Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Running Contract For Electrical Works In Pudukkottai Town Sub- Division/Pudukkottai Division In Pudukkottai Edc. Submission Date for this Tender is 24-01-2023. Coats and Jackets Tenders in pudukkottai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | TOWN PUDUKKOTTAI RUNNING CONTRACT |
2 | EXCAVATION OF POLE PITS / Stay Set: |
3 | For pole upto 8.00m length by using JCB/Manual |
4 | For pole above 8.00m length by using JCB/Manual |
5 | In Hard Soil (common to all size of poles) |
6 | In rocky area (common to all size of poles) by blasting / Manual |
7 | Excavation of Stay pit of 4.5 " to 5 "depth using JCB / Manual |
8 | Excavation of Stay pit in Hard rock soil |
9 | ERECTION OF POLES AND ACCESSORIES |
10 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
11 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
12 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
13 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
14 | Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
15 | Erection of stay set complete in the rock area by blasting |
16 | Fixing of Line Materials |
17 | V cross arm 3.5feet |
18 | V cross arm4.5 feet |
19 | V cross arm5.0 feet |
20 | Fixing of LT S phase cross arm |
21 | Fixing of LT 3 phase cross arm |
22 | Fixing of HT / LT Ti fitting |
23 | Fixing of HT PIN insulator with Pin 11 kv |
24 | Fixing of HT PIN insulator with Pin 22 kv |
25 | Fixing of HT PIN insulator with Pin 33 kv |
26 | Fixing of LT PIN insulator |
27 | Fixing of HT strain disc 11 KV |
28 | Fixing of HT strain disc 22 KV |
29 | Fixing of HT strain disc 33 KV |
30 | Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc.. |
31 | Set right of all sizes of leaning poles |
32 | Fixing of shackle |
33 | Fixing of Aluminium knob |
34 | Fixing of HT LAS (3 Nos.) |
35 | Fixing of LT LAS (3 Nos.) |
36 | Fixing of Tapping Channel X Arm |
37 | STRINGING OF CONDUCTORS: |
38 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
39 | Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
40 | Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. |
41 | Paving and stringing of conductors of7/4.09mm ACSR or other equivalent conductor |
42 | Paving and stringing of conductors of7/4.72 mm Dog Conductor or other equivalent conductor |
43 | Releasing and reerection (resagging) of one run of all sizes of conductor |
44 | ERECTION OF DISTRIBUTION TRANSFORMERS: |
45 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) |
46 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. |
47 | (i) Upto 25 KVA Distribution transformer / Metering set. |
48 | (ii) Above 25 KVA to 100 KVA |
49 | (iii) Above 100 KVA to 250 KVA |
50 | (iv) 500 KVA and above |
51 | (V) Failed DT replacement below 100 KVA |
52 | (vi) Failed DT replacement 100 KVA and above |
53 | Erection of 11 KV single pole Structure including erection of DT complete without centre support (Data as per Annexure III) |
54 | Erection of 11 KV Single Pole structure including erection of DT complete with centre support ( Data as per Annexure III) |
55 | ERECTION OF DP STRUCTURE: |
56 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I) |
57 | (i) With 11 KV AB switch using all types of poles of size 9.14 m and above length |
58 | (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length |
59 | Erection of single pole DP with completeand with single earth |
60 | CONCRETING WORKS: |
61 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) |
62 | (i) Mass concreting of poles |
63 | (ii) Sleeveconcreting |
64 | (iii) Stay concreting |
65 | EARTHING: |
66 | (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
67 | (ii) Provision of spike including earthing arrangement |
68 | (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
69 | (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
70 | (v) Replacement of corroded earth pipe |
71 | LOADING AND UNLOADING CHARGES: |
72 | Loading or unloading of Distribution Transformer |
73 | (i) Upto 100 KVA |
74 | (ii) Above 100 KVA and upto 500 KVA |
75 | (iii) Metering set of all ratios |
76 | Loading or unloading of various sizes of poles |
77 | (i) REC, RCC, PSC pole upto 8.00 m length |
78 | (ii) All REC, RCC pole above 8.00 m length |
79 | (iii) Metal poles all sizes |
80 | Loading of Conductor |
81 | Unloading of Conductor |
82 | Loading / Unloading of Iron & Steel |
83 | Loading / Unloading of Oil |
84 | Loading / Unloading of line materials |
85 | Loading / Unloading of 11 KV strain disc |
86 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
87 | Loading / Unloading of meters |
88 | (i) Single Phase Meter |
89 | (ii) Three Phase Meter |
90 | Guarding Arrangement |
91 | Provision of guarding with two numbers earth pits excluding stay set erection |
92 | (i) Flat guarding with earth pit |
93 | (ii) Split neutral |
94 | TRANSPORTATION CHARGES: |
95 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
96 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) |
97 | (i) For a lead upto 5 KM |
98 | (ii) Above 5 KM of lead of every KM |
99 | Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location |
100 | (i) Upto 1 KM |
101 | (ii) Above 1 KM per each KM |
102 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
103 | (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
104 | (ii) Above 10 KM |
105 | Dismantling Charges |
106 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit |
107 | For breaking the mass concrete of all supports |
108 | Dismantling of stay set complete |
109 | (i) including stay rod |
110 | (ii) Without stay rod |
111 | Dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
112 | Dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
113 | Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side |
114 | Dismantling of Cross arm clamps TI fitting hardwares, insulators etc., |
115 | PAINTING: |
116 | Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT |
117 | Numbering of poles including base painting and with cost of paint |
118 | Painting of iron poles up to 36 ft length with double coats including cost of paint |
119 | Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint |
120 | Painting of Cement poles by Distember coating including cost of distember |
121 | Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
122 | Service Connection Details painting |
123 | WORKSHOP CHARGES: |
124 | Manufacturing / Altering of Clamps |
125 | Drilling of holes in the structure materials clamps etc., |
126 | GENERAL: |
127 | Numbering of Poles including cost of paint |
128 | Painting of RCCpoles Including cost of distember |
129 | Clearing of tree braches of coconut trees |
130 | Clearing of tree braches of Neem, Tamarin, Country etc |
131 | Leveling of Ground using Bul Dozer |
132 | Clearing of Branches / Trees with JCB |
133 | Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection.(including all materials) |
134 | LAYING OF HT CABLE |
135 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road |
136 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road |
137 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road |
138 | Loading and unloading of HT Cable including coiling and recoiling |
139 | Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km |
140 | Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km |
141 | Laying of 11KV 3 X 300 sq mm XLPE cable |
142 | Laying of 11KV 3 X 120 sq mm XLPE cable |
143 | Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough |
144 | Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
145 | Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km |
146 | Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km |
147 | Laying of HT UG cable using Trenchless Method |
148 | Laying of HT UG cable using Trenchless Method with Pipes |
149 | Laying of HT UG cable using Trenchless Method withoutPipes |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail