Tender For Hot Line Maintenance Of Various Equipments Installed In 400/132 Kv Switchyard Of ‘A’ & ‘B’Tps Anpara.
Tender Overview
Project Description
Hot Line Maintenance Of Various Equipments Installed In 400 / 132 Kv Switchyard Of ‘A’ & ‘B’Tps Anpara.-2 Thermovision Scanning Of Switchyard Equipment Including St Bays For Detecting Hotspots , If Any, 3 Checking Of Healthiness And Taking Corrective Measures By Tightening / Replacing ( If Required ) Of Bolts & Nut`S Of Connectors At All Equipment Used In The 132 Kv Bays ( Directly Connected To Charged Line ) 4 Checking Of Healthiness And Taking Corrective Measuresby Tightening / Replacing ( If Required ) Of Bolts & Nuts For Bus-I, Bus-Ii & Jack Bus Of 132Kv Bays 5 Changing Of Pg Clamps Of 132 Kv System ( Directly Connected To Charged Line ) 6 Testing Of Healthiness Of Disc Insulator With Positron Tester Of 132 Kv Bays ( Directly Connected To Charged Line ) 7 Replacement Of Damaged Contact Of One Pole Of Bus Isolators In Live Condition Of 132Kv Switchyard 8 Lubrication Of 132 Kv Isolator Mechanical Joints For Smooth Operation ( Directly Connected To Charged Line ) 9 Changing Of Damaged Insulator Strings Of 132 Kv Bays. 10 Tension 11 Suspension 12 Replacement Of Damaged Jumper / Conductor Of 132Kv. 13 Strengthening Of Damaged Bus Conductor / Jumper Of 132Kv. 14 Replacement Of Damaged Arm Of One Pole Of Bus Isolators In Live Condition Of 132Kv Switchyard. 15 Hot Line Maintenance Of Various Equipment Installed In 400Kv Switchyard 16 Thermovision Scanning Of Switchyard Equipment Including Gt Bays For Detecting Hotspots , If Any 17 Checking Of Healthiness And Taking Corrective Measures By Tightening / Replacing ( If Required ) Of Bolts & Nuts Of Connectors At All Equipment Used In The 400 Kv Bays ( Directly Connected To Charged Line ) 18 Checking Of Healthiness And Taking Corrective Measuresby Tightening / Replacing ( If Required ) Of Bolts & Nuts For Bus-I, Bus-Ii, Jack Bus Of 400 Kv Bays 19 Changing Of Pg Clamps Of 400 Kv System ( Directly Connected To Charged Line ) 20 Testing Of Healthiness Of Disc Insulator With Positron Tester Of 400 Kv Bays ( Directly Connected To Charged Line ) 21 Lubrication Of 400 Kv Isolator Mechanical Joints For Smoother Operation. ( Directly Connected To Charged Line ) 22 Changing Of Damaged Insulator Strings Of 400 Kv Bays. 23 Tension 24 Suspension 25 Replacement Of Damaged Jumper / Conductor Of 400Kv. 26 Strengthening Of Damaged Bus Conductor / Jumper Of 400Kv. 27 Replacement Of Trapeze Rod ( Fixed Contact Of Pantograph Isolators ) .
BOQ
| Sl. No. | Item Description |
| 1 | Hot line maintenance of various equipment installed in 132KV switchyard |
| 2 | Thermovision scanning of switchyard equipment including ST bays for detecting hotspots , if any, |
| 3 | Checking of Healthiness and taking corrective measures by tightening / replacing (if required) of Bolts & Nut`s of Connectors at all equipment used in the 132 KV Bays (directly connected to charged line) |
| 4 | Checking of Healthiness and taking corrective measuresby tightening / replacing (if required)of Bolts & Nuts for Bus-I, Bus-II & Jack Bus of 132KV Bays |
| 5 | Changing of PG Clamps of 132 KV System (directly connected to charged line) |
| 6 | Testing of Healthiness of Disc Insulator with Positron Tester of 132 KV Bays (directly connected to charged line) |
| 7 | Replacement of damaged contact of one pole of bus isolators in live condition of 132KV switchyard |
| 8 | Lubrication of 132 KV Isolator mechanical joints for smooth operation (directly connected to charged line) |
| 9 | Changing of Damaged Insulator Strings of 132 KV Bays. |
| 10 | TENSION |
| 11 | SUSPENSION |
| 12 | Replacement of Damaged Jumper/Conductor of 132KV. |
| 13 | Strengthening of damaged bus Conductor/Jumper of 132KV. |
| 14 | Replacement of damaged Arm of one pole of Bus isolators in live condition of 132KV switchyard. |
| 15 | Hot line maintenance of various equipment installed in 400KV switchyard |
| 16 | Thermovision scanning of switchyard equipment including GT bays for detecting hotspots , if any |
| 17 | Checking of Healthiness and taking corrective measures by tightening / replacing (if required) of Bolts & Nuts of Connectors at all equipment used in the 400 KV Bays (directly connected to charged line) |
| 18 | Checking of Healthiness and taking corrective measuresby tightening / replacing (if required) of Bolts & Nuts for Bus-I, Bus-II, Jack Bus of 400 KV Bays |
| 19 | Changing of PG Clamps of 400 KV System (directly connected to charged line) |
| 20 | Testing of Healthiness of Disc Insulator with Positron Tester of 400 KV Bays (directly connected to charged line) |
| 21 | Lubrication of 400 KV Isolator mechanical joints for smoother operation. (directly connected to charged line) |
| 22 | Changing of Damaged Insulator Strings of 400 KV Bays. |
| 23 | TENSION |
| 24 | SUSPENSION |
| 25 | Replacement of Damaged Jumper/Conductor of 400KV. |
| 26 | Strengthening of damaged bus Conductor/Jumper of 400KV. |
| 27 | Replacement of Trapeze Rod (fixed contact of pantograph isolators). |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender