Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #35623623

Survey, Design And Construction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Pro

Issued by Government Departments · jakholi, Uttarakhand
Tender Value
4.04 Crore
Estimated cost
Bid Submission
14 Jan 2023
0 days left
EMD
8.10 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jakholi → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Survey, Design And Construction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing & Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance.Devidhar Chirbatiya Solar Pumping W / S Scheme & Budhana W / S Scheme Of Block Jakholi,

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 07-Jan-2023 Regarding Date Corrigendum Other 14-Jan-2023
2 10-Jan-2023 Corrigndum Other 14-Jan-2023

BOQ

Name of Work: Survey, design andconstruction of following water supply scheme, Consisting of Source Work, Supply main, RCC CWRs, distribution systems, FHTC and all other appurtenant works including supply & cartage of all materials, labor and t&p etc. complete for proper completion of works. it is also including testing & commissioning ofscheme with six months trial & run after handing over the scheme to ujs for its maintenance.Devidhar chirbatiya Solar Pumping W/S Scheme & Budhana W/S Scheme of Block Jakholi,
Sl. No. Item Description
1SOURCE WORKS
2Construction ofIntake chamber to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
3Construction of RCC Gadhera tapping arrangement i.e., 4m wide Cross wall Boulder Filled Gallery with Intake chamberto fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge.
4Construction of Extra length R.C.C Cross wallincluding supply of all materials, labour, T&P etc. required for proper completion of work
5Constructionof Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
6Providing of all materials, Carting from site store to site of work,Lowering into trenches with true to alignment, Laying of MSERW, Jointingby electric welding process with proper grade ofeletrodes suitable for jointing of water supply pipe lines (Ador,L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
7From MPS to Top Cwr. MS ERWPipe 65 mm Dia 4 mm Thickness
8Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works.
915 mm dia - GI (M)
1020 mm dia - GI (M)
1125 mm dia - GI (M)
1232 mm dia - GI (M)
1340 mm dia - GI (M)
1450 mm dia - GI (M)
1565 mm dia - GI (M)
16Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
1715mm dia
1820mm dia
1925mm dia
2032mm dia
2140mm dia
2250mm dia
2365mm dia
24Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
25Soil mixed with boulder (SMB)
26Medium Rock (MR)
27Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2820 mm dia
2925 mm dia
3032mm dia
3140mm dia
3250mm dia
3365mm dia
34Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
3520 mm dia
3650mm dia (CI Air Valve)
37ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
38Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(0.90x0.90x1.0)
39Supply of all materials, labour, T & P etc. and Construction of size Air Valve Chamber as per type design complete(0.90x0.90x1.0)
40ACTARIS Bulk Water Meters model Woltex Class B magnetically coupled pre equipped for remote reading
4165 mm dia
42Supply of all materials, labour, T&P etc. and construction of (0.90x0.90x1.0)m size Bulk Water Meter Chamber with FPS bricks
43Supply of all materials, labour, T & P etc. and Construction ofR.C.C Anchor Blockas per type design complete
44Makig2 M wide Briddle path forrising main including hill side cutting and coolie walling of all materials, labour, T & P etc.
45Painting of API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm)
4665 mm dia
47Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, with supply of all materials Labour, T&P etc and construction of RCC CWR of following capacities (in kiloliters) with M.S. ladder outside & inside of the tank, M.S. M.H. Cover with locking arrangement, supply and fixing of outlet, inlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body vertical pipes, ladder, M.S. M.H. cover etc. complete with approved water proofing (apex)/enamel paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8 MT/M2
487.50 KL
4920.00 KL
5022.50 KL
5140.00KL
5250.00KL
5360.00 KL
54Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
55Supply of all materials, labours, T&P etc and construct og Break Pressure Tank
56Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
57Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
58Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
59R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
60R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
61Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete
62Provision of Barbed Wire Fencing through angle iron posts around the water works site
63Provision of M.S. Iron Gate with Pillars of 3.6 m wide
64Provision ofPannel Room 1.5 x1.5x2.0 sizes complete
65Supply & installation of solar Submersible Pump, Control Panel, Solar Panels, wiring, automationincluding supply of all materials,labour, T&P etc complete as per latest specification and direction as per engineer in charge.
66MPS to IPS Ist ( 150 LPM discharge and 171 m head)
67IPS 1st to IPS IInd ( 150 LPM discharge and 186 m head)
68IPS IInd to Top CWR ( 150 LPM discharge and 177 m head)
69Solar panel 335 WP x 144 = 48240 watt with GI structure
70Control Panel/VFD panel hybrid controller (solar+Grid)
71Complete Wiring of all the above system
72Earthing of above system
73Installation of all the above system
74Construction of of electrical Pole and Grouting etcincluding supply of all materials,labour, T&P etc. complete.

AI Tender Summary

OUR REF NO 35623623
AUTHORITY Government Departments
TENDER VALUE 4.04 Crore
LAST DATE 14-01-2023
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Survey, Design And Construction Of Following Water Supply Scheme, Consisting Of Source Work, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing & Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance.Devidhar Chirbatiya Solar Pumping W / S Scheme & Budhana W / S Scheme Of Block Jakholi,
Basic Detail
Tender No 05/Lekha-05/03 Dated 02.01.2023
Bidding Type Tender
Location
City jakholi
State Uttarakhand
Key Dates
Publish Date 10 Jan 2023
Submission Date 14 Jan 2023
Open Date 17 Jan 2023
Finance
Tender Value 4.04 Crore
Tender Fee 5900
EMD 8.10 Lakhs
Exemption Not Available
Document List
208459b9-a435-465d-abba-194ee0c2bf70.html
BOQ_65313.xls
DevidharChirbatiyaTD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 10, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 14, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 14, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 14, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 17, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

208459b9-a435-465d-abba-194ee0c2bf70.html

xls

BOQ_65313.xls

pdf

DevidharChirbatiyaTD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders