}

Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Udaipur In The State Of Tripura Under Pm Gati Shakti, Udaipur-Tripura

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Udaipur In The State Of Tripura Under Pm Gati Shakti. Submission Date for this Tender is 01-02-2023. Detail Project Report Tenders in Udaipur Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

35680041
Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Udaipur In The State Of Tripura Under Pm Gati Shakti
Open Tender
Indian
Tripura
Udaipur
01-02-2023

Tender Details

Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Udaipur In The State Of Tripura Under Pm Gati Shakti

Key Value

Document Fees
INR 5900 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Udaipur in the State of Tripura under PM Gati Shakti.
Sl. No. Item Description
1Remuneration for Local Staff (inclusive of per Diem allowance)
2Team Leader
3Logistics Park Planner
4Warehousing Expert
5Freight Transport Planner
6Financial cum Market Analyst
7Environment cum Social Expert
8Rail Engineer
9Road Engineer
10Hydrographic Expert
11Sub-Professional Staff
12Assistant Logistics Park Planner
13Assistant Warehousing Expert
14Assistant Freight Transport Planner
15Assistant Financial cum Market Analyst
16Assistant Environment cum Social Expert
17Assistant Rail Engineer
18Assistant Road Engineer
19Assistant Hydrographic Expert
20Cost towards preparation of Inception Report for MMLP at Udaipur, complete in all aspects.
21Cost towards DPR preparation of External Road Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external road/s connectivity complete in all respect including incidental to the work).
22Cost towards DPR preparation of External Rail Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external rail connectivity complete in all respect including incidental to the work).
23Cost towards DPR preparation of Inland Water Transport (IWT) Terminal complete in all respect including incidental to the work.
24Other Overheads (Fixed Cost)
25Overheads such as Transportation cost, office rent, office supplies, communications, furniture, equipment, and other overheads incidental to the work.
26Reports, Document Printing, 3D Model and Graphic video
27Inception Report including proposed connectivity for external trunk infrastructure in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)
28Trunk infrastructure gap assessment with draft market overview report for finalisation and approval of suitable site for MMLP in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)
29(i) Submission of alternatives for concept Master plan and engineering designs and plans for the selected site and detailed Master plan options for MMLP with preliminary financial case assessment. (ii) Submission of all statutory documents for clearances related to Land Acquisition such as 3a, 3A, 3D and 3G notifications, forest clearance stage 1 and draft environment impact assessment report (EIA) clearance, Social Impact Assessment (SIA) and documents related to other clearances required. (iii) Assessment of shifting of utilities required and providing road and rail connectivity with requisite land parcel (iv) Draft Feasibility Report of External Road and Rail Trunk Connectivity Infrastructure. All submissions at (i) to (iv) above shall be in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)
30Finalization of Master plan and Basic Architecture design (2D and 3D) and plans after due consultation with client and relevant stakeholders and Final Feasibility Report of MMLP and External Road and Rail Trunk Connectivity Infrastructure in a set containing 5 (five) Hard Copies + 1 (One) Soft Copy.
31(i) Draft Detailed Project Report for MMLP including EIA report, EMP and Social Impact Assessment (SIA) report detailed Economic Analysis, Financial Feasibility and Project Structuring aspects etc. (ii) Draft Detailed Project Report for External Rail and Road Connectivity Infrastructure. All submissions at (i) & (ii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy.
32(i) Final Detailed Project Report for MMLP after incorporating comments and observations of NHIDCL and other Competent Authorities including submission of bid documents including draft Consession Agreement and technical schedule for selection of developing agency. Submission of physical 3D model and simulation graphic video with voice over. (ii) Final Detailed Project Report for External Rail and Road Trunk connectivity infrastructure and including submission of bid document including draft CA and TS for selection of developing agency. All submissions at (i) & (ii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy.
33(i) Obtaining EIA clearance, Stage 1 Forest Clearance and obtaining other final statutory clearances; (ii) 3G notification related to land acquisition as per LA Act. (iii) Obtaining final estimates for Utility shifting and requisite utilities required for Multi-Modal Logistics Park from the concerned agencies and submission to client. All submissions at (i) & (iii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy.
343D model
35Simulation Graphic Video with voice over
36Survey and Investigation related to land parcel of MMLP
37Topograhical Survey (Fixed Rate): Topograhic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. Inclusive of cost of materials, labourer.
38Topograhical Survey (Fixed Rate): Detailed topograhic survey using mobile/ aerial LiDAR or equivalent technology.
39GPR for mapping utilities
40Other Engineering Investigation (Fixed cost)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail