|
| 1 | Providing and Installation of Centrifugal pump of 60- LPS, 22 mtr. Head with 25 HPmotor ( IS: 6595)including carrying loading, un-loading etc. at site of work including trial run for 10 hrs. in two spells. |
| 2 | Demolishing of old pump/ motor base & stacking of materials & return the same to Sub-divisional storeas per direction of Engineer-in-charge. |
| 3 | Demolishing cement concrete manually / by mechanical means including disposal of materials with all lifts and upto 50 m lead etc. complete as per direction of the Engineer-in-charge:-Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a leadof 50 m.-All kinds of soil |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) |
| 7 | Providing and fixing M.S. bolts includingnuts and wahser complete as per standard design. I) Above 300 mm length. |
| 8 | Welding by gas or electric plant including transportation of plant at site etc. complete as per standard design. |
| 9 | Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. |
| 10 | Providing and fixing G.I Pipes of Heavy class as per IS 1239 with latest amendment complete with G.I fittings including trenching and refilling , cutting and making good the walls etc. complete as per CPWD specification and direction of Engineering in Charge. A) 150 mm dia. (External Works) |
| 11 | Dismentalling of G.I bend including necessary earth cutting etc. & return the same to Sub-Divisional store as per direction of the Engineer-in-charge |
| 12 | Providing and fixing G.I Bend/ elbow in the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer-in- charge. A)150 mm dia. |
| 13 | Providing & fitting fixing PVC suction hose pipe of wall thickness 6 mm as per relevent IS specification and direction of Engineer-in-charge. A)150 mm dia. |
| 14 | Providing & fitting fixing MS hose clamp with nuts & bolts etc. complete at site of work of approved quality. A)150 mm dia. |
| 15 | Providing & fitting fixing MS tail piece with MS flange suitable for pipes complete as per CPWD Specification & direction ofthe Engineer-in- charge. A) For 125 mm dia PVC pipe |
| 16 | Providing & fitting fixing C.I foot valve of heavy duty at site of work of approved quality.A) 150 mm dia. |
| 17 | Dismentaling of G.I pipe including necessary earth cutting etc & return the same to Sub-Divisional storeas per direction of Engineer-in-charge.A) 125/150 mm dia. |
| 18 | Supplying & fitting fixing of 7/16 Copper Wire with all electrical equipments including trial run etc. complete (ISI Marked) on the pannel board of approved quality. |
| 19 | Providing and fitting fixing of Moulded case circuit Breaker (MCCB) of different Thermal release range , 415+V, 50 HZ( L&T, BCH, ABB make) as per specification and direction of the Engoneer-in-charge. A) 50-63 Amps. |
| 20 | Supplying & fitting fixing manually operated oil immerged starter of approved quality. A) 30 Hp Osco/ BCH Make. |