}

Tender For Attending Leak Work At West Zone Ward No 15 To 19 30 To 37 42 44, thoothukudi-Tamil Nadu

Municipal Adminitration And Water Supply Department-MAAWSD has published Tender For Attending Leak Work At West Zone Ward No 15 To 19 30 To 37 42 44. Submission Date for this Tender is 27-01-2023. Couplers Tenders in thoothukudi Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

35707809
Tender For Attending Leak Work At West Zone Ward No 15 To 19 30 To 37 42 44
Open Tender
Indian
Tamil Nadu
thoothukudi
27-01-2023

Tender Details

Attending Leak Work At West Zone Ward No 15 To 19 30 To 37 42 44 - Attending 90Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 2 Attending 110Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 3 Attending 110Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 4 Attending 110Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 5 Attending 110Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 6 Attending 140Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 7 Attending 140Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 8 Attending 140Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 9 Attending 140Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 10 Attending 160Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 11 Attending 160Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 12 Attending 160Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 13 Attending 160Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 14 Attending 180Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 15 Attending 180Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Chargesusing 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 16 Attending 180Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 17 Attending 180Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 18 Attending 200Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 19 Attending 200Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 20 Attending 200Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 21 Attending 200Mm Dia Pvcpipe 4Ksc Leakupto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Pvc Pipe Withcoupler Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 22 Attending 110Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work Foordinary Soil, Dewatering Charges Using5hp Motor , Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 23 Attending 110Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work Foordinary Soil, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 24 Attending 110Mm Dia Hdpepipe Leak In Electrofusion Saddle Location Upto A Depth Of 1.20M Including Bt Road Earth Work Charges, Earth Work Foordinary Soil, Dewatering Charges Using5hp Motor , And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 25 Attending 140Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using5hp Motor , Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 26 Attending 140Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 27 Attending 160Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using5hp Motor, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 28 Attending 160Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 29 Attending 180Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using5hp Motor, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 30 Attending 180Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 31 Attending 200Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting Earth Work For Ordinary Soil, Dewatering Charges Using5hp Motor , Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 32 Attending 200Mm Dia Hdpepipe Pn6 Leak Upto A Depth Of 1.20M Including Bt Road Cutting, Earth Work For Ordinary Soil, Replacing Hdpe Pipe Withhdpemould Electro Fusion Coupler, Jointing Electro Fusion Welding Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 33 Attending 100Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 34 Attending 100Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 35 Attending 100Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 36 Attending 125Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 37 Attending 125Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 38 Attending 125Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 39 Attending 150Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 40 Attending 150Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 41 Attending 150Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 42 Attending 200Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 43 Attending 200Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Bt Road Cutting, , Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 44 Attending 200Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 45 Attending 250Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Rdinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 46 Attending 250Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 47 Attending 250Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 48 Attending 300Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.50M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 5Hp Motor , Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 49 Attending 300Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 1.80M Including Bt Road Cutting, Earth Work For Ordinary Soil, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 50 Attending 300Mm Dia Acpipe Calss 15 Leak Upto A Depth Of 2.10M Including Bt Road Cutting, Earth Work For Ordinary Soil, Shoring, And Strutting With Sheet Pilesby Driving On Both Sides Of The Trench From Ground Level Up To The Required Dept, Dewatering Charges Using 7.5Hp Motor, Replacing Ac Pipe Withc.I.D Joint Class 15 Charges And Refilling The Trench After Verfiying The Leak Including All Cost Of Material And Labour Charges Etc Complete 51 Repair And Maintance Of Existing 100 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 60Mmx60mmx60mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 52 Repair And Maintance Of Existing 150 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 65Mmx65mmx65mm, Ss Shafting 75Mm Dia And Height Of Stem 460Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 53 Repair And Maintance Of Existing 150 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 65Mmx60mmx65mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 54 Repair And Maintance Of Existing 200 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 65Mmx65mmx65mm, Ss Shafting 75Mm Dia And Height Of Stem 500Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 55 Repair And Maintance Of Existing 200 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 65Mmx65mmx65mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 56 Repair And Maintance Of Existing 250 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 70Mmx70mmx70mm, Ss Shafting 80Mm Dia And Height Of Stem 560Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 57 Repair And Maintance Of Existing 250 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 70Mmx70mmx70mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 58 Repair And Maintance Of Existing 300 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 75Mmx75mmx75mm, Ss Shafting 80Mm Dia And Height Of Stem 600Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 59 Repair And Maintance Of Existing 300 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 75Mmx75mmx75mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 60 Repair And Maintance Of Existing 350 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 80Mmx80mmx80mm, Ss Shafting 85Mm Dia And Height Of Stem 660Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 61 Repair And Maintance Of Existing 350 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 80Mmx80mmx80mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 62 Repair And Maintance Of Existing 400 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 80Mmx80mmx80mm, Ss Shafting 85Mm Dia And Height Of Stem 720Mm ( Checknut With Shaft ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete 63 Repair And Maintance Of Existing 400 Mm Sluice Valve Set Replacing Of Brass Square Bar Of Size 80Mmx80mmx80mm, ( Checknut ) , Ms Bolt Nut , Rubber Gascut With Therading , Holes And Lath Work Arrangements Including All Cost Of Material And Labour Charges Etc Complete

Key Value

Document Fees
INR 10620 /-
EMD
INR 33500.0 /-
Tender Value
INR 33.50 Lakhs /-

BOQ Items

Name of Work : Attending leak Work at West Zone (Ward No:15-19,30-37,42,44)
Sl. No. Item Description
1Attending 90mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
2Attending 110mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
3Attending 110mm dia PVCPipe 4KSC leakupto a depth of 1.50m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
4Attending 110mm dia PVCPipe 4KSC leakupto a depth of 1.80m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
5Attending 110mm dia PVCPipe 4KSC leakupto a depth of 2.10m including Bt road cutting,Earth work for ordinary soil, Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
6Attending 140mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
7Attending 140mm dia PVCPipe 4KSC leakupto a depth of 1.50m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
8Attending 140mm dia PVCPipe 4KSC leakupto a depth of 1.80m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
9Attending 140mm dia PVCPipe 4KSC leakupto a depth of 2.10m including Bt road cutting,Earth work for ordinary soil, Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
10Attending 160mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
11Attending 160mm dia PVCPipe 4KSC leakupto a depth of 1.50m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
12Attending 160mm dia PVCPipe 4KSC leakupto a depth of 1.80m including Bt road cutting,Earth work for ordinary soil, Dewatering charges using 7.5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
13Attending 160mm dia PVCPipe 4KSC leakupto a depth of 2.10m including Bt road cutting,Earth work for ordinary soil, Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
14Attending 180mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for Ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
15Attending 180mm dia PVCPipe 4KSC leakupto a depth of 1.50m including Bt road cutting,Earth work for Ordinary soil, Dewatering chargesusing 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
16Attending 180mm dia PVCPipe 4KSC leakupto a depth of 1.80m including Bt road cutting,Earth work for Ordinary soil, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
17Attending 180mm dia PVCPipe 4KSC leakupto a depth of 2.10m including Bt road cutting,Earth work for ordinary soil, Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
18Attending 200mm dia PVCPipe 4KSC leakupto a depth of 1.20m including Bt road cutting,Earth work for Ordinary soil, Dewatering charges using 5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
19Attending 200mm dia PVCPipe 4KSC leakupto a depth of 1.50m including Bt road cutting,Earth work for Ordinary soil, Dewatering charges using 5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
20Attending 200mm dia PVCPipe 4KSC leakupto a depth of 1.80m including Bt road cutting,Earth work for Ordinary soil, Dewatering charges using 7.5HP motor , replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
21Attending 200mm dia PVCPipe 4KSC leakupto a depth of 2.10m including Bt road cutting,Earth work for ordinary soil, Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5HP motor, replacing PVC pipe withCoupler charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
22Attending 110mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work foordinary soil, Dewatering charges using5HP motor , replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
23Attending 110mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work foordinary soil, replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
24Attending 110mm dia HDPEPipe leak in Electrofusion saddle location upto a depth of 1.20m including Bt road earth work charges, Earth work foordinary soil, Dewatering charges using5HP motor ,and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
25Attending 140mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using5HP motor , replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
26Attending 140mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil,replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
27Attending 160mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using5HP motor, replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
28Attending 160mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil, replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
29Attending 180mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using5HP motor, replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
30Attending 180mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil, replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
31Attending 200mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting Earth work for ordinary soil, Dewatering charges using5HP motor , replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
32Attending 200mm dia HDPEPipe PN6 leak upto a depth of 1.20m including Bt road cutting, Earth work for ordinary soil,replacing HDPE pipe withHDPEmould Electro Fusion Coupler, Jointing electro fusion welding charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
33Attending 100mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 5HP motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
34Attending 100mm dia ACPipe calss 15 leak upto a depth of 1.80m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
35Attending 100mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
36Attending 125mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
37Attending 125mm dia ACPipe calss 15 leak upto a depth of 1.80m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 7.5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
38Attending 125mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
39Attending 150mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
40Attending 150mm dia ACPipe calss 15 leak upto a depth of 1.80m including cutting, Earth work for ordinary soil, Dewatering charges using 7.5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
41Attending 150mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
42Attending 200mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
43Attending 200mm dia ACPipe calss 15 leak upto a depth of 1.80m including Bt road cutting,, Earth work for ordinary soil, Dewatering charges using 7.5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
44Attending 200mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
45Attending 250mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for rdinary soil, Dewatering charges using 5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
46Attending 250mm dia ACPipe calss 15 leak upto a depth of 1.80m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
47Attending 250mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
48Attending 300mm dia ACPipe calss 15 leak upto a depth of 1.50m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 5hp motor , replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
49Attending 300mm dia ACPipe calss 15 leak upto a depth of 1.80m including Bt road cutting, Earth work for ordinary soil, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
50Attending 300mm dia ACPipe calss 15 leak upto a depth of 2.10m including Bt road cutting, Earth work for ordinary soil,Shoring, and strutting with sheet pilesby driving on both sides of the trench from Ground Level up to the required dept, Dewatering charges using 7.5hp motor, replacing AC pipe withC.I.D Joint class 15 charges and refilling the trench after verfiying the leak including all cost of material and labour charges etc complete
51Repair and maintance of existing 100 mm Sluice valve set replacing of brass square bar of size 60mmx60mmx60mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
52Repair and maintance of existing 150 mm Sluice valve set replacing of brass square bar of size 65mmx65mmx65mm, SS shafting 75mm dia and height of stem 460mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
53Repair and maintance of existing 150 mm Sluice valve set replacing of brass square bar of size 65mmx60mmx65mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
54Repair and maintance of existing 200 mm Sluice valve set replacing of brass square bar of size 65mmx65mmx65mm, SS shafting 75mm dia and height of stem 500mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
55Repair and maintance of existing 200 mm Sluice valve set replacing of brass square bar of size 65mmx65mmx65mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
56Repair and maintance of existing 250 mm Sluice valve set replacing of brass square bar of size 70mmx70mmx70mm, SS shafting 80mm dia and height of stem 560mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
57Repair and maintance of existing 250 mm Sluice valve set replacing of brass square bar of size 70mmx70mmx70mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
58Repair and maintance of existing 300 mm Sluice valve set replacing of brass square bar of size 75mmx75mmx75mm, SS shafting 80mm dia and height of stem 600mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
59Repair and maintance of existing 300 mm Sluice valve set replacing of brass square bar of size 75mmx75mmx75mm,( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
60Repair and maintance of existing 350 mm Sluice valve set replacing of brass square bar of size 80mmx80mmx80mm, SS shafting 85mm dia and height of stem 660mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
61Repair and maintance of existing 350 mm Sluice valve set replacing of brass square bar of size 80mmx80mmx80mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
62Repair and maintance of existing 400 mm Sluice valve set replacing of brass square bar of size 80mmx80mmx80mm, SS shafting 85mm dia and height of stem 720mm( checknut with shaft), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
63Repair and maintance of existing 400 mm Sluice valve set replacing of brass square bar of size 80mmx80mmx80mm, ( checknut ), MS bolt nut , Rubber gascut with therading , holes and lath work arrangements including all cost of material and labour charges etc complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail