Tender For Testing For (Water Act/ Air Act/ Noise Act) For Environmental Monitoring And Operational Consent 2022-23 At Aurangabad Airport, aurangabad-Maharashtra

Airports Authority Of India has published Tender For Testing For (Water Act/ Air Act/ Noise Act) For Environmental Monitoring And Operational Consent 2022-23 At Aurangabad Airport. Submission Date for this Tender is 01-02-2023. Environmental Monitoring Service Tenders in aurangabad Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

35723074
Tender For Testing For (Water Act/ Air Act/ Noise Act) For Environmental Monitoring And Operational Consent 2022-23 At Aurangabad Airport
Open Tender
Indian
Maharashtra
aurangabad
01-02-2023

Tender Details

Testing For ( Water Act / Air Act / Noise Act ) For Environmental Monitoring And Operational Consent 2022-23 At Aurangabad Airport

Key Value

Document Fees
INR 1180 /-
EMD
INR 6600.0 /-
Tender Value
INR 3.29 Lakhs /-

BOQ Items

Name of Work: Testing for (Water Act / Air Act / Noise Act) for Environmental Monitoring and Operational Consent 2022-23 at Aurangabad Airport
Sl. No. Item Description
1STP (Sewage treatment plant) sample analysis for parameters - Biochemical Oxygen Demand (BOD 27°C, 3 days), Chemical Oxygen Demand (COD), PH, Total Suspended Soilds (TSS), Oil & Grease, Total Dissolved Solids (TDS), Chlorides, Sulphates for STP inlet -raw water & outlet - treated water etc. complete as per the direction of Engineer-in Charge.
2Testing drinking water for parameters - Indian standards IS -10500-2002 (including pesticides & PAH), microbiological analysis etc. complete as per the direction of Engineer-in Charge.
3Testing drinking water for parameters - Indian standards IS -10500-2002 (excluding pesticides & PAH), Microbiological analysis etc. complete as per the direction of Engineer-in Charge.
4Stack emision monitoring Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2), Total Particulate Matter (TPM) for DG set 04 nos. capacity more than (100 KV) etc. complete as per the direction of Engineer-in Charge.
5Ambient Air quality monitoring 24 Hourly - Ammonia (NH3), Arsenic (As), Benzene (C6H6), Benzo(a)pyrene (BaP), Carbon Monoxide (CO), Lead (Pb), Nickel (Ni), Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2), Ozone (O3), Particulate Matter (PM2.5), Particulate Matter (PM10) etc. complete as per the direction of Engineer-in Charge.
6Noise Monitoring - 24 hours Ambient Noise Monitoring ( Day & Night) etc. complete as per the direction of Engineer-in Charge.
7Filling of monthly cess format and all the formats to be submitted to MPCB during the year etc. complete as per the direction of Engineer-in Charge.
8Noise Monitoring - DG set Noise level monitoring etc. complete as per the direction of Engineer-in Charge.
9Filling of Environmental Statement in a prescribed format to MPCB during the year etc. complete as per the direction of Engineer-in Charge..
10Mobilization of testing personnel including equipments to conduct one set of samlpe collection & report submission at Airport.
11Periodical maintenance of cleaning of STP - Proper cleaning of Aeration tank, Settling tank and Filter Feed tank of dead sludge is settled at the bottom of the tanks; need to remove sludge by pumping out and disposal of the same outside the AAI premisesetc. complete as per the direction of Engineer-in Charge.
12Provision of new drain points if required at the bottom of settling tank, filter feed tankso that the dead sludge will not settle in these tanks etc. complete as per the direction of Engineer-in Charge.
13Provision of new sludge circulation system with new pump of required capacity for the proper functioning of live culture etc. complete as per the direction of Engineer-in Charge.
14MBBR (Moving bed biological reaction) media cleaning etc. complete as per the direction of Engineer-in Charge.
15STP Commissioning - After cleaning of all tanks need to add new microbial culture to aeration tank & set up of inlet flow of STP etc. complete as per the direction of Engineer-in Charge.
16Filling of six monthly compliance report, data sheet and monitoring report along with copy of Environment Clearance in a prescribed format to Ministry of Environment, Forests & Climate Change twice during the year etc. complete as per the direction of Engineer-in Charge..
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail