc. complete. |
| 4 | ItemNo.4 :- Excavation in Hard Murumincluding boulders up to 0.6 m dia.(0.113 cum) for canal,seating of embankment,filter drains / catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service roadas directed including cost of all materials,machinery,labour,dressing bed & sides to required level and profile etc.complete with lead up to 15 m and all lifts as directed.. |
| 5 | ItemNo.5 : -Excavation in Soft rock mankanker pebbles(including bolders of size less than 0.1cum)exceeding 1.5m in width, including dispossing ofthe excavated material up to lead of 15m & lift up to 1.5 m stacking as directed including dressing etc.complete |
| 6 | Item No6: - Filling Cut of trench with filling using selected impervious soil directly avaiable from materialselected material of excavation including cost of all materials,machinery ,labour ,all other operation such as collection of soil ,spreading soil in layers of specified thickness sorting out, breaking clods,levelling,sectioning edges/sides,watering,compacting each layer to density control of not less than 95 percent or as stipulated using power roller etc.compiete with a lead of 1k m. etc.complete lead of water upto 6 km.lift etc.complete. |
| 7 | Item No7:-constructing of embankment for Hearting zone with selected material directly from available material of excavation including conveying the material upto lead 15m & lift 1.50m laying in layers leveling & dressing excluding watering consolidetion & including royalty of material lead of water 1km etc. complete. |
| 8 | Item No.8:- Providing and laying polythene film of 031 properly manufactured from 100% virgin granules confirming to I.S. 2508-1984 with 1.5 to 2.5 m. package in rolls as per specifications. |
| 9 | Item No 9 :-constructing of embankment for Casingzone with selected material directly from available material of excavation including conveying the material upto lead 15m & lift 1.50m laying in layers leveling & dressing excluding watering consolidetion & including royalty of material lead of water 1km etc. complete. |
| 10 | Item No.10:-Providing and Relaying Removeddry stone pitching 230mm. thick to side slopes of embankment incl. dressing the bank(Rubble30 to 45 kg.) with lead of 50 m. and lift upto 1.50 m excluding pointing incl. quarry spaulsetc.complete. |
| 11 | Item No.11:- Providing and laying dry stone pitching 300 mm thick to U/S super slope of embankment including dressing.the bank but excluding pointing etc Complete. |
| 12 | Item No 12:-Providing and fixing name board as per detail plan including painting & lettering with oil paintesetc,complete. |
| 13 | Item No 13:-Laboratory testing ChargesWater absorbtion & specific gravity Crushing value compresive strength test of ston |
| 14 | Liqwid limit &Plastic limit of soil & murum |
| 15 | Item No.14 :- Royalty Of material used forwork |