| 1 | CIVIL WORK |
| 2 | Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compoundin places shown with initial lead of 10 mts and initial lift of 2 mts. clearing, levelling the site, shoring, strutting, bailing of water wherever necessaryetc., complete complying with standard specificationand as directed. |
| 3 | Supplying and filling in foundation and basement with clean M.sand in layers ofnot exceeding 150mm thick well watered, rammed and consolidated including watering etc., complete complying with standard specification and as directed. |
| 4 | Cement Concrete 1:4:8(one cement,four sand and eight aggregate) using 40mm gauge hard broken granite stone jelly including dewatering, side shuttering, strutting, wherever necessaryincluding curing etc., complete complying with standard specification and as directed. |
| 5 | Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir,wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., CompleteFor plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams etc., |
| 6 | For plane surfaces such as rectangular or square RCC coluns, sunshades, top and bottom slab of RCC boxing etc., |
| 7 | Cement concrete 1:1 1/2:3(One Cement, One and Half Sand and Three Aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, strutting and shuttering, cost of steel and fabrication of reinforcement and placing of grills in position but including curing finishing etc., complete complying with standard specifications and as directed. |
| 8 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C. works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed. |
| 9 | Plain Cement Concrete 1:2:4(one cement,two sand and four aggregate) using 40mm gauge hard broken granite stone jelly including dewatering, side shuttering, strutting, wherever necessaryincluding curing etc., complete complying with standard specification and as directed. |
| 10 | Paintingthe walls with two coats ofready mixed plastic emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed. |
| 11 | Painting old iron works with two coats of synthetic enamel paint of approved quality and colour over the red oxide primer in all floor including cost ofscaffolding, brushes etc., complete complying with standard specification and as directed. |
| 12 | PLASTERING the walls with C.M.1:3(one cement and three sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard Specification and as directed. |
| 13 | Supplying laying and jointing PVC pipes (having working pressure 10 kg/sq.cm) of approved quality and best variety conforming to BIS of the following dia including cutting, threading and fixing PVC specials using PVC adhesives (but excluding cost of such specials) and fixing into wall with teak wood plugs, PVCclams and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work/ cement concrete and plastering neatly wherever necessary with necessary scaffolding charges upto 4 metre height above ground level etc., complete complying with standard specifications.The PVC pipes shall be got approved by Executive Engineer before use on works.25mm dia PVC pipe |
| 14 | 20mm dia PVC pipe |
| 15 | Supplying and fixing PVC coupler of 25mm diafor both internal and external water supply arrangements |
| 16 | Supplying and fixing PVC bend of 25mm diafor both internal and external water supply arrangements |
| 17 | Supplying and fixing in position of best Indian make PVCWater Tank of 500 litres capacity confirming to ISI standards as directed by the departmental officers including cost of material and conveyance charges of material to work site etc., complete complying with standard specifications. |
| 18 | U PVC ball valve with one side compression end and other side female end as per ISO 4422-4 and Tested as per BS 6920 in WRC – NSF LTD, UK size20mm ODx1/2” ID 25mm ODx1/2” and 32mm ODx3/4” ID.Ball valve 25mm dia |
| 19 | Ball valve 32mm dia |
| 20 | Supplying and filling in basement with wetmix 250mm thickin layers of not exceeding 250mm thick, well watered, rammed andconsolidated including machineries for hire and runningcharges leader 5 Cum capacity, hire charges for tipper, water sprinkler, vibratory roller all labour charges etc., complete complying with standard specification and as directed. |
| 21 | Providing name board arrangements at existing wall excluding cost of one coat of primer and including two coat of synthetic enamel paint of approved quality and colourin all floors.The rate is inclusive ofcost of writing letters, all materials, labour charges, scaffolding charges etc., complete complying with standard specifications. (The paint should be got approved by the Executive Engineer before use on works). |
| 22 | Sectioning and levelling the site by using JCB including cost of hire charges, fuel charges etc. complete as directed by the departmental officers. |