Supply Of Distribution Transformers Supply Of Distribution Transformers For Numaligarh Refinery Expansion Project , 6.6/0.433Kv, 2Mva, Dyn11, Z=8.5% Without -Ve Tolerance,Onan, With Octc Of Range +/-5% In Steps Of 2.5% Per Step Along With 2 Nos. Of Neutral Cts (3200A/1A Clps15va, 3200/1A Cl5p20 15Va) Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 And Including Supply Of Suitable Double Compression Glands And Lugs For Power And Control Cables (Secondary Side Shall Be Suitable For Bus Duct Connection) , 6.6/0.433Kv, 2Mva, Dyn11, Z=8.5% Without -Ve Tolerance,Onan, With Octc Of Range +/-5% In Steps Of 2.5% Per Step Along With 2 Nos. Of Neutral Cts (3200A/1A Clps15va, 3200/1A Cl5p20 15Va) Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 And Including Supply Of Suitable Double Compression Glands And Lugs For Power And Control Cables (Secondary Side Suitable For Cable Connection For The Cable Size Mentioned In Technical Notes-7) , 6.6/0.433Kv, 2.5Mva, Dyn11, Z=8.5% Without -Ve Tolerance, Onan With Octc Of Range +/-5% In Steps Of 2.5% Per Step Along With 2 Nos. Of Neutral Cts (4000A/1A Clps15va, 4000/1A Cl5p20 15Va) Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 And Including Supply Of Suitable Double Compression Glands And Lugs For Power And Control Cables (Secondary Side Shall Be Suitable For Bus Duct Connection) , 6.6/0.433Kv, 0.8Mva, Dyn11, Z=5% Without -Ve Tolerance, Onan With Octc Of Range +/-5% In Steps Of 2.5% Per Step Along With 2 Nos. Of Neutral Cts (1250A/1A Clps15va, 1250/1A Cl5p20 15Va) Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 And Including Supply Of Suitable Double Compression Glands And Lugs For Power And Control Cables (Secondary Side Suitable For Cable Connection For The Cable Size Mentioned In Technical Notes-8) , 6.6/0.433Kv, 1.25Mva, Dyn11, Z=5% Without -Ve Tolerance, Onan With Octc Of Range +/-5% In Steps Of 2.5% Per Step Along With 2 Nos. Of Neutral Cts (2000A/1A Clps15va, 2000/1A Cl5p20 15Va) Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 And Including Supply Of Suitable Double Compression Glands And Lugs For Power And Control Cables (Secondary Side Shall Be Suitable For Bus Duct Connection) , Mandatory Spares As Per Spare Parts – Special Tools And Consumables Philosophy Annexure-4 “Tp-1Zzza-Pq-Prc-0005” For Distribution Transformer (2.5Mva) , Mandatory Spares As Per Spare Parts – Special Tools And Consumables Philosophy Annexure-4 “Tp-1Zzza-Pq-Prc-0005” For Distribution Transformer (2Mva) , Mandatory Spares As Per Spare Parts – Special Tools And Consumables Philosophy Annexure-4 “Tp-1Zzza-Pq-Prc-0005” For Distribution Transformer (1.25Mva) , Mandatory Spares As Per Spare Parts – Special Tools And Consumables Philosophy Annexure-4 “Tp-1Zzza-Pq-Prc-0005” For Distribution Transformer (0.8Mva) , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above Distribution Transformers , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above Distribution Transformers , Training To 10 Nos. Of Owner Personnel At Nrep Site For 1 Week For The Entire Package (Including Condition Monitoring). , Training To 2 Nos. Of Owner Personnel At Oem’S Factory For 1 Week For The Entire Package (Including Condition Monitoring). , Bidder Shall Provide Per Diem Rate For Supervision Services For Installation, Testing And Commissioning For The Entire Package Including Commissioning / Support Engineer From Oem Shall Be Stationed At Nrep Site For The Duration Of 1 Month From The Date Of Commissioning & Handover For The Entire Package